Class I – installation or alteration etc of stand-alone wind turbine on domestic premises

Permitted Development

I.  The installation, alteration or replacement of a stand-alone wind turbine for microgeneration within the curtilage of a dwellinghouse or a block of flats.

Development not permitted

I.1  Development is not permitted by Class I unless the stand-alone wind turbine complies with the MCS Planning Standards or equivalent standards.

I.2  Development is not permitted by Class I if—

(a)in the case of the installation of a stand-alone wind turbine, the development would result in the presence of more than 1 stand-alone wind turbine within the curtilage of the dwellinghouse or block of flats;

(b)in the case of the installation of a stand-alone wind turbine, a wind turbine is installed on the dwellinghouse or on a building within the curtilage of the dwellinghouse or the block of flats;

(c)in the case of the installation of a stand-alone wind turbine, an air source heat pump is installed on the dwellinghouse or block of flats or within the curtilage of the dwellinghouse or block of flats;

(d)the highest part of the stand-alone wind turbine would exceed 11.1 metres in height;

(e)the distance between ground level and the lowest part of any blade of the stand-alone wind turbine would be less than 5 metres;

(f)any part of the stand-alone wind turbine (including blades) would be located in a position which is less than a distance equivalent to the overall height (including blades) of the stand-alone wind turbine plus 10% of its height when measured from any point along the boundary of the curtilage;

(g)the swept area of any blade of the stand-alone wind turbine exceeds 3.8 square metres;

(h)the stand-alone wind turbine would be installed on safeguarded land;

(i)the stand-alone wind turbine would be installed on a site designated as a scheduled monument;

(j)the stand-alone wind turbine would be installed within the curtilage of a building which is a listed building;

(k)in the case of land within a conservation area, the stand-alone wind turbine would be installed so that it is nearer to any highway which bounds the curtilage than the part of the dwellinghouse or block of flats which is nearest to that highway; or

(l)the stand-alone wind turbine would be installed on article 2(3) land other than land within a conservation area.

Conditions

I.3  Development is permitted by Class I subject to the following conditions—

(a)the blades of the stand-alone wind turbine is made of non-reflective materials;

(b)the stand-alone wind turbine is, so far as practicable, sited so as to minimise its effect on the amenity of the area; and

(c)the stand-alone wind turbine is removed as soon as reasonably practicable when no longer needed.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?