SCHEDULE 2E+WPermitted development rights

PART 14E+WRenewable energy

Class H – installation or alteration etc of wind turbine on domestic premisesE+W

H.2  Development is not permitted by Class H if—E+W

(a)in the case of the installation of a wind turbine the development would result in the presence of more than 1 wind turbine on the same building or within the curtilage;

(b)in the case of the installation of a wind turbine, a stand-alone wind turbine is installed within the curtilage of the dwellinghouse or the block of flats;

(c)in the case of the installation of a wind turbine, an air source heat pump is installed on the same building or within its curtilage;

(d)the highest part of the wind turbine (including blades) would either—

(i)protrude more than 3 metres above the highest part of the roof (excluding the chimney); or

(ii)exceed more than 15 metres in height,

whichever is the lesser;

(e)the distance between ground level and the lowest part of any blade of the wind turbine would be less than 5 metres;

(f)any part of the wind turbine (including blades) would be positioned so that it would be within 5 metres of any boundary of the curtilage of the dwellinghouse or the block of flats;

(g)the swept area of any blade of the wind turbine would exceed 3.8 square metres;

(h)the wind turbine would be installed on safeguarded land;

(i)the wind turbine would be installed on a site designated as a scheduled monument;

(j)the wind turbine would be installed within the curtilage of a building which is a listed building;

(k)in the case of land within a conservation area, the wind turbine would be installed on a wall or roof slope of—

(i)the detached dwellinghouse; or

(ii)a building within the curtilage of the dwellinghouse or block of flats,

which fronts a highway; or

(l)the wind turbine would be installed on article 2(3) land other than land within a conservation area.