Permitted developmentE+W
This section has no associated Explanatory Memorandum

B.  Development by or on behalf of a sewerage undertaker consisting of—

(a)development not above ground level required in connection with the provision, improvement, maintenance or repair of a sewer, outfall pipe, sludge main or associated apparatus;

(b)the provision of a building, plant, machinery or apparatus in, on, over or under land for the purpose of survey or investigation;

(c)the maintenance, improvement or repair of works for measuring the flow in any watercourse or channel;

(d)the installation in a sewerage system of a pumping station, valve house, control panel house or switch-gear house;

(e)any works authorised by or required in connection with an order made under section 73 of the Water Resources Act 1991 (power to make ordinary and emergency drought orders)M1;

(f)any other development in, on, over or under their operational land, other than the provision of a building but including the extension or alteration of a building.

Marginal Citations

M11991 c. 57; which was amended by Schedule 22 to the Environment Act 1995 and S.I. 2013/755.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?