2015 No. 1666
Infrastructure Planning

The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015

Made
Coming into force
An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 20081, to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 20112 for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 20133.

The Secretary of State, having considered the application, and having consulted in accordance with regulation 7(1) of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.

The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order:

Citation and commencement1.

This Order may be cited as the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and comes into force on 10th September 2015.

Amendment of the Hinkley Point C (Nuclear Generating Station) Order 20132.

The Hinkley Point C (Nuclear Generating Station) Order 2013 (“the Order”) is amended as follows.

Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)3.

(1)

The description of Work No. 1A in Part 1 (Authorised development) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2)

In paragraph (d)(i)—

(a)

after “Effluent Tanks;” omit “and”; and

(b)

at the end of the list, below “Emergency Diesel Generator Buildings;”, insert—

“Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank;”.

(3)

In paragraph (d)(ii)—

(a)

after “Auxiliary Transformer;” insert “and”;

(b)

for “Hydrazine and Ammonia Storage; and” substitute “Hydrazine Storage;”; and

(c)

omit “Auxiliary Feedwater Storage;”.

(4)

In paragraph (d)(iii)—

(a)

after “Fire-Fighting Water Building;” insert “and”; and

(b)

at the end of the list, below “Fire-Fighting Water Building; and”, insert “Discharge Shaft (Units 1 & 2);”.

(5)

In paragraph (e)(i), at the end of the list, below “Emergency Diesel Generator Buildings;”, insert—

“Battery Load Bank;

Cooling Water Discharge Weir (Buildings); and

Refuelling Water Storage Tank”.

(6)

In paragraph (e)(ii)—

(a)

after “Unit Transformer;” insert “and”; and

(b)

omit “Hydrazine and Ammonia Storage; and” and “Auxiliary Feedwater Storage;”.

(7)

In paragraph (f)—

(a)

omit “Attenuation Pond;”;

(b)

after “Conventional Island Water Tanks;” omit “and”;

(c)

after “Nuclear Island Water Tank;” insert “and”; and

(d)

at the end of the list, below “Nuclear Island Water Tank;”, insert “Degassed Water Storage Tanks;”.

(8)

In paragraph (h)—

(a)

omit “Medical Centre;”;

(b)

after “Contamination Tools Store” omit “(2 structures)”; and

(c)

after “Vehicle search area building adjacent to the C182;” omit “and”;

(d)

in the list, between “Vehicle search area building adjacent to the C182;” and “Service Access Buildings;”, insert “Emergency Response Store;”;

(e)

after “Service Access Buildings;” insert “and”; and

(f)

at the end of the list, below “Service Access Buildings; and”, insert “Services Ventilation Building;”.

Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)4.

(1)

Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order is amended as follows.

(2)

For the approved plans referred to in paragraph (3), substitute the approved plans as set out in the Schedule to this Order.

(3)

The approved plans referred to in paragraph (2) are each of those listed between the following headings in Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order—

(a)

“HPC Permanent Development Site”; and

(b)

“HPC Accommodation Site”.

(4)

The Schedule to this Order has effect.

Amendment to Schedule 2 (Requirements)5.

Schedule 2 (Requirements) to the Order is amended as follows—

(a)

in paragraph (2) of requirement PW3 (Buildings and structures) for “(Rev 01)” substitute “(Rev 02)”;

(b)

omit requirement MS18 (Auxillary Feedwater Storage Buildings);

(c)

in paragraph (2) of requirement MS19 (Service Access Buildings) for “(Rev 01)” substitute “(Rev 02)”; and

(d)

in paragraph (2) of requirement MS21 (Meteorological Station Mast) for “(Rev 01)” substitute “(Rev 02)”.

Certification of revised or substituted plans6.

(1)

The undertaker must, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the revised or substituted plans.

(2)

A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

(3)

In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the Order.

Signed on behalf of the Secretary of State for Energy and Climate Change

Giles Scott
Head of National Infrastructure Consents and Coal Liabilities
Department for Energy and Climate Change

SCHEDULEApproved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

Article 4

“HPC Permanent Development Site

Site Plans

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-SL-00-GA-002

02

HPC Site Parameter Plan

1:1000

A0

HINK-A1-SL-00-GA-010

02

Site Layout Plan (Operational)

1:2500

A1

Nuclear Island (Unit 1)

Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HR-01-GP-090

02

Roof Plan

1:200

A0

HINK-A2-HR-01-GE-001

02

South and West Elevations

1:200

A0

HINK-A2-HR-01-GE-002

02

North and East Elevations

1:200

A0

HINK-A2-HR-01-DT-001

01

Part Elevation Detail

1:50

A0

Radioactive Waste Storage / Radioactive Waste Process Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HQ-00-GA-001

01

Roof Plan and Elevations

1:200

A0

HINK-A2-HQ-00-DT-001

01

Part Elevation Detail

1:50

A0

Hot Laundry / Hot workshop / Hot warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HV-00-GP-020

02

Roof Plan

1:200

A1

HINK-A2-HV-00-GE-001

02

Elevations

1:200

A1

HINK-A2-HV-00-DT-001

02

Part Elevation Detail

1:50

A1

Emergency Diesel Generator – A / Cooling Water Discharge Weir (Building)

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HD-01-GP-040

02

Roof Plan

1:200

A1

HINK-A2-HD-01-GE-001

02

Elevations

1:200

A1

HINK-A2-HD-01-DT-001

02

Part Elevation Detail

1:50

A1

Emergency Diesel Generator – B / Cooling Water Discharge Weir (Building) / Battery Load Bank

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HD-02-GP-040

02

Roof Plan

1:200

A1

HINK-A2-HD-02-GE-001

02

Elevations

1:200

A1

HINK-A2-HD-02-DT-001

02

Part Elevation Detail

1:50

A1

Service Access Building 1

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HGC-00-GA-001

01

Roof Plan & Elevations

1:100

A1

Nuclear Island (Unit 2)

Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HR-02-GP-090

02

Roof Plan

1:200

A0

HINK-A2-HR-02-GE-001

01

South and West Elevations

1:200

A0

HINK-A2-HR-02-GE-002

02

North and East Elevations

1:200

A0

HINK-A2-HR-02-DT-001

01

Part Elevation Detail

1:50

A0

Radioactive Waste Treatment Building / Battery Load Bank

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HQC-00-GP-040

02

Roof Plan

1:100

A1

HINK-A2-HQC-00-GE-001

02

Elevations

1:100

A1

HINK-A2-HQC-00-DT-001

02

Part Elevation Detail

1:50

A1

Emergency Diesel Generator – C / Cooling Water Discharge Weir (Building)

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HD-03-GP-040

02

Roof Plan

1:200

A1

HINK-A2-HD-03-GE-001

02

Elevations

1:200

A1

HINK-A2-HD-03-DT-001

02

Part Elevation Detail

1:50

A1

Emergency Diesel Generator – D / Cooling Water Discharge Weir (Building)

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HD-04-GP-040

02

Roof Plan

1:200

A1

HINK-A2-HD-04-GE-001

02

Elevations

1:200

A1

HINK-A2-HD-04-DT-001

02

Part Elevation Detail

1:50

A1

Service Access Building 4

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HGB-00-GA-001

01

Roof Plan & Elevations

1:100

A1

Conventional Island (Unit 1)

Unit 1: Turbine Hall

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-HM-01-GA-006

02

Roof Plan, North and South Elevations

1:200

A0

HINK-A1-HM-01-GE-001

02

West and East Elevations

1:200

A0

HINK-A1-HM-01-DT-001

01

Part Elevation Detail

1:50

A0

Unit 1: Sky Bridges

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-BR-01-GP-010

01

Roof Plan

1:100

A1

HINK-A1-BR-01-GE-001

01

North and South Elevations

1:100

A1

HINK-A1-BR-01-GE-002

01

East and West Elevations

1:100

A1

HINK-A1-BR-01-DT-001

01

Part Elevation Detail

1:50

A1

Unit 1: Non Classified Electrical Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HF-01-GP-030

02

Roof Plan

1:100

A1

HINK-A2-HF-01-GE-001

02

South Elevation

1:100

A1

HINK-A2-HF-01-GE-002

02

North and East Elevations

1:100

A1

HINK-A2-HF-01-DT-001

02

Part Elevation Detail

1:50

A1

Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HT-01-GP-003

01

Roof

1:200

A1

HINK-A2-HT-01-GE-001

01

Elevations

1:200

A1

HINK-A2-HT-01-DT-001

01

Part Elevation Detail

1:50

A1

Unit 1: Hydrazine Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-SIR-01-GA-001

01

Roof Plan and Elevations

1:100

A1

Conventional Island (Unit 2)

Unit 2: Turbine Hall

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-HM-02-GA-006

02

Roof Plan, North and South Elevations

1:200

A0

HINK-A1-HM-02-GE-001

02

West and East Elevations

1:200

A0

HINK-A1-HM-02-DT-001

01

Part Elevation Detail

1:50

A0

Unit 2: Sky Bridges

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-BR-02-GP-010

01

Roof Plan

1:100

A1

HINK-A1-BR-02-GE-001

01

North and South Elevations

1:100

A1

HINK-A1-BR-02-GE-002

01

East and West Elevations

1:100

A1

HINK-A1-BR-02-DT-001

01

Part Elevation Detail

1:50

A1

Unit 2: Non Classified Electrical Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HF-02-GP-030

02

Roof Plan (Lev 10.70m)

1:100

A1

HINK-A2-HF-02-GE-001

02

South Elevation

1:100

A1

HINK-A2-HF-02-GE-002

02

North and West Elevations

1:100

A1

HINK-A2-HF-02-DT-001

02

Part Elevation Detail

1:50

A1

Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HT-02-GP-003

01

Roof

1:200

A1

HINK-A2-HT-02-GE-001

01

Elevations

1:200

A1

HINK-A2-HT-02-DT-001

01

Part Elevation Detail

1:50

A1

Operations

Operational Service Centre

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-HB-00-GP-090

01

Roof Plan

1:200

A1

HINK-A1-HB-00-GE-001

01

North and South Elevations

1:200

A1

HINK-A1-HB-00-GE-002

01

East and West Elevations

1:200

A1

HINK-A1-HB-00-DT-001

01

Part Elevation Detail

1:50

A1

Cooling Water Pumphouse and Associated Buildings (Unit 1)

Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 5 & 7

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HP-01-GP-030

02

Roof Plan

1:200

A0

HINK-A2-HP-01-GE-001

02

Elevations

1:200

A0

HINK-A2-HP-01-DT-001

02

Part Elevation Detail

1:50

A0

Unit 1: Fire-Fighting Water Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HOJ-01-GA-003

02

Roof Plan and Elevations

1:200

A1

HINK-A2-HOJ-01-DT-001

02

Part Elevation Detail

1:50

A1

Discharge Shaft (Units 1 & 2)

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HCT-00-GA-001

01

Roof Plan & Elevations

1:100

A1

Cooling Water Pumphouse and Associated Buildings (Unit 2)

Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 6 & 8

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HP-02-GP-030

02

Roof Plan

1:200

A0

HINK-A2-HP-02-GE-001

02

Elevations

1:200

A0

HINK-A2-HP-02-DT-001

02

Part Elevation Detail

1:50

A0

Unit 2: Fire-Fighting Water Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HOJ-02-GA-003

02

Roof Plan and Elevations

1:200

A1

HINK-A2-HOJ-02-DT-001

02

Part Elevation Detail

1:50

A1

Remaining Balance of Plant and Other Plant (Unit 1)

Unit 1: Hydrogen Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HZH-01-GA-002

02

Roof Plan and Elevations

1:100

A1

Unit 1: Oxygen Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HZO-01-GA-002

01

Roof Plan and Elevations

1:100

A1

Remaining Balance of Plant and Other Plant (Unit 2)

Unit 2: Hydrogen Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HZH-02-GA-002

02

Roof Plan & Elevations

1:100

A1

Unit 2: Oxygen Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HZO-02-GA-002

01

Roof Plan and Elevations

1:100

A1

Remaining Balance of Plant and Other Plant (Shared Between both Units)

Demineralisation Station

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HY-00-GP-030

02

Roof Plan

1:100

A1

HINK-A2-HY-00-GE-001

02

North and South Elevations

1:100

A1

HINK-A2-HY-00-GE-002

02

East and West Elevations

1:100

A1

HINK-A2-HY-00-DT-001

02

Part Elevation Detail

1:50

A1

Auxiliary Boilers

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HVB-00-GA-004

01

Roof Plan

1:100

A1

HINK-A2-HVB-00-GE-001

01

Elevations

1:100

A1

HINK-A2-HVB-00-DT-001

01

Part Elevation Detail

1:50

A1

Chemical Products Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HZC-00-GA-001

01

Roof Plan and Elevations

1:100

A1

HINK-A2-HZC-00-DT-001

01

Part Elevation Detail

1:50

A1

Sewage Treatment Plant

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-STP-00-GA-001

01

Plans and Elevations

1:100

A1

Conventional Island Water Storage Tank – A

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-SER-01-GA-002

01

Roof Plan and East Elevation

1:200

A1

Conventional Island Water Storage Tank – B

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-SER-02-GA-002

01

Roof Plan and East Elevation

1:200

A1

Nuclear Island Water Storage Tank

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-SED-00-GA-002

01

Roof Plan and South and East Elevations

1:100

A1

Degassed Water Storage Tanks

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-REA-00-GA-001

01

Roof Plan & Elevations

1:200

A1

Fuel Waste and Storage

Interim Spent Fuel Store

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HHK-00-GP-000

01

Plan

1:200

A0

HINK-A2-HHK-00-GE-001

01

North and South Elevations

1:200

A0

HINK-A2-HHK-00-GE-002

01

East and West Elevations

1:200

A0

Access Control Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HUD-00-GA-001

01

Plans and Elevations

1:100

A1

Intermediate Level Waste Interim Storage Facility

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HHI-00-GA-002

01

Roof Plan and Elevations

1:200

A0

HINK-A2-HHI-00-DT-001

01

Part Elevation Detail

1:50

A0

Ancillary, Office and Storage

Main Access Control Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HU-00-GP-010

01

Roof Plan

1:100

A1

HINK-A2-HU-00-GE-001

01

Elevations

1:100

A1

HINK-A2-HU-00-DT-001

01

Part Elevation Detail

1:50

A1

Entry Relay Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-ERB-00-GA-002

01

Roof Plan and Elevations

1:100

A1

HINK-A2-ERB-00-DT-001

01

Part Elevation Detail

1:50

A1

Off-site Vehicle Search Area

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-VSA-00-GA-001

01

Roof Plan and Elevations

1:50

A1

Auxiliary Administration Centre

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HUC-00-GP-020

02

Roof Plan

1:100

A1

HINK-A2-HUC-00-GE-001

02

North and South Elevations

1:100

A1

HINK-A2-HUC-00-GE-002

02

East and West Elevations

1:100

A1

HINK-A2-HUC-00-DT-001

02

Part Elevation Detail

1:50

A1

EDF Site Offices

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HAO-00-GE-001

02

Roof & Elevations

1:200

A1

HINK-A2-HAO-00-DT-001

02

Part Elevation Detail

1:50

A1

Garage for Handling Facilities

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HBG-00-GP-010

01

Roof Plan

1:100

A1

HINK-A2-HBG-00-GE-001

01

Elevations

1:100

A1

HINK-A2-HBG-00-DT-001

01

Part Elevation Detail

1:50

A1

Oil and Grease Storage and Oil Ancillary Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HOG-00-GA-002

01

Roof Plan

1:100

A1

HINK-A2-HOG-00-GE-001

01

North and South Elevations

1:100

A1

HINK-A2-HOG-00-GE-002

01

East and West Elevations

1:100

A1

HINK-A2-HOG-00-DT-001

01

Part Elevation Detail

1:50

A1

AREVA Warehouse

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HBW-00-GP-010

01

Roof Plan

1:200

A1

HINK-A2-HBW-00-GE-001

01

Elevations

1:200

A1

HINK-A2-HBW-00-DT-001

01

Part Elevation Detail

1:50

A1

Meteorological Station

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HSM-00-GA-002

01

Roof Plan and Elevations

1:50

A1

Outage Access Control Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-TU1-00-GA-002

01

Roof Plan and Elevations

1:100

A1

HINK-A2-TU1-00-DT-001

01

Part Elevation Detail

1:50

A1

Contaminated Tools Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HHC-01-GA-002

02

Roof Plan and Elevations

1:200

A1

HINK-A2-HHC-01-DT-001

02

Part Elevation Detail

1:50

A1

Conventional Waste Storage

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-CWS-00-GA-002

01

Roof Plan and Elevations

1:200

A1

Transit Area for Very Low Level Waste and Low Level Waste

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HHL-00-GE-001

01

Elevations

1:100

A1

Raw Water and Potable Water Supply

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HOR-00-GA-001

02

Roof Plan

1:100

A0

HINK-A2-HOR-00-GA-002

02

Elevations

1:100

A0

HINK-A2-HOR-00-DT-001

02

Part Elevation Detail

1:50

A1

Emergency Response Store

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HHE-00-GA-001

01

Roof Plan & Elevations

1:200

A1

HINK-A2-HHE-00-DT-001

01

Part Elevation Detail

1:50

A1

Services Ventilation Building

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HGM-00-GA-001

01

Roof Plan & Elevations

1:100

A1

Public and Training

Simulator Building / Training Centre

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-HBS-00-GP-020

01

Roof Plan

1:200

A1

HINK-A1-HBS-00-GE-001

01

Elevations

1:200

A1

HINK-A1-HBS-00-DT-001

01

Part Elevation Detail

1:50

A1

Public Information Centre

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-PIC-00-GP-040

01

Roof Plan

1:100

A1

HINK-A1-PIC-00-GE-001

01

North and West Elevations

1:100

A1

HINK-A1-PIC-00-GE-002

01

South and East Elevations

1:100

A1

HINK-A1-PIC-00-DT-001

01

Part Elevation Detail

1:50

A1

National Grid Substation

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-SS-00-GP-010

01

Roof Plan

1:200

A0

HINK-A2-SS-00-GE-001

01

Elevations

1:200

A0

HINK-A2-SS-00-DT-001

01

Part Elevation Detail

1:50

A0

Other Site Structures

Sea Wall (Incorporating Coastal Footpath)

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A2-HSW-00-GA-001

01

Plans

1:500

A0

HINK-A2-HSW-00-GA-002

01

North Elevation

1:50

A0

HINK-A2-HSW-00-GA-003

01

Detail Plans and Elevations

1:50

A0

HINK-A2-HSW-00-GA-004

01

Detail Plan and Elevation

1:100

A0

EDF Energy Pylons

Drawing number

Rev

Drawing title

Scale

Paper size

HINK-A1-PL-00-GA-001

01

Location Plan, Plans, Elevations and Axonometric

Various

A1

Highways Plans

Drawing number

Rev

Drawing title

Scale

Paper size

HPC-GEN124-RI-RFC-DRW-000045

01

Northern Roundabout Proposed Layout

1:500

A1

HPC-GEN124-RI-RFC-DRW-000046

01

Vehicle Search Area Layby and Turning Head Proposed Layout

1:250

A1

HPC-GEN124-RI-RFC-DRW-000047

01

Southern Roundabout Proposed Layout During Operation

1:500

A1

HPC-GEN124-RI-RFC-DRW-000048

01

Southern Roundabout Proposed Layout During Construction

1:500

A1

HPC-GEN124-RI-RFC-DRW-000049

01

Emergency Access Road Junction with Existing Highway Proposed Layout

1:250

A1

Site Preparation Plans

Drawing number

Rev

Drawing title

Scale

Paper size

HPCSPW002a Rev1

01

Site Layout Plan

1:3500

A1

HPCSPW002b

00

Beach Access Road Plan and Cross Sections

1:250 / 1:50

A1

HPCSPW004 Rev1

01

Planning Application Fencing Arrangement (Sheet 1 of 3)

1:3500

A1

HPCSPW005 Rev1

01

Fencing Enlarged Detail West (Sheet 2 of 3)

1:1500

A1

HPCSPW006 Rev1

01

Fencing Enlarged Detail East (Sheet 3 of 3)

1:1500

A1

HPCSPW007 Rev1

01

Indicative Earthworks Cut and Fill Arrangement

1:3500

A1

HPCSPW008

00

Early Works Water Management Zone

1:2500

A1

HPCSP009 Rev1

01

Surface Water Catchment Area Overall General Arrangement

1:3000

A1

HPCSPW010

00

Arrangement of Construction Drainage Outfall to Foreshore

1:75

A1

HPCSPW011 Rev1

01

Surface Water Drainage Holford Stream Culvert

1:1500 / 1:150

A1

HPCSPW012a

00

Deep Water Drainage Arrangement

1:2000 / 1:100

A1

HPCSPW012b

00

Deep Water Arrangement Spine Drain Sections A and B

1:200

A1

HPCSPW012c

00

Deep Water Assessment Spine Drain Sections C

1:200

A1

HPCSPW013b

00

Typical Cross Section Through Haul Road

1:50

A1

HPCSPW014

00

11kv Sub Station Plan and Elevations

1:100

A1

HPCSPW015

00

Raw Water Reservoir Plans and Sections

1:150

A1

HPCSPW016 Rev1

01

Surface Water Drainage in the Built Development Areas

1:1750

A1

HPCSPW017

00

Site Access Control Arrangement, Floor and Elevation

1:50

A1

HPCSPW019 Rev1

01

Landscape Proposal Plan

1:5000

A1

HPCSPW022

00

Proposed Sewage Treatment Plant – Plans and Sections

1:100

A1

HPCSPW023a

00

Existing and Reinstated Ground Level Cross Sections

1:2500 / 1:500

A1

HPCSPW023b

00

Earthworks Platforms Cross Sections

1:2500 / 1:500

A1

HPCSPW025a Rev2

02

Tree and Hedgerow Retention and Removal

1:4000

A1

HPCSPW025b Rev1

01

Proposed Advanced Planting, Plan

1:1000

A1

HPCSPW026

00

Primary and Secondary Access Tracks

1:3500

A1

HPCSPW027

00

NW Boundary Mitigation During Construction Cross Sections A and B

1:200

A1

HPCSPW028

00

NW Boundary Mitigation During Construction Cross Sections C and D

1:200

A1

HPCSPW029

00

NW Boundary Mitigation During Construction Planting Plan

1:750

A1”

EXPLANATORY NOTE
(This note is not part of the Order)

This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 (“the 2013 Order”), a development consent order under the Planning Act 2008, following an application under paragraph 2 of Schedule 6 to that Act for a non-material change to alter service buildings in respect of limited new structures, to provide for the removal, repositioning and alteration to the dimensions of some buildings, to make other minor changes to that consented under the 2013 Order to facilitate safety and better design, and to amend the listed plans in Part 3 of Schedule 1 to the 2013 Order. This Order, in article 6, provides for the certification of revised or substituted plans for use as evidence in any proceedings. The changes to the 2013 Order take effect from the date specified in this Order.