Development consent, etc. granted by Order
3.—(1) Subject to the provisions of this Order and to the Requirements in Part 3 of Schedule 1, the undertaker is granted development consent for the authorised development.
(2) The authorised development must be constructed—
(a)within the Order limits;
(b)in the lines or situations shown on the works plans;
(c)in respect of the limits of deviation applicable to specific works as shown on the works plans, within those limits of deviation.
(3) In constructing or maintaining the authorised development, the undertaker may—
(a)deviate laterally from the lines or situations shown on the works plans within the limits of deviation, subject to the maximum dimensions set out in Part 2 (dimensions of structures) of Schedule 1;
(b)deviate vertically from the levels shown on works plans 2.2.11A to 2.2.16A (the marine works seawall sections) to any extent downwards as may be found necessary or convenient.
(4) In the case of conflict between the works plans or the plans or drawings set out in Schedule 7 (documents to be certified) and the works as set out in Parts 1A and 1B of Schedule 1 or the maximum dimensions set out in Part 2 of that Schedule, the description of the works in Schedule 1 are to prevail, and the maximum dimensions must not exceed those set out in Part 2 of that Schedule.