Article 2
SCHEDULE 1AUTHORISED PROJECT
A nationally significant infrastructure project as defined in Sections 14(1)(p) and 30 of the 2008 Act comprising:
(1) The construction of a new hazardous waste landfill facility for the disposal at a direct input rate of up to 150,000 tonnes per annum of hazardous waste in the area and phases identified on the works plan including the operation of a landfill gas collection and flare system, the operation of a leachate collection, treatment and lagoon system, the extraction, stockpiling and exportation of clay, mudstones, coal and other suitable materials including general fill materials and all other associated engineering works to construct the landfill phases.
(2) And in connection with such works and to the extent that they do not otherwise form part of any such work, further associated development and/or ancillary works shown on the plans referred to in the requirements at Schedule 2 including the:
(a)continuation of the filling with hazardous waste as shown on the works plan;
(b)operation of the interceptor waste treatment facility for the treatment of waste;
(c)site compound;
(d)wheel cleaning facilities;
(e)weighbridge and weighbridge office;
(f)offices and laboratory;
(g)mess facilities;
(h)garage facility;
(i)electrical switchroom;
(j)leachate storage tanks;
(k)fuel storage tank;
(l)monitoring boreholes;
(m)security cameras;
(n)boundary fencing;
(o)security/operational lighting;
(p)car parking area;
(q)internal site roads;
(r)bunding;
(s)surface and foul water management system;
(t)the restoration of the land; and
(u)aftercare.