North East Lincolnshire and North Lincolnshire,A160 between point 1/9 and 2/33 on the Streets, Rights of Way and Access Plans Sheets 1 and 2.,
North East Lincolnshire and North Lincolnshire,A180 – A160 Eastbound off-slip between point 1/1 and 1/2 on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire and North Lincolnshire,A160 – A180 Westbound on-slip between point 1/4 and 1/3 on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,A160 – A180 Eastbound on-slip between point 1/5 and 1/6 on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,A180 – A160 Westbound off-slip between point 1/8 and 1/7 on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,A160 circulatory carriageway at Brocklesby Interchange indicated by point 1/10 on the Streets, Rights of Way and Access Plans Sheet 1.,

North Lincolnshire,From point 2/21 to point 2/22 on the Streets, Rights of Way and Access Plans Sheet 2.,Not applicable,A1077,
North Lincolnshire,From point 2/23 to point 2/24 on the Streets, Rights of Way and Access Plans Sheet 2.,Not applicable,C131,
North Lincolnshire,From point 2/25 to point 2/26 on the Streets, Rights of Way and Access Plans Sheet 2.,Not applicable,Unclassified,
North Lincolnshire,From point 2/27 to point 2/28 on the Streets, Rights of Way and Access Plans Sheet 2.,C131,Unclassified,
North Lincolnshire,From point 2/29 to point 2/30 on the Streets, Rights of Way and Access Plans Sheet 2.,Not applicable,C131,
North Lincolnshire,From point 2/32 to point 2/31 on the Streets, Rights of Way and Access Plans Sheet 2.,Not applicable,Unclassified,
North Lincolnshire,From point 3/3 to point 3/4 on the Streets, Rights of Way and Access Plans Sheet 3.,Not applicable,Unclassified,
North Lincolnshire,From point 4/2 to point 4/3 on the Streets, Rights of Way and Access Plans Sheet 4.,Not applicable,A160,
North Lincolnshire,From point 4/4 to point 4/5 on the Streets, Rights of Way and Access Plans Sheet 4.,C133,A160,
North Lincolnshire,From point 4/9 to point 4/10 on the Streets, Rights of Way and Access Plans Sheet 4.,Not applicable,Unclassified,

North Lincolnshire,From point 2/C to point 2/D on the Streets, Rights of Way and Access Plans Sheet 2.,A160,A1077,

North Lincolnshire,Greengate Lane from point 2/4 to point 2/5 on the Traffic Regulation Plans Sheet 2.,
North Lincolnshire,Town Street Link from point 3/2 to point 3/3 on the Traffic Regulation Plans Sheet 3.,

North Lincolnshire,C131 from point 2/1 to point 2/2 on the Traffic Regulation Plans Sheet 2.,
North Lincolnshire,Greengate Lane from point 2/3 to point 2/4 on the Traffic Regulation Plans Sheet 2.,
North Lincolnshire,Habrough Link Road from point 2/9 to point 2/10 on the Traffic Regulation Plans Sheet 2.,
North Lincolnshire,C131 from point 2/11 to point 2/12 on the Traffic Regulation Plans Sheet 2.,
North Lincolnshire,A160 from point 4/2 to points 4/9 and 4/10 on the Traffic Regulation Plans Sheet 4.,
North Lincolnshire,A160 from point 4/6 to point 4/8 on the Traffic Regulation Plans Sheet 4.,

North Lincolnshire,A160 from point 2/6 to point 2/7 on the Traffic Regulation Plans Sheet 2.,

North Lincolnshire,C131 from point 2/1 to point 2/2 on the Traffic Regulation Plans Sheet 2.,7.5 tonne limit,
North Lincolnshire,Greengate Lane from point 2/3 to point 2/5 on the Traffic Regulation Plans Sheet 2.,7.5 tonne limit,
North Lincolnshire,Town Street Link from point 3/2 to point 3/3 on the Traffic Regulation Plans Sheet 3.,7.5 tonne limit,

North Lincolnshire,A160 from point 3/1 to point 3/4 on the Traffic Regulation Plans Sheet 3.,No right turn.,
North Lincolnshire,A160 from point 3/5 on the Traffic Regulation Plans Sheet 3 to point 4/1 on the Traffic Regulation Plans Sheet 4.,No right turn from the Humber Oil Refinery (north of the A160) to the A160 westbound direction.  No right turn from the Humber Oil Refinery (south of the A160) to the A160 eastbound direction.  No right turn from A160 eastbound direction to the Humber Oil Refinery (south of the A160).  No movement between the Humber Oil Refinery (north of the A160) and the Humber Oil Refinery (south of the A160) across the central reservation of the A160 in either direction.  No U turn from the A160 eastbound direction.  No U turn from the A160 westbound direction. ,

North Lincolnshire,A160 from point 4/2 to point 4/4 on the Traffic Regulation Plans Sheet 4.,
North Lincolnshire,A160 from point 4/5 to point 4/8 on the Traffic Regulation Plans Sheet 4.,

North Lincolnshire,From point 4/7 to point 4/3 on the Traffic Regulation Plans Sheet 4.,

North Lincolnshire,From point 2/34 to point 2/35 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/36 to point 2/37 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/38 to point 2/39 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/40 to point 2/41 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/42 to point 2/43 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/44 to point 2/45 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 2/46 to point 2/47 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,From point 3/12 on the Streets, Rights of Way and Access Plans Sheet 3 to point 4/12 on the Streets, Rights of Way and Access Plans Sheet 4.,

North East Lincolnshire,Private Means of Access point 1/11 on the Streets, Rights of Way and Access Plans Sheet 1.,
North Lincolnshire,Private Means of Access point 1/15 on the Streets, Rights of Way and Access Plans Sheet 1.,
North Lincolnshire,Private Means of Access point 2/4 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/6 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/7 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/8 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/9 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/12 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/13 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/14 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/15 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/16 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/18 on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 3/1 on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 3/10 on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 3/11 on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 4/8 to point 4/9 on the Streets, Rights of Way and Access Plans Sheet 4.,
North Lincolnshire,Private Means of Access point 4/10 on the Streets, Rights of Way and Access Plans Sheet 4.,
North Lincolnshire,Private Means of Access point 4/11 on the Streets, Rights of Way and Access Plans Sheet 4.,

North Lincolnshire,Footpath from point 3/7 to point 3/8 on the Streets, Rights of Way and Access Plans Sheet 3.,

North East Lincolnshire,Permissive right of way from point 1/13 to point 1/14 on the Streets, Rights of Way and Access Plans Sheet 1.,

North Lincolnshire,Private Means of Access point 1/A, on the Streets, Rights of Way and Access Plans Sheet 1.,The whole access.,Private Means of Access point 1/12, on the Streets, Rights of Way and Access Plans Sheet 1.,
North Lincolnshire,Private Means of Access point 1/B, on the Streets, Rights of Way and Access Plans Sheet 1.,The whole access.,Private Means of Access point 2/2 to point 2/1, on the Streets, Rights of Way and Access Plans Sheet 2.,
North East Lincolnshire,A180 westbound on-slip.,From point 1/D to point 1/C, on the Streets, Rights of Way and Access Plans Sheet 1.,From point 1/4 to point 1/3, on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,A180 westbound off-slip.,From point 1/F to point 1/E, on the Streets, Rights of Way and Access Plans Sheet 1.,From point 1/8 to point 1/7, on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,A180 eastbound on-slip.,From point 1/G to point 1/H, on the Streets, Rights of Way and Access Plans Sheet 1.,From point 1/5 to point 1/6, on the Streets, Rights of Way and Access Plans Sheet 1.,
North East Lincolnshire,Permissive right of way, North of A180.,From point 1/I to point 1/J, on the Streets, Rights of Way and Access Plans Sheet 1.,From point 1/13 to point 1/14, on the Streets, Rights of Way and Access Plans Sheet 1.,
North Lincolnshire,A160,From point 2/E to point 2/F, on the Streets, Rights of Way and Access Plans Sheet 2.,From point 2/21 to point 2/22, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,C131,From point 2/I to point 2/H, on the Streets, Rights of Way and Access Plans Sheet 2.,From point 2/32 to point 2/29, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/L, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/2 to point 2/3, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/M, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/2 to point 2/4, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/N, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/10 to point 2/11, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/O, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/10 to point 2/11, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/P, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/2 to point 2/4, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/Q, on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access from point 2/2 to point 2/5, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Private Means of Access point 2/R on the Streets, Rights of Way and Access Plans Sheet 2.,The whole access.,Private Means of Access point 2/17, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Public Right of Way FP91.,From point 3/C to point 3/D, on the Streets, Rights of Way and Access Plans Sheet 3.,Private Right of Way from point 3/7 to point 3/8, on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 3/E, on the Streets, Rights of Way and Access Plans Sheet 3.,The whole access.,Private Means of Access point 3/2, on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 3/F, on the Streets, Rights of Way and Access Plans Sheet 3.,The whole access.,Private Means of Access point 3/9, on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Private Means of Access point 4/A, on the Streets, Rights of Way and Access Plans Sheet 4.,The whole access.,Private Means of Access point 4/1, on the Streets, Rights of Way and Access Plans Sheet 4.,

North Lincolnshire,A1077, on the Streets, Rights of Way and Access Plans Sheet 2.,From point 2/A to point 2/B, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,A160, on the Streets, Rights of Way and Access Plans Sheet 2.,From point 2/F to point 2/G, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,C131, on the Streets, Rights of Way and Access Plans Sheet 2.,From point 2/J to point 2/K, on the Streets, Rights of Way and Access Plans Sheet 2.,
North Lincolnshire,Public Right of Way FP85, on the Streets, Rights of Way and Access Plans Sheet 3.,From point 3/B to point 3/G, on the Streets, Rights of Way and Access Plans Sheet 3.,
North Lincolnshire,Public Right of Way FP87, on the Streets, Rights of Way and Access Plans Sheet 3.,From point 3/A to point 3/G, on the Streets, Rights of Way and Access Plans Sheet 3.,


1/1a, 1/1u, 1/1x,To construct, operate, access and maintain existing telecommunications mast.,
1/1d, 1/1f, 1/1k, 1/1p, 1/1am, 1/3c, 1/3f, 1/4b,To construct, access and maintain boundary fencing.,
1/1t, 1/1y, 1/1ah, 1/1ak,To construct, operate, access and maintain the diverted electric cables.,
1/1w,To construct, operate, access and maintain the diverted electric cables.  To construct, operate, access and maintain existing telecommunications mast.  To construct, access and maintain boundary fencing. ,
1/1af,To access and maintain the field ditch south and east of the A160.  To construct, access and maintain boundary fencing. ,
1/1ag,To construct, operate, access and maintain the diverted electric cables.  To construct, access and maintain boundary fencing. ,

2/2b, 2/2f,To construct, operate, access and maintain the diverted water pipeline.  To construct, operate, access and maintain the diverted electric cable. ,
2/2c,To construct, operate, access and maintain the diverted water pipeline.  To construct, operate, access and maintain the diverted electric cable.  To construct, access and maintain boundary fencing. ,
2/2e,To construct, operate, access and maintain the diverted water pipeline.  To construct, operate, access and maintain the diverted electric cable.  To access and maintain the field ditch east of the A160.  To construct, access and maintain boundary fencing. ,
2/5a, 2/6a,To construct, operate, access and maintain the two diverted water pipelines.,
2/5c,To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.  To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.  To access and maintain the field ditch south of the A160.  To construct, access and maintain boundary fencing. ,
2/5d,To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.  To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline. ,
2/5i, 2/5m, 2/7b,To access and maintain the field ditch south of the A160.,
2/6c,To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.  To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines. ,
2/7d,To construct, operate, access and maintain the diverted electric cable.,
2/7f,To access and maintain the field ditch south of the A160.  To construct, access and maintain boundary fencing.  To construct, operate, access and maintain the diverted high pressure gas pipeline. ,
2/7g,To construct, operate, access and maintain the diverted high pressure gas pipeline.,
2/7h,To construct, access and maintain boundary fencing.,
2/8a,To construct, operate, access and maintain the diverted high pressure gas pipeline.,

3/5b, 3/5d,To construct, access and maintain the adjacent highway and drainage culvert.  To lay out new Public Right of Way diversion of the existing Footpath 91. ,

4/1d,To construct, operate, access and maintain the diverted oxygen pipeline.  To access existing telecommunications mast. ,
4/1g, 4/1j,To construct, operate, access and maintain the diverted oxygen pipeline.,
4/5b,To construct, operate, access and maintain the new section of road under the new rail bridge.,


In the administrative area of North East Lincolnshire Council,1/1n, 1/1p, 1/1q, 1/5b,Required to provide construction working area and access for site traffic.,All works,
1/1s, 1/4b, 1/4c,Required for borrow pits to source material to construct raised sections of the new road construction.,All works,
1/1ae, 1/1al, 1/1am,Required to provide an area for topsoil and other construction material storage.,All works,
In the administrative area of North Lincolnshire Council,1/1a,Required to enable the use of the existing access track between the A160, Ryehill Farm and A1077 Ulceby Road.,Work No. 1,
1/1b, 1/1c, 1/1d, 1/1e, 1/1f, 1/1h, 1/1i, 1/1j, 1/1k, 1/1m, 1/1u, 1/1v, 1/1w, 1/1x, 1/1z, 1/1af, 1/1ag, 1/1ai, 1/1aj, 1/2a, 1/3a, 1/3c, 1/3d, 1/3e, 1/3f,Required to provide construction working area and access for site traffic.,All works,
1/1t, 1/1ak,Required for the diversion of an electric cable and associated apparatus.,Work No. 9,
1/1y, 1/1ah,Required for the diversion of electric cables and associated apparatus and to provide construction working area and access for site traffic.,All works,

In the administrative area of North Lincolnshire Council,2/1a, 2/2a, 2/5f, 2/5h, 2/5k, 2/8b, 2/10b,Required for the construction of accesses.,All works,
2/2b, 2/2c,Required for the diversion of a water pipeline and electric cable and associated apparatus, and required to provide construction working area and access for site traffic.,All works,
2/2e,Required to provide construction working area and access for site traffic and also the diversion of water pipeline and overhead electric cable.,All works,
2/2f,Required for the diversion of a water pipeline and electric cable and associated apparatus.,Work Nos. 10 &amp; 11,
2/5a, 2/6a,Required for the diversion of up to 2 water pipelines.,Work No. 12,
2/5c,Required to provide construction working area and access for site traffic and also the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline.,All works,
2/5d,Required for the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline.,Work No. 15, 16 &amp; 17,
2/5e, 2/5i, 2/5l, 2/5m, 2/7b, 2/7h, 2/7j, 2/9a,Required to provide construction working area and access for site traffic.,All works,
2/5j, 2/10c,Required to provide topsoil and other construction material storage areas.,All works,
2/6c,Required for the diversion of up to 3 high pressure gas pipelines and the protection of an intermediate pressure gas pipeline.,Work Nos. 14, 15 &amp; 16,
2/7c,Required to provide topsoil and other construction material storage areas, and required to provide construction working area and access for site traffic.,All works,
2/7d,Required for the diversion of an electric cable and associated apparatus.,Work No. 11,
2/7e,Required for the provision of the main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials and the treatment of site generated waste and also to provide construction working area and access for site traffic.,All works,
2/7f,Required to provide construction working area and access for site traffic and also the diversion of a high pressure gas pipeline.,Work No. 14,
2/7g,Required for the diversion of a high pressure gas pipeline.,Work No. 14,
2/8a,Required for the diversion of a high pressure gas pipeline.,Work No. 17,

In the administrative area of North Lincolnshire Council,3/1, 3/2a,Required for the construction of a new access and the stopping up of an existing access.,All works,
3/5b, 3/5d,Required for the construction of the diversion to the existing Public Right of Way and the construction of up to 3 new drainage culverts and head walls.,All works,
3/9c,Required for the construction of a new access.,All works,
3/9d,Required to provide an area for topsoil and other construction material storage.,All works,

In the administrative area of North Lincolnshire Council,4/1d, 4/1g, 4/1j,Required for the diversion of an oxygen pipeline.,Work No. 30,
4/1h, 4/3d, 4/6d,Required for the construction of accesses.,All works,
4/1i, 4/1k,Required to provide an area for topsoil and other construction material storage.,All works,
4/4a, 4/8,Required to provide construction working area and access for site traffic.,All works,
4/5a, 4/5b, 4/5c,Required for the construction of a new bridge under the existing railway and for construction working area.,Work No. 29,
4/7,Required for the provision of a secondary site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials and the treatment of site generated waste.,All works,