2014 No. 3212
The Offshore Installations (Safety Zones) (No. 3) Order 2014
Made
Coming into force
Citation and commencement1
This Order may be cited as the Offshore Installations (Safety Zones) (No. 3) Order 2014 and comes into force on 25th December 2014.
Establishment of safety zone2
A safety zone is established around the installation specified in column 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 19843 specified in columns 2 and 3 of the Schedule.
Signed by authority of the Secretary of State for Work and Pensions
SCHEDULEINSTALLATION
(1) Name or other designation of the offshore installation | (2) Latitude | (3) Longitude |
|---|---|---|
Southern Drill Centre (SDC), Block 20/1N, Golden Eagle Area Development Field | 57°55.27′ North | 00°54.28′ West |
(This note is not part of the Order)