The Electricity and Gas Appeals (Designation and Exclusion) Order 2014

Network Code

This section has no associated Explanatory Memorandum

7.—(1) For a decision relating to the Network Code, the specified condition is that the decision accords with a majority recommendation made by the Modification Panel in the Modification Report.

(2) In this article, the words “Modification Panel” and “Modification Report” have the same meanings as in the Uniform Network Code designated by article 3(d).