Search Legislation

The Traffic Management (London Borough of Havering) Permit Scheme Order 2012

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

EXPLANATORY NOTE

(This note is not part of the Order)

This Order gives effect to the London Borough of Havering Permit Scheme.

The London Borough of Havering Permit Scheme is designed to control the carrying out of works in specified streets in Havering by imposing an obligation to obtain a permit from the London Borough of Havering before undertaking the works.

Article 3 gives effect to the permit scheme, which will come into effect on 1st April 2013. The permit scheme referred to in this article is set out in the Schedule to the Order.

Article 4 applies Part 8 of the Traffic Management Permit Scheme (England) Regulations 2007 (which makes provision for the disapplication and modification of enactments in relation to specified works in specified streets) to the specified works and specified streets within the London Borough of Havering Permit Scheme.

A copy of the London Borough of Havering Permit Scheme is deposited and can be inspected at the offices of the London Borough of Havering, Romford PASC, Liberty Shopping Centre, Romford RM1 3RL and is available to inspect on the Borough’s website www.Havering.gov.uk/streetworkpermits.

Back to top

Options/Help