Power to dredge in Humber8.
(1)
For the purposes of affording uninterrupted means of access to the works and of enabling their use at all states of the tide, A.B. Ports may from time to time deepen, dredge, scour, cleanse, alter and improve the bed, shores and channels of the river Humber—
(a)
within an area under and adjoining Works Numbers 1 and 2 equal in size to the area stippled blue on sheet 2 of the deposited plans, to a maximum depth of 7.5 metres below Chart Datum (dredged berth pocket);
(b)
within the area stippled red on sheet 3 of the deposited plans, to a maximum depth of 2 metres below Chart Datum (dredged approach channel and turning area);
and may (subject to paragraphs (2) and (3)) as it thinks fit use, appropriate or dispose of the materials from time to time taken up or collected by it in the course of any such operations.