[F1SCHEDULE 4U.K.UK verification assessment procedure for subsystems

(This Schedule substantially reproduces Annex VI to the Directive with amendments to correct deficiencies arising from the UK’s withdrawal from the European Union.)U.K.

3.2.  Certificate of verificationU.K.

The designated body must draw up the UK certificate of verification intended for the project entity.

The certificate shall contain a precise reference to the UK specific rule(s) whose conformity has been examined by the designated body in the UK verification process.

In the case of UK specific rules related to the subsystems composing a vehicle, the designated body shall divide the certificate into two parts, one part including the references to those UK specific rules strictly related to the technical compatibility between the vehicle and the network concerned, and the other part for all other UK specific rules.]