In the District of North Hertfordshire,
Work No. 1,A railway (2265 metres in length) commencing by a junction with the northbound track of the Hitchin to Peterborough section of the East Coast Main Line at a point 150 metres south of the bridge carrying the River Hiz beneath that section of the East Coast Main Line, running northwards along the western side of the said section of the East Coast Main Line on embankment then viaduct, turning eastwards to cross over the said section of the East Coast Main Line at a point 355 metres south of the bridge carrying Icknield Way over that section, continuing on viaduct then embankment in an easterly direction before terminating by a junction with the Hitchin to Cambridge Railway at a point 10 metres west of the bridge carrying said Hitchin to Cambridge Railway over Stotfold Road. Work No. 1 includes construction of the viaduct and the railway embankments (incorporating an underbridge at a point 390 metres west of Stotfold Road). ,
Work No. 2,A low pressure gas main (270 metres in length), being a diversion of an existing low pressure gas main, to the west of Work No. 1 commencing at point A1 and terminating at point A2 on the works and land plans. ,
Work No. 3,A sewer (290 metres in length), being a diversion of an existing sewer, to the west of Work No. 1 commencing at point B1 and terminating at point B2 on the works and land plans. ,
Work No. 4,A drainage outfall (155 metres in length) commencing at a point 290 metres north of the commencement of Work No. 1 and terminating on the northern bank of the River Hiz at a point 160 metres west of the East Coast Main Line. Work No. 4 includes the construction of a headwall on the northern bank of the River Hiz and a detention basin 80 metres in length and 30 metres in width at its widest point. ,
Work No. 5,A widening of the existing private access road running through the National Grid Operational Centre on its western side commencing at the junction of that road with Cadwell Lane and terminating at a point 400 metres north of its commencement. ,
Work No. 6,An access road commencing at a point 45 metres north west of the termination of Work No. 5 and terminating at a point 120 metres north of its commencement. ,
Work No. 7,An (11kv) electricity cable (65 metres in length), being a diversion of an existing (11kv) electricity cable, commencing at point C1 and terminating at point C2 on the works and land plans. ,
Work No. 8,A (11kv) electricity cable (50 metres in length), being a relocation of an existing overhead (11kv) electricity cable to a subterranean level along its existing horizontal alignment commencing at point D1 and terminating at point D2 on the works and land plans. ,
Work No. 9,A farm access commencing at a point 20 metres north of the northern end of Wilbury Way and terminating at a point 15 metres north west of its commencement. ,
Work No. 10,A (33kv) electricity cable (260 metres in length), being a diversion of an existing overhead (33kv) electricity cable to a subterranean level within the underbridge forming part of Work No. 1 commencing at point E1 and terminating at point E2 on the works and land plans. ,
Work No. 11,An access road (185 metres in length) commencing by a junction with Stotfold Road at a point 160 metres north of the bridge carrying the Hitchin to Cambridge Railway over the said Stotfold Road running firstly in a westerly direction and then generally in a southerly direction and terminating at a point 160 metres south of its commencement. Work No. 11 includes associated parking facilities. ,
Work No. 12,An electronic communications cable (300 metres in length), being a diversion of an existing cable, in the western verge of Stotfold Road commencing at point F1 and terminating at point F2 on the works and land plans. ,

In the District of North Hertfordshire ,
Stotfold Road,Widening of street between points F1 and F2 on the works and land plans to accommodate new junction with a new private access road (Work No. 11) on the western side of the carriageway and creation of a right turn lane for southbound traffic wishing to enter the access road. ,

In the District of North Hertfordshire,,
,Cadwell Lane,
,Wilbury Way,
,Stotfold Road,

In the District of North Hertfordshire ,
Footpath FP 026,Footpath stopped up between points G3 and G5,New footpath between points G3 and G5 via G4 ,
Footpath FP 089,Footpath stopped up between points H1 and H6,New footpath between points  H3, H4, H5, H6 and H2 ,

In the District of North Hertfordshire ,
Cadwell Lane,Northwards of a point 20 metres south of the bridge carrying the Hitchin to Peterborough Section of the East Coast Main Line over Cadwell Lane. ,
Stotfold Road,In part between the bridge carrying the Hitchin to Cambridge Railway over Stotfold Road and a point 330 metres north of that bridge. ,
Footpath FP 026,Between points G1 and G3 ,
,Between points G5 and G2 ,
Footpath FP 089,Between points H6 and H2 ,

In the District of North Hertfordshire,,
,Cadwell Lane,
,Wilbury Way,
,Stotfold Road,

In the District of North Hertfordshire ,
Cadwell Lane (scrap metal works),3,Construction works and permanent right of access ,
Cadwell Lane,11,Construction works and permanent right of access ,
Cadwell Lane (scrap metal works),21,Construction works and provision of exchange land ,
East Coast Main Line and land west of the railway,28, 29, 30, 31, 34, 35 and 37,Construction works and permanent right of access ,
Land east of East Coast Main Line,41 and 43,Construction works and permanent right of access ,
Sewage treatment works north west of Hitchin Business Centre,47 and 49,Construction works and permanent right of access ,
Agricultural land north of Wilbury Way,50 and 52,Construction works and permanent right of access ,
Wilbury Way,57,Permanent farm access ,
Agricultural land north east of Hitchin Business Centre,60 and 62,Construction works and permanent right of access ,
Agricultural land west of Hitchin to Cambridge line,63,Construction works and permanent right of access ,
Hitchin to Cambridge Line,64,Construction works ,
Agricultural land west of Hitchin to Cambridge Line,66,Construction works and permanent right of access ,
Agricultural land west of Stotfold Road,67A,Road widening, new access and construction works ,

In the District of North Hertfordshire ,
Cadwell Lane (scrap metal works) ,3,
East Coast Main Line and land west of the railway ,29, 30, 31 and 34,
Private road within National Grid Operational Centre ,40,
Land east of East Coast Main Line ,41 and 43,
Sewage treatment works north west of Hitchin Business Centre ,47 and 49,
Agricultural land north of Wilbury Way ,50 and 52,
Wilbury Way ,57,
Agricultural land north east of Hitchin Business Centre ,60 and 62,
Agricultural land west of Hitchin to Cambridge line ,63,
Land to the west of the East Coast Main Line,Land shown coloured green on the open space plan ,
Land to the west of the East Coast Main Line,Land shown coloured yellow on the open space plan ,

In the District of North Hertfordshire ,
Private road within scrap metal works,7 and 8,Construction worksite and access,Works Nos. 1, 2, 3 and 4 ,
Cadwell Lane,12, 13 and 14,Construction worksite and access,Work Nos. 1, 2, 3 and 4 ,
River Hiz,15 and 17,Construction worksite and access ,Work No. 4,
Cadwell Marsh,17A,Construction worksite and access ,Work No. 4,
Cadwell Marsh,23 and 25,Construction worksite and access,Works Nos. 1, 2, 3 and 4 ,
Agricultural land to the north of Cadwell Marsh ,26A,Construction worksite and access,Works Nos. 1, 2 and 3,
Scrubland to the west of the East Coast Main Line ,31A,Construction worksite and access,Work No. 1,
Sewage treatment works north west of Hitchin Business Centre ,44,Construction worksite and access,Work No. 8,
Sewage treatment works north west of Hitchin Business Centre ,47A,Construction worksite and access,Work No. 1,
Agricultural land to the north of Wilbury Way ,50A,Construction access,Work No. 9,
Wilbury Way,55 and 56,Construction worksite and access ,Work No. 9,
Agricultural land north west of the Hitchin to Cambridge railway ,63A,Construction worksite and access,Work No. 10,
Agricultural land to the west of Stotfold Road,66A,Construction worksite and access,Works Nos. 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12 ,
Stotfold Road,68,Alteration of street layout (widening of Stotfold Road) ,Work No. 11,
Land to the west of the East Coast Main Line,Land shown coloured green on the open space plan ,Access route,Works Nos. 1, 2, 3, 4, 5, 6, 7, 8 and 9,
Land to the west of the East Coast Main Line,Land shown coloured yellow on the open space plan,Construction of drainage outfall, headwall and detention basin ,Work No. 4,

Cadwell Lane,Northwards of a point 20 metres south of the bridge carrying the Hitchin to Peterborough section of the East Coast Main Line over Cadwell Lane ,To maintain traffic flow during construction of the authorised works.,
Stotfold Road,So much of Stotfold Road as lies within the Order limits,To maintain traffic flow during construction of the authorised works. ,