Search Legislation

The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 200

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2008 No. 2988

HIGHWAYS, ENGLAND

The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 200

Made

13th November 2008

Coming into force in accordance with article 1

The Secretary of State for Transport makes this Instrument in exercise of powers conferred by section 106(3) of the Highways Act 1980 (1)and now vested in him(2).

1.  This Instrument may be cited as “The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 Confirmation Instrument 2008” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2.  The Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008 (“the Scheme”) is hereby confirmed with modifications.

3.  The Scheme as confirmed is set out in the Schedule hereto (including the plans) and copies of the Scheme with its accompanying plans as modified are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA, and at the offices of the Council of the City of Wakefield, Reception Desk, County Hall, Wakefield WF1 2QW.

Signed by authority of the Secretary of State for Transport

J Blackie

Regional Director, Government Office for the North East

13th November 2008

THE SCHEDULE

The Council of the City of Wakefield (hereinafter referred to as “the Council” makes this Scheme in exercise of their powers under section 106(3) of the Highways Act 1980 and all other powers enabling them in that behalf.

1.   The Council are authorised to construct over the navigable waters of the River Calder the footbridge specified in the Schedule to this Scheme as part of the highway which is to be constructed between Thornes Lane and the Hepworth Gallery in the Metropolitan District of Wakefield.

2.   The Scheme may be cited as the Council of the City of Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008.

THE SCHEDULE TO THE SCHEME

PLANS AND SPECIFICATIONS OF THE FOOTBRIDGE

The location and general design of the Footbridge are shown on the plan numbered DWG No. 3346 and marked “The Council of the City Wakefield (Wakefield Waterfront Hepworth Gallery Footbridge) Scheme 2008”.

POINTS OF COMMENCEMENT AND TERMINATION

THORNES LANE APPROACH_FROM THRESHOLD

From a point along the northern bank of the River Calder (on Thornes Lane) 106.15 metres west of the top north western parapet of the New Wakefield Bridge and 62.9 metres south. (126.5 metres measured in a direct line, point to point.)

HEPWORTH GALLERY APPROACH_FROM THRESHOLD

To a point on the south bank of the River Calder, 98.55 metres south of the top north western parapet of the New Wakefield Bridge and 69.89 metres west. (122.12 metres measured in a direct line, point to point.)

SPAN

The footbridge is 50.8 metres long, with a single clear span of 43.6 metres.

HEADWAY

Not less than 3.66 metres above normal water level of 22.11 metres A.O.D. over the whole waterway.

WATERWAY

The entire navigable width of the waterway is maintained.

Explanatory Note

(This note is not part of the Instrument)

This instrument confirms a scheme to construct over the navigable waters of the River Calder a footbridge as part of the highway which is to be constructed between Thornes Lane and the Hepworth Gallery in the Metropolitan District of Wakefield.

regulatory impact assessment has not been produced for this instrument as it has no significant impact on business, charities or voluntary bodies.

(2)

S.I. 1981/238

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources