PART 2WORKS PROVISIONS

Power to construct works

3.—(1) Subject to the provisions of this Order, the Company may in the lines and situations and upon the lands delineated on the deposited plans and within the limits of deviation shown thereon and according to the levels shown on the deposited sections, construct and maintain the following works in the Borough of Redcar and Cleveland, with all necessary works and conveniences connected therewith—

Work No.1 A wall, including a quay face 1035 metres in length forming berths for vessels, extending into the river enclosing an area of 9 hectares, commencing by a retaining wall south of Teesport Container Terminal 1 at a point at NZ523696454563, thence extending in a straight line into Tees Dock at Potash Quay to a point at NZ523660454526, thence extending in a straight line to a point at NZ523672454514, thence extending in a straight line to the commencement of the quay face at a point at NZ523698454540, thence extending in a straight line in the river to the termination of the quay face at a point at NZ524685454869, thence extending in a straight line by means of a retaining wall to a point at NZ524718454880, thence extending in a straight line to a point at NZ524712454899 at Dabholm Gut, thence extending in a straight line to a point at NZ524678454888, thence extending in a straight line and terminating at a point at NZ524663454935.

  • Work No 2 A floating pontoon steel fabrication linkspan bridge commencing on the bank of the river at a point at NZ523319454175 and terminating in the river at a point at NZ523382454135 and a series of dolphins forming a mooring and berthing line, including the excavation of that part of the bank of the river under the proposed linkspan bridge and the removal of the Queen Elizabeth II Quay.

(2) The Company may, for the purposes of Work No.1 authorised by paragraph (1), demolish and remove any structures lying within the limits of deviation of Work No.1 (including Teesport Container Terminal 1, the former oil jetty and the roll on - roll off facility at the entrance to Dabholm Gut) and enclose and reclaim so much of the bed of the river and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the undertaking.

(3) Subject to the provisions of this Order, the Company may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the work and may maintain the same as reconstructed, extended, enlarged, replaced or relaid.

(4) The works shall for all purposes form part of the undertaking.