- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Statutory Instruments
HIGHWAYS, ENGLAND
Made
2nd November 2006
Coming into force
13th November 2006
1. This Order may be cited as the A3 Trunk Road (Hindhead) Order 2006 and shall come into force on 13th November 2006.
2. In this Order—
| (1) | all measurements of distance are measured along the route of the relevant highway; | |
| (2)(i) | “the main new road” | means the new highway which the Secretary of State proposes to construct along the route described in the Schedule to this Order; |
| (ii) | “the new trunk road” | means the main new road; |
| (iii) | “the plan” | means the site plan contained in the plan folio numbered HA 10/MP/009, marked “The A3 Trunk Road (Hindhead) Order 2006”, signed by authority of the Secretary of State for Transport and deposited at ODPM-DfT, Records Management Branch, Floor 13, (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; |
| (iv) | “the trunk road” | means the London-Portsmouth Trunk Road (A3) |
3. The main new road shall become a trunk road from the date when this Order comes into force.
4. The centre line of the new trunk road is indicated by a heavy black line on the plan.
5. The Secretary of State directs as respects any part of a highway which crosses the route of the new trunk road that—
(a)where the highway is maintainable at the public expense by a local highway authority, the part in question shall be maintained by that authority, and
(b)where the highway is not so maintainable and is not maintainable under a special enactment or by reason of tenure, enclosure or prescription, the Secretary of State shall be under no duty to maintain the part in question,
until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for traffic.
Signed by authority of the Secretary of State for Transport
John Sherwood
A Divisional Director
Highways Agency
2nd November 2006
The route of the main new road is 5.3 km in length, starting at a point on the existing A3 Trunk Road 75 metres north east of its junction with Hammer Lane, and proceeding in a general north easterly direction to the east of Grayshott and Hindhead and in twin tunnels beneath Hindhead Common to terminate at a point on the existing A3 Trunk Road 190 metres north of its junction with Boundless Road, all in the Borough of Waverley in the County of Surrey.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: