THE SCHEDULE TO THE SCHEMEPLANS AND SPECIFICATION OF CAMBRIDGE RIVERSIDE FOOT/CYCLE BRIDGE

POINTS OF COMMENCEMENT AND TERMINATION OF THE RIVER SPAN

Riverside Approach—Top of the East Abutment

From a point on the east bank of the River Cam 115 metres south of the junction of Riverside and Stanley Road and 81.3 metres west (140 metres direct line point to point).

St Andrews Approach—Top of the West Abutment

To a point on the west bank of the River Cam 93.5 metres west of the junction of Riverside and Stanley Road and 85 metres south (126.4 metres direct line point to point).

Navigation Span

The bridge has a clear span of 32.5 metres (between abutments), spanning diagonally across the entire width of the River Cam (22.5 metres approx).

Headroom and Waterway

The navigation waterway is unrestricted for the full width of the river. The soffit level of the bridge is +7.7 metres AOD, giving a 200 mm clearance above the current air-draught requirement.

Overall dimensions

The bridge deck has an overall width of 4.4 metres and will carry a 1,300 mm wide footpath and 2,300 mm wide cycleway.