xmlns:atom="http://www.w3.org/2005/Atom"
  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Revocation

  4. 3.Interpretation

  5. 4.Licence charges and time of payment

  6. 5.Concessionary licence charges

  7. 6.Other licence charges

  8. Signature

    1. SCHEDULE 1

      REVOCATIONS

    2. SCHEDULE 2

      LICENCE CHARGES AND PAYMENT INTERVALS

    3. SCHEDULE 3

      DESIGNATIONS OF HEAVILY CONGESTED, CONGESTED AND NON-CONGESTED AREAS FOR THE BUSINESS RADIO (ON-SITE LOCAL COMMUNICATIONS SYSTEMS) AND (ON-SITE SPEECH AND DATA SYSTEMS) LICENCES

    4. SCHEDULE 4

      DESIGNATIONS OF HEAVILY CONGESTED, CONGESTED AND NON-CONGESTED AREAS FOR THE BUSINESS RADIO (IR 2008 DATA) LICENCE

    5. SCHEDULE 5

      DESIGNATIONS OF HEAVILY CONGESTED, CONGESTED AND NON-CONGESTED AREAS FOR THE BUSINESS RADIO (WIDE AREA DISTRESS ALARM SYSTEMS), (WIDE AREA ONE-WAY PAGING AND SPEECH SYSTEMS), AND (WIDE AREA SPEECH AND DATA SYSTEMS) LICENCES AND FEES PAYABLE FOR THE BUSINESS RADIO (WIDE AREA SPEECH AND DATA SYSTEMS) LICENCE

      1. PART 1 FEES PAYABLE FOR THE BUSINESS RADIO (WIDE AREA SPEECH AND DATA SYSTEMS) LICENCE

      2. PART 2 DESIGNATIONS OF HEAVILY CONGESTED, CONGESTED AND NON-CONGESTED AREAS

      3. PART 3 DETERMINATION OF CATEGORY FOR FEES PAYABLE UNDER PART 1

    6. SCHEDULE 6

      DESIGNATIONS OF HEAVILY CONGESTED, CONGESTED AND NON-CONGESTED AREAS FOR THE BUSINESS RADIO (COMMON BASE STATION) LICENCE

    7. SCHEDULE 7

      FORMULA FOR CALCULATING THE APPROPRIATE SUM FOR THE POINT TO POINT FIXED LINKS LICENCE

      1. PART 1 FORMULA

        1. 1.In this Schedule— (a) “the appropriate sum” means the amount...

        2. 2.The formula is AS = Sp x Bwf x Bf...

        3. 3.Where the number of the bandwidth (in MHz) of a...

      2. PART 2 BAND FACTOR

      3. PART 3 PATH LENGTH FACTOR

      4. PART 4 MINIMUM PATH LENGTH

      5. PART 5 AVAILABILITY FACTOR

    8. SCHEDULE 8

      FEES PAYABLE FOR THE SATELLITE (AIRCRAFT EARTH STATION), (EARTH STATION NETWORK), (EARTH STATION ON BOARD VESSEL), (PERMANENT EARTH STATION) AND (TRANSPORTABLE EARTH STATION) LICENCES

      1. PART 1 FORMULA FOR CALCULATING THE APPROPRIATE SUM FOR THE SATELLITE (AIRCRAFT EARTH STATION), (EARTH STATION NETWORK) AND (EARTH STATION ON BOARD VESSEL) LICENCES

        1. 4.In this Part, “the appropriate sum” means the amount in...

        2. 5.The formula is— A S = 433.4 × ∑ n...

        3. 6.Where the number of earth station terminals licensed in the...

      2. PART 2 FORMULA FOR CALCULATING THE APPROPRIATE SUM FOR THE SATELLITE (PERMANENT EARTH STATION) LICENCE

        1. 7.In this Part, subject to paragraph 3, “the appropriate sum”...

        2. 8.The formula is— A S = 433.4 × ∑ ijk...

        3. 9.Where the amount in pounds sterling calculated in accordance with...

      3. PART 3 MODIFIER VALUE FOR CALCULATING THE APPROPRIATE SUM FOR THE SATELLITE (PERMANENT EARTH STATION) LICENCE

      4. PART 4 FEE PAYABLE FOR THE SATELLITE (TRANSPORTABLE EARTH STATION) LICENCE

        1. 10.The appropriate sum is the amount in pounds sterling, which...

        2. 11.In this Part— (a) “OMP” means the number corresponding to...

  9. Explanatory Note