2003 No.845
The Offshore Installations (Safety Zones) Order 2003
Made
Coming into force
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 19871 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, and for the purpose of giving effect to proposals submitted to him by the Health and Safety Commission under section 24(2A) of the Act, hereby makes the following order:
Citation and commencement1
This order may be cited as the Offshore Installations (Safety Zones) Order 2003 and shall come into force on 7th April 2003.
Establishment of safety zones2
A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Amendment of the Offshore Installations (Safety Zones) (No. 2) Order 20023
In the Schedule to the Offshore Installations (Safety Zones) (No. 2) Order 20022—
a
in the entry relating to Madoes Production Manifold, for “01° 26.02− E” in column 3 there shall be substituted “01° 26.21− E”;
b
in the entry relating to Mirren East Production Well—
i
for “57° 18.5−” in column 2 there shall be substituted “57° 18.51−”; and
ii
for “00° 54.66− E” in column 3 there shall be substituted “01° 54.66− E”;
c
in the entry relating to Mirren West Production Well—
i
for “57° 18.06−” in column 2 there shall be substituted “57° 18.65−”; and
ii
for “01° 52.04− E” in column 3 there shall be substituted “01° 52.42− E”;
d
in the entry relating to Galley G6 Well and Tree, for “00° 31.06− E” in column 3 there shall be substituted “00° 31.61− E”;
e
in the entry relating to Drill Centre 4 (DC4), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”; and
f
in the entry relating to Drill Centre 5 (DC5), for “Block 211/13a” in column 1 there shall be substituted “Block 211/14”.
Revocation of orders4
The following orders are revoked—
a
the Offshore Installations (Safety Zones) (No. 2) Order 19833;
b
the Offshore Installations (Safety Zones) (No. 21) Order 19834; and
c
the Offshore Installations (Safety Zones) (No. 50) Order 19845.
Signed by authority of the Secretary of State for Work and Pensions.
SCHEDULESAFETY ZONES
(1) | (2) | (3) |
|---|---|---|
Name or other designation of the offshore installation | Latitude North | Longitude East |
Jill Well 30/7a-12, Block 30/6, Jill-Julia Field | 56° 45.699− | 02° 18.712− |
Sycamore Main Manifold, Block 16/12a, Sycamore Field | 58° 32.49− | 01° 16.06− |
Sycamore Satellite Manifold, Block 16/12a, Sycamore Field | 58° 32.24− | 01° 15.43− |