PART IPRELIMINARY

Interpretation

2.—(1) In this Order, unless the context otherwise requires–

“authorised works” means the scheduled works and any other works authorised by this Order;

“the deposited plans” means the plans certified by the Secretary of State as the deposited plans for the purposes of this Order;

“the deposited sections” means the sections certified by the Secretary of State as the deposited sections for the purposes of this Order;

“the limits of deviation” means the limits of deviation for the scheduled works shown on the deposited plans;

“maintain” includes inspect, repair, adjust, remove, reconstruct, and replace and “maintenance” shall be construed accordingly;

“the scheduled works” means the works specified in Schedule 1 to this Order;

“tidal work” means so much of any authorised work as is on, under or over tidal waters or tidal land below the level of mean high water springs;

“Trinity House” means the Corporation of Trinity House of Deptford Strond;

“the undertaker” means the Berkeley Festival Waterfront Company Limited.

(2) All directions, distances and dimensions stated in any description of works or powers shall be construed as if the words “or thereabouts” were inserted after each such reference.