The Offshore Installations (Safety Zones) Order 1998
Citation and commencement1.
This order may be cited as the Offshore Installations (Safety Zones) Order 1998 and shall come into force on 26th March 1998.
Establishment of safety zones2.
A safety zone is hereby established around each installation specified in column 1 of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Removal of safety zones3.
Signed by authority of the Secretary of State.
SCHEDULESAFETY ZONES
(1) | (2) | (3) |
|---|---|---|
Name or other designation of the offshore installation | Latitude | Longitude |
Schiehallion Central | 60°20'08.76"N | 04°02'05.08"W |
Schiehallion West | 60°19'58.52"N | 04°05'49.56"W |
Schiehallion North | 60°22'10.71"N | 04°01'28.73"W |
Schiehallion Loyal | 60°24'42.72"N | 04°03'18.35"W |
Schiehallion Gas Disposal | 60°19'43"N | 04°09'40"W |
Galahad Tee | 53°31'21"N | 01°21'58"E |
Larch-Well X (23) Z6 | 58°35'43.48"N | 01°15'20.81"E |
Larch-Well X (24) Z7 | 58°35'49.047"N | 01°15'27.36"E |
This order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point, around each installation specified in the Schedule to this order and stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)) (Article 2).
Vessels (which for this purpose include hovercraft, submersible apparatus and installations in transit) are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently the Offshore Installations (Safety Zones) Regulations 1987 (S.I. 1987/1331)).
The order removes the safety zones around Emerald Central Location, Emerald Field FSU Template, Emerald Well WSE, Emerald Wells PSF and PSD and Emerald Wells WSA and WSB by deleting the entries relating to them in Schedule 1 to the Offshore Installations (Safety Zones) Order 1997/735 (Article 3).