1998 No. 1224
The Offshore Installations (Safety Zones) (No. 2) Order 1998
Made
Coming into force
The whole order except in article 2 the words ‘and Part II” and Part II of the Schedule
In article 2 the words “and Part II” and Part II of the Schedule
The Secretary of State, in exercise of the powers conferred on him by section 22(1), (2) and (3) of the Petroleum Act 19871 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, hereby makes the following order:
1
This Order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 1998 and shall come into force on 1st June 1998 except in article 2 the words “and Part II” and Part II of the Schedule, which shall come into force on 1st August 1998.
2
A safety zone is hereby established around each installation specified in column 1 of Part 1 and Part II of the Schedule hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
Signed by the authority of the Secretary of State
SCHEDULESAFETY ZONES
(1) | (2) | (3) |
|---|---|---|
Name or other designation of the offshore installation | Latitude North | Longitude East |
PART I | ||
Fulmar STL Buoy | 56°28'38.2" | 02°07'53.9" |
Renee Field | 58°03'03" | 00°21'05" |
Rubie Field | 58°04'36" | 00°26'31" |
PART II | ||
Banff–Manifold 29/2a | 56°59'24.39" | 01°18'56.22" |
Offloading Tanker Point–22/27a | 57°00'30.49" | 01°19'01.27" |
Bruce Field Western Area Subsea Facilities | 59°44'01.19" | 01°34'20.99" |
(This note is not part of the order)