1997 No. 735
OFFSHORE INSTALLATIONS

The Offshore Installations (Safety Zones) Order 1997

Made
Coming into force
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 19871 (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, hereby makes the following order:

Citation and Commencement1.

This order may be cited as the Offshore Installations (Safety Zones) Order 1997 and shall come into force on 31st March 1997.

Establishment of safety zones2.

A safety zone is hereby established around each installation specified in column 1 of Schedule 1 hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of that Schedule.

Revocation of orders3.

The orders listed in Schedule 2 hereto are revoked.

Signed by authority of the Secretary of State.

Paul Beresford
Parliamentary Under Secretary of State,
Department of the Environment

SCHEDULE 1SAFETY ZONES

Article 2

(1)

(2)

(3)

Name or other designation of the offshore installation

Latitude North

Longitude

South Cormorant Well W4

61° 11' 23.63"

1° 6' 15.6"E

South Cormorant Well P5

61° 10' 52.4"

1° 8' 31.4"E

South Cormorant A UMC

61° 9' 38.957"

1° 6' 38.37"E

Beryl Well 9/13-55

59° 36' 15.6"

1° 29' 4.14"E

Beryl Well 9/13-20B

59° 35' 10.26"

1° 32' 5.77"E

Balmoral Well 16/21B-29

58° 15' 9.71"

1° 3' 25.45"E

Balmoral Well 16/21A-7z

58° 14' 41.8"

1° 8' 17.94"E

Balmoral Well 16/21A-16

58° 13' 43.66"

1° 8' 57.88"E

Balmoral Well 16/21B-14

58° 13' 36.41"

1° 3' 39.29"E

Balmoral Well 16/21B-4A

58° 12' 39.97"

1° 10' 347"E

Buchan Well 21/1-10

57° 53' 33.45"

0° 0' 43.17"E

Buchan Well 21/1-8

57° 53' 30.6"

0° 0' 48.39"E

Thames Bure Wellhead

53° 7' 25.5"

2° 25' 32.3"E

Hewett Well 48/30-8

53° 5' 13.13"

1° 51' 4"E

Thames Yare Wellhead

53° 2' 41.76"

2° 34' 27.23"E

Hewett Well 48/30-9

53° 2' 9"

1° 52' 31"E

Claymore Template T1—WI Wellhead

58° 28' 28.71"

0° 15' 20.43"W

Claymore Template T3—WI Wellhead

58° 25' 55.3"

0° 15' 32.6"W

Scapa Template

58° 25' 39.02"

0° 19' 4.49"W

Highlander Well 14/20

58° 24' 10.4"

0° 7' 19.26"W

Petronella Template

58° 20' 25.4"

0° 5' 30.21"W

Buchan Well 20/5A-1

57° 54' 14.22"

0° 0' 35.88"W

Morecambe Well 110/2A-7

53° 55' 5.35"

3° 39' 44.68"W

Beryl Field Wiss

59° 35' 16.26"

1° 28' 43.62"E

Beryl 9/13B Ness

59° 33' 36.72"

1° 25' 52.02"E

North Alwyn Well 3/4A-15

60° 50' 49.26"

1° 40' 59.76"E

Audrey Well 49/11A-7

53° 32' 28.31"

2° 0' 32.35"E

Beryl Well 9/13-48

59° 30' 43.8"

1° 31' 50.28"E

Della Well 48/30-11

53° 4' 43.81"

1° 53' 19.92"E

Ivanhoe/Robroy Riser Base Manifold 15/21

58° 11' 35.36"

0° 6' 40.73"E

Ivanhoe Manifold 15/21

58° 11' 12.21"

0° 5' 19.7"E

Robroy Manifold 15/21

58° 11' 50.88"

0° 8' 7.95"E

Central Brae Template 16/7a

58° 44' 44.9"

1° 18' 40.1"E

Piper A

58° 28' 1.03"

0° 15' 35.22"E

Emerald Central Location

60° 39' 34.6"

0° 59' 22.5"E

Linnhe Protective Structure

59° 39' 49.46"

1° 34' 41.86"E

Osprey W.I. Manifold

61° 19' 37.6"

1° 32' 49.6"E

Moira Wellhead

58° 2' 28.03"

1° 40' 12.86"E

Osprey Production Manifold

61° 19' 25.8"

1° 32' 49.11"E

Emerald Field FSU Template

60° 39' 41"

1° 2' 27"E

Chanter Wellhead Protection Unit

58° 23' 27"

0° 22' 15.72"E

Saltire Wellhead Protection Unit

50° 25' 31.03"

0° 22' 5.1"E

Gannet D Subsea Drilling Centre

57° 19' 5.1"

1° 4' 58.3"E

Staffa Field Subsea Wells

60° 44' 50"

1° 34' 48"E

Toni Production Subsea Structure

58° 26' 0.13"

1° 17' 10.67"E

Toni WI Subsea Structure

58° 25' 56.53"

1° 17' 19.07"E

Gannet C1 Drilling Centre

57° 10' 12"

0° 56' 48.6"E

Gannet C2 Drilling Centre

57° 9' 37.3"

0° 58' 31.6"E

Gannet C3 Drilling Centre

57° 9' 13"

0° 55' 32.3"E

Gannet C4 Drilling Centre

57° 8' 21.8"

0° 57' 18.1"E

Strathspey Manifold Structure

60° 55' 39"

1° 42' 25"E

Strathspey Satellite Wells

60° 56' 32.18"

1° 41' 29.67"E

Nelson Oil Field Template

57° 39' 46.35"

1° 8' 44.02"E

Lyell A Cluster Manifold

60° 53' 57.51"

1° 16' 17.49"E

Alwyn Extension Wells

60° 45' 46.28"

1° 42' 53.85"E

Scott WI Manifold West

58° 17' 5.08"

0° 10' 17.91"E

Scott WI Manifold South

58° 15' 29.41"

0° 12' 24"E

Scott WI Manifold East

58° 16' 54.92"

0° 15' 25.13"E

Scott Production Cluster East

58° 16' 54.43"

0° 14' 8.53"E

Emerald Well WSE

60° 41' 1.51"

0° 56' 35.07"E

Emerald Wells PSF and PSD

60° 40' 9.46"

0° 57' 54.12"E

Emerald Wells WSA and WSB

60° 38' 42.71"

1° 1' 7.71"E

Hyde 48/6 Subsea Template

53° 48' 26.3"

1° 1' 43.3"E

Orwell Subsea Structure

53° 8' 27.88"

3° 2' 34.45"E

Ellon Development Subsea Wellhead

60° 35' 52.71"

1° 48' 26.65"E

Nelson Subsea Manifold

57° 37' 0"

1° 11' 30"E

Gryphon Subsea Well Cluster

59° 21' 4.1"

1° 33' 9.9"E

Anglia West Subsea Structure

53° 22' 22.11"

1° 34' 50.2"E

Phillips Ann Subsea Installation

53° 42' 55"

2° 3' 22"E

Brent South Subsea Wellhead

60° 59' 33.6"

1° 40' 57.79"E

Johnston Field Development

54° 2' 47"

1° 12' 27"E

Hudson Field Development Manifold

61° 15' 10"

0° 44' 8.1"E

Wellhead L1 and L2

61° 15' 38.9"

0° 42' 33.1"E

Fulmar FSU/SALM

56° 27' 44"

2° 7' 14"E

Pelican Drilling Centre

61° 2' 2.06"

1° 7' 44.51"E

Victor North West 49/17-JM

53° 21' 3.22"

2° 17' 43.46"E

Jupiter/Callisto Wellhead

53° 14' 31.92"

2° 23' 16.37"E

Cyrus Manifold

58° 6' 9.16"

1° 26' 47.71"E

Cyrus Wellhead 16/28-C1

58° 6' 9.63"

1° 26' 46.76"E

Cyrus Wellhead 16/28-C2

58° 6' 9.87"

1° 26' 47.04"E

Fife Field Wellhead 1

56° 0' 10.45"

3° 11' 5.55"E

Fife Field Wellhead 2

56° 0' 34.39"

3° 11' 36.2"E

Birch Field Manifold

58° 34' 52"

1° 15' 40"E

Nevis Field Wells

59° 31' 56.07"

1° 24' 25.45"E

KT Well

59° 34' 4.43"

1° 28' 51.8"E

South Scott Manifold

58° 14' 54.91"

0° 10' 45.51"E

Foinaven Drilling Centre 1

60° 18' 39.79"

4° 20' 16"W

Foinaven Drilling Centre 2A

60° 20' 37.45"

4° 14' 43.31"W

Foinaven DC2 West WI

60° 20' 55.57"

4° 17' 39.07"W

Foinaven DC2 East WI

60° 18' 43.08"

4° 13' 5.87"W

Liverpool Bay Pipeline End Manifold

53° 41' 0.11"

3° 32' 42.97"W

Thelma Subsea Installation

58° 22' 28.32"

1° 18' 37.58"E

Harding Turret Loading System

59° 16' 37.23"

1° 33' 2.68"E

Joanne Subsea Facility

56° 41' 47.4"

2° 14' 56.4"E

Alison Subsea Facility

53° 30' 33.21"

2° 10' 11.82"E

Teal Oil Producer

57° 17' 4.6"

0° 50' 55.7"E

Teal Water Injection Centre

57° 17' 19.6"

0° 49' 36"E

Teal South Drilling Centre

57° 13' 50.8"

0° 49' 5.8"E

Guillemot A Drilling Centre

57° 10' 6.1"

0° 49' 44"E

Dawn Subsea Installation

53° 7' 48.31"

1° 41' 38.36"E

South Magnus WI Well

61° 32' 23.99"

1° 15' 42.77"E

South Magnus Production Well

61° 34' 4.78"

1° 15' 44.21"E

WI Tree/Flowbase

58° 12' 21.57"

0° 16' 47.32"E

Central Telford Manifold

58° 13' 4.27"

0° 14' 57.69"E

Marmion/West Telford Manifold

58° 14' 19.44"

0° 12' 31.09"E

East Drill Centre

58° 18' 6.51"

0° 45' 18.81"E

West Drill Centre

58° 19' 26.91"

0° 41' 52.86"E

Machar Wellhead

57° 4' 52.2"

2° 5' 6.69"E

Marnock Drilling Plate

57° 17' 42.81"

1° 39' 45.43"E

Mungo Template

57° 22' 31.2"

1° 59' 53.28"E

Umbilical distribution Assembly

60° 17' 59.58"

4° 9' 51.55"W

Esmond Subsea Barrier Valve

54° 35' 10.93"

1° 25' 43.98"E

Hewitt—Little Dotty Well

53° 2' 51.9"

1° 50' 42.5"E

Britannia—Template

58° 2' 55.14"

1° 8' 19.54"E

Britannia—Manifold

58° 4' 27.29"

0° 53' 35.8"E

Fergus—Wellhead

55° 58' 8"

3° 15' 52.6"E

Foinaven Gas Disposal Well

60° 17' 25.24"

4° 6' 59.26"W

Durward 1 Wellheads

57° 28' 0.1"

0° 9' 41.4"E

Durward 2 Wellheads

57° 28' 54.1"

0° 9' 40.6"E

Dauntless Wellheads

57° 31' 24.2"

0° 6' 32.2"E

Kingfisher Production Manifold

58° 46' 18.2"

1° 29' 28.8"E

Curlew B—Wellhead

56° 43' 28.80"

1° 15' 46.12"E

Curlew D—Wellhead

56° 43' 22.14"

1° 18' 40.61"E

Gannet F—Manifold

57° 5' 28.15"

0° 57' 37.36"E

SCHEDULE 2REVOCATIONS

Article 3

Orders revoked

References

The Offshore Installations (Safety Zones) (No. 48) Order 1987

S.I.1987/1332

The Offshore Installations (Safety Zones) (No. 70) Order 1987

S.I.1987/2016

The Offshore Installations (Safety Zones) (No. 71) Order 1987

S.I.1987/2017

The Offshore Installations (Safety Zones) Order 1988

S.I.1988/1080

The Offshore Installations (Safety Zones) (No. 2) Order 1988

S.I.1988/1081

The Offshore Installations (Safety Zones) (No. 3) Order 1988

S.I.1988/1481

The Offshore Installations (Safety Zones) (Amendment) Order 1988

S.I.1988/1482

The Offshore Installations (Safety Zones) Order 1989

S.I.1989/508

The Offshore Installations (Safety Zones) (No. 2) Order 1989

S.I.1989/887

The Offshore Installations (Safety Zones) (No. 3) Order 1989

S.I.1989/1851

The Offshore Installations (Safety Zones) Order 1990

S.I.1990/216

The Offshore Installations (Safety Zones) (No. 2) Order 1990

S.I.1990/896

The Offshore Installations (Safety Zones) (No. 3) Order 1990

S.I.1990/897

The Offshore Installations (Safety Zones) (No. 4) Order 1990

S.I.1990/973

The Offshore Installations (Safety Zones) (No. 5) Order 1990

S.I.1990/1106

The Offshore Installations (Safety Zones) (No. 6) Order 1990

S.I.1990/2117

The Offshore Installations (Safety Zones) Order 1991

S.I.1991/207

The Offshore Installations (Safety Zones) (No. 2) Order 1991

S.I.1991/650

The Offshore Installations (Safety Zones) (No. 3) Order 1991

S.I.1991/1922

The Offshore Installations (Safety Zones) (No. 4) Order 1991

S.I.1991/2669

The Offshore Installations (Safety Zones) Order 1992

S.I.1992/79

The Offshore Installations (Safety Zones) (No. 2) Order 1992

S.I.1992/1429

The Offshore Installations (Safety Zones) (No. 3) Order 1992

S.I.1992/2314

The Offshore Installations (Safety Zones) (No. 4) Order 1992

S.I.1992/2852

The Offshore Installations (Safety Zones) Order 1993

S.I.1993/1406

The Offshore Installations (Safety Zones) (No. 2) Order 1993

S.I.1993/1664

The Offshore Installations (Safety Zones) (No. 3) Order 1993

S.I.1993/1893

The Offshore Installations (Safety Zones) (No. 4) Order 1993

S.I.1993/2479

The Offshore Installations (Safety Zones) Order 1994

S.I.1994/372

The Offshore Installations (Safety Zones) (No. 2) Order 1994

S.I.1994/1836

The Offshore Installations (Safety Zones) Order 1995

S.I.1995/494

The Offshore Installations (Safety Zones) (No. 4) Order 1995

S.I.1995/1956

The Offshore Installations (Safety Zones) (No. 5) Order 1995

S.I.1995/2363

The Offshore Installations (Safety Zones) (No. 6) Order 1995

S.I.1995/2795

The Offshore Installations (Safety Zones) Order 1996

S.I.1996/97

The Offshore Installations (Safety Zones) (No. 2) Order 1996

S.I.1996/850

The Offshore Installations (Safety Zones) (No. 3) Order 1996

S.I.1996/1194

The Offshore Installations (Safety Zones) (No. 4) Order 1996

S.I.1996/1492

The Offshore Installations (Safety Zones) (No. 5) Order 1996

S.I.1996/1862

The Offshore Installations (Safety Zones) (No. 6) Order 1996

S.I.1996/2304

The Offshore Installations (Safety Zones) (No. 7) Order 1996

S.I.1996/2859

The Offshore Installations (Safety Zones) (No. 8) Order 1996

S.I.1996/3139

(This note is not part of the order)

This order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point, around each installation specified in Schedule 1 to this order and stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)).

Vessels (which for this purpose include hovercraft, submersible apparatus and installations in transit) are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently the Offshore Installations (Safety Zones) Regulations 1987 (S.I. 1987/1331)).

The order revokes the orders listed in Schedule 2 which had previously established safety zones around all the installations specified in Schedule 1, except the new ones now established around Curlew B-Wellhead, Curlew D-Wellhead and Gannet F-Manifold, and had established twenty-four other safety zones, no longer required, around other installations.