Statutory Instruments
OFFSHORE INSTALLATIONS
Made
10th March 1997
Coming into force
31st March 1997
The Secretary of State, in exercise of the powers conferred on him by section 22(1) and (2) of the Petroleum Act 1987(1) (hereinafter referred to as “the Act”) and of all other powers enabling him in that behalf, hereby makes the following order:
1. This order may be cited as the Offshore Installations (Safety Zones) Order 1997 and shall come into force on 31st March 1997.
Commencement Information
I1Art. 1 in force at 31.3.1997, see art. 1
2. A safety zone is hereby established around each installation specified in column 1 of Schedule 1 hereto (being an installation stationed in waters to which subsection (7) of section 21 of the Act applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of that Schedule.
Commencement Information
I2Art. 2 in force at 31.3.1997, see art. 1
3. The orders listed in Schedule 2 hereto are revoked.
Commencement Information
I3Art. 3 in force at 31.3.1997, see art. 1
Signed by authority of the Secretary of State.
Paul Beresford
Parliamentary Under Secretary of State,
Department of the Environment
10th March 1997
Article 2
Commencement Information
I4Sch. 1 in force at 31.3.1997, see art. 1
| (1) | (2) | (3) |
|---|---|---|
| Name or other designation of the offshore installation | Latitude North | Longitude |
| South Cormorant Well W4 | 61° 11' 23.63" | 1° 6' 15.6"E |
| South Cormorant Well P5 | 61° 10' 52.4" | 1° 8' 31.4"E |
| South Cormorant A UMC | 61° 9' 38.957" | 1° 6' 38.37"E |
| Beryl Well 9/13-55 | 59° 36' 15.6" | 1° 29' 4.14"E |
| Beryl Well 9/13-20B | 59° 35' 10.26" | 1° 32' 5.77"E |
| Balmoral Well 16/21B-29 | 58° 15' 9.71" | 1° 3' 25.45"E |
| Balmoral Well 16/21A-7z | 58° 14' 41.8" | [F101° 06− 17.94' E] |
| Balmoral Well 16/21A-16 | 58° 13' 43.66" | 1° 8' 57.88"E |
| Balmoral Well 16/21B-14 | 58° 13' 36.41" | 1° 3' 39.29"E |
| Balmoral Well 16/21B-4A | 58° 12' 39.97" | 1° 10' 347"E |
| Buchan Well 21/1-10 | 57° 53' 33.45" | 0° 0' 43.17"E |
| Buchan Well 21/1-8 | 57° 53' 30.6" | 0° 0' 48.39"E |
| F2. . . | F2. . . | F2. . . |
| Hewett Well 48/30-8 | 53° 5' 13.13" | 1° 51' 4"E |
| F3. . . | F3. . . | F3. . . |
| Hewett Well 48/30-9 | 53° 2' 9" | 1° 52' 31"E |
| Claymore Template T1—WI Wellhead | 58° 28' 28.71" | 0° 15' 20.43"W |
| Claymore Template T3—WI Wellhead | 58° 25' 55.3" | 0° 15' 32.6"W |
| Scapa Template | 58° 25' 39.02" | 0° 19' 4.49"W |
| Highlander Well 14/20 | 58° 24' 10.4" | 0° 7' 19.26"W |
| Petronella Template | 58° 20' 25.4" | 0° 5' 30.21"W |
| Buchan Well 20/5A-1 | 57° 54' 14.22" | 0° 0' 35.88"W |
| F4. . . | F4. . . | F4. . . |
| Beryl Field Wiss | 59° 35' 16.26" | 1° 28' 43.62"E |
| Beryl 9/13B Ness | 59° 33' 36.72" | 1° 25' 52.02"E |
| North Alwyn Well 3/4A-15 | 60° 50' 49.26" | 1° 40' 59.76"E |
| Audrey Well 49/11A-7 | 53° 32' 28.31" | 2° 0' 32.35"E |
| Beryl Well 9/13-48 | 59° 30' 43.8" | 1° 31' 50.28"E |
| Della Well 48/30-11 | 53° 4' 43.81" | 1° 53' 19.92"E |
| F5. . . | F5. . . | F5. . . |
| F5. . . | F5. . . | F5. . . |
| F5. . . | F5. . . | F5. . . |
| Central Brae Template 16/7a | 58° 44' 44.9" | 1° 18' 40.1"E |
| Piper A | 58° 28' 1.03" | 0° 15' 35.22"E |
| F6. . . | F6. . . | F6. . . |
| F7. . . | F7. . . | F7. . . |
| Osprey W.I. Manifold | 61° 19' 37.6" | 1° 32' 49.6"E |
| F8. . . | F8. . . | F8. . . |
| Osprey Production Manifold | 61° 19' 25.8" | 1° 32' 49.11"E |
| F6. . . | F6. . . | F6. . . |
| Chanter Wellhead Protection Unit | 58° 23' 27" | 0° 22' 15.72"E |
| Saltire Wellhead Protection Unit | [F958° 25− 31.04] | [F1000° 22− 5.34' E] |
| Gannet D Subsea Drilling Centre | 57° 19' 5.1" | 1° 4' 58.3"E |
| F11. . . | F11. . . | F11. . . |
| Toni Production Subsea Structure | 58° 26' 0.13" | 1° 17' 10.67"E |
| Toni WI Subsea Structure | 58° 25' 56.53" | 1° 17' 19.07"E |
| Gannet C1 Drilling Centre | 57° 10' 12" | 0° 56' 48.6"E |
| Gannet C2 Drilling Centre | 57° 9' 37.3" | 0° 58' 31.6"E |
| Gannet C3 Drilling Centre | 57° 9' 13" | 0° 55' 32.3"E |
| Gannet C4 Drilling Centre | 57° 8' 21.8" | 0° 57' 18.1"E |
| Strathspey Manifold Structure | 60° 55' 39" | 1° 42' 25"E |
| Strathspey Satellite Wells | 60° 56' 32.18" | 1° 41' 29.67"E |
| Nelson Oil Field Template | 57° 39' 46.35" | 1° 8' 44.02"E |
| Lyell A Cluster Manifold | 60° 53' 57.51" | 1° 16' 17.49"E |
| Alwyn Extension Wells | 60° 45' 46.28" | 1° 42' 53.85"E |
| Scott WI Manifold West | 58° 17' 5.08" | 0° 10' 17.91"E |
| Scott WI Manifold South | 58° 15' 29.41" | 0° 12' 24"E |
| Scott WI Manifold East | 58° 16' 54.92" | 0° 15' 25.13"E |
| Scott Production Cluster East | 58° 16' 54.43" | 0° 14' 8.53"E |
| F6. . . | F6. . . | F6. . . |
| F6. . . | F6. . . | F6. . . |
| F6. . . | F6. . . | F6. . . |
| Hyde 48/6 Subsea Template | 53° 48' 26.3" | 1° 1' 43.3"E |
| F12. . . | F12. . . | F12. . . |
| Ellon Development Subsea Wellhead | 60° 35' 52.71" | 1° 48' 26.65"E |
| Nelson Subsea Manifold | 57° 37' 0" | 1° 11' 30"E |
| Gryphon Subsea Well Cluster | 59° 21' 4.1" | 1° 33' 9.9"E |
| Anglia West Subsea Structure | 53° 22' 22.11" | 1° 34' 50.2"E |
| Phillips Ann Subsea Installation | 53° 42' 55" | 2° 3' 22"E |
| F13. . . | F13. . . | F13. . . |
| Johnston Field Development | 54° 2' 47" | 1° 12' 27"E |
| Hudson Field Development Manifold | 61° 15' 10" | 0° 44' 8.1"E |
| Wellhead L1 and L2 | 61° 15' 38.9" | 0° 42' 33.1"E |
| Fulmar FSU/SALM | 56° 27' 44" | 2° 7' 14"E |
| Pelican Drilling Centre | 61° 2' 2.06" | 1° 7' 44.51"E |
| Victor North West 49/17-JM | 53° 21' 3.22" | 2° 17' 43.46"E |
| Jupiter/Callisto Wellhead | 53° 14' 31.92" | 2° 23' 16.37"E |
| Cyrus Manifold | 58° 6' 9.16" | 1° 26' 47.71"E |
| Cyrus Wellhead 16/28-C1 | 58° 6' 9.63" | 1° 26' 46.76"E |
| Cyrus Wellhead 16/28-C2 | 58° 6' 9.87" | 1° 26' 47.04"E |
| F14. . . | F14. . . | F14. . . |
| F15. . . | F15. . . | F15. . . |
| Birch Field Manifold | 58° 34' 52" | 1° 15' 40"E |
| Nevis Field Wells | 59° 31' 56.07" | 1° 24' 25.45"E |
| KT Well | 59° 34' 4.43" | 1° 28' 51.8"E |
| South Scott Manifold | 58° 14' 54.91" | 0° 10' 45.51"E |
| Foinaven Drilling Centre 1 | 60° 18' 39.79" | 4° 20' 16"W |
| Foinaven Drilling Centre 2A | 60° 20' 37.45" | 4° 14' 43.31"W |
| Foinaven DC2 West WI | 60° 20' 55.57" | 4° 17' 39.07"W |
| Foinaven DC2 East WI | 60° 18' 43.08" | 4° 13' 5.87"W |
| Liverpool Bay Pipeline End Manifold | 53° 41' 0.11" | 3° 32' 42.97"W |
| Thelma Subsea Installation | 58° 22' 28.32" | 1° 18' 37.58"E |
| F16. . . | F16. . . | F16. . . |
| Joanne Subsea Facility | 56° 41' 47.4" | 2° 14' 56.4"E |
| Alison Subsea Facility | 53° 30' 33.21" | 2° 10' 11.82"E |
| Teal Oil Producer | 57° 17' 4.6" | 0° 50' 55.7"E |
| Teal Water Injection Centre | 57° 17' 19.6" | 0° 49' 36"E |
| Teal South Drilling Centre | 57° 13' 50.8" | 0° 49' 5.8"E |
| Guillemot A Drilling Centre | 57° 10' 6.1" | 0° 49' 44"E |
| Dawn Subsea Installation | 53° 7' 48.31" | 1° 41' 38.36"E |
| South Magnus WI Well | 61° 32' 23.99" | 1° 15' 42.77"E |
| South Magnus Production Well | 61° 34' 4.78" | 1° 15' 44.21"E |
| WI Tree/Flowbase | 58° 12' 21.57" | 0° 16' 47.32"E |
| Central Telford Manifold | 58° 13' 4.27" | 0° 14' 57.69"E |
| Marmion/West Telford Manifold | 58° 14' 19.44" | 0° 12' 31.09"E |
| East Drill Centre | 58° 18' 6.51" | 0° 45' 18.81"E |
| West Drill Centre | 58° 19' 26.91" | 0° 41' 52.86"E |
| Machar Wellhead | 57° 4' 52.2" | 2° 5' 6.69"E |
| Marnock Drilling Plate | 57° 17' 42.81" | 1° 39' 45.43"E |
| Mungo Template | 57° 22' 31.2" | 1° 59' 53.28"E |
| Umbilical distribution Assembly | 60° 17' 59.58" | 4° 9' 51.55"W |
| Esmond Subsea Barrier Valve | 54° 35' 10.93" | 1° 25' 43.98"E |
| Hewitt—Little Dotty Well | 53° 2' 51.9" | 1° 50' 42.5"E |
| Britannia—Template | 58° 2' 55.14" | 1° 8' 19.54"E |
| Britannia—Manifold | 58° 4' 27.29" | 0° 53' 35.8"E |
| F17. . . | F17. . . | F17. . . |
| Foinaven Gas Disposal Well | 60° 17' 25.24" | 4° 6' 59.26"W |
| F18. . . | F18. . . | F18. . . |
| F19. . . | F19. . . | F19. . . |
| F20. . . | F20. . . | F20. . . |
| F21. . . | F21. . . | F21. . . |
| F22. . . | F22. . . | F22. . . |
| Curlew D—Wellhead | 56° 43' 22.14" | 1° 18' 40.61"E |
| Gannet F—Manifold | 57° 5' 28.15" | 0° 57' 37.36"E |
Textual Amendments
F1Words in Sch. 1 substituted (10.11.2003) by The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(a)
F2Words in Sch. 1 omitted (6.7.2026) by virtue of The Offshore Installations (Safety Zones) Order 2026 (S.I. 2026/635), arts. 1(2), 3(2)(a)
F3Words in Sch. 1 omitted (6.7.2026) by virtue of The Offshore Installations (Safety Zones) Order 2026 (S.I. 2026/635), arts. 1(2), 3(2)(b)
F4Words in Sch. 1 omitted (30.7.2010) by virtue of The Offshore Installations (Safety Zones) (No.2) Order 2010 (S.I. 2010/1739), arts. 1, 3
F5Words in Sch. 1 omitted (29.3.2016) by virtue of The Offshore Installations (Safety Zones) Order 2016 (S.I. 2016/309), arts. 1(2), 3
F6Words in Sch. 1 omitted (26.3.1998) by virtue of The Offshore Installations (Safety Zones) Order 1998 (S.I. 1998/608), arts. 1, 3
F7Words in Sch. 1 omitted (22.8.2011) by virtue of The Offshore Installations (Safety Zones) (No.2) Order 2011 (S.I. 2011/1825), arts. 1, 4
F8Words in Sch. 1 omitted (21.10.2002) by virtue of The Offshore Installations (Safety Zones) (No. 2)Order 2002 (S.I. 2002/2467), arts. 1, 3
F9Words in Sch. 1 substituted (10.11.2003) by The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(b)(i)
F10Words in Sch. 1 substituted (10.11.2003) by The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(b)(ii)
F11Words in Sch. 1 omitted (31.3.1999) by virtue of The Offshore Installations (Safety Zones) Order 1999 (S.I. 1999/547), arts. 1, 3(1)
F12Words in Sch. 1 omitted (8.8.2023) by virtue of The Offshore Installations (Safety Zones) Order 2023 (S.I. 2023/838), arts. 1(2), 3(2)
F13Words in Sch. 1 omitted (31.1.2007) by virtue of The Offshore Installations (Safety Zones) Order 2007 (S.I. 2007/41), arts. 1, 3
F14Words in Sch. 1 omitted (30.9.2015) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2015 (S.I. 2015/1673), arts. 1(2), 3(a)
F15Words in Sch. 1 omitted (30.9.2015) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2015 (S.I. 2015/1673), arts. 1(2), 3(b)
F16Words in Sch. 1 omitted (10.4.2017) by virtue of The Offshore Installations (Safety Zones) (No. 2) Order 2017 (S.I. 2017/458), arts. 1, 3 (with art. 2)
F17Words in Sch. 1 omitted (30.9.2015) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2015 (S.I. 2015/1673), arts. 1(2), 3(c)
F18Words in Sch. 1 omitted (10.11.2003) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(c)(i)
F19Words in Sch. 1 omitted (10.11.2003) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(c)(ii)
F20Words in Sch. 1 omitted (10.11.2003) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2003 (S.I. 2003/2743), arts. 1, 3(1)(c)(iii)
F21Words in Sch. 1 omitted (20.7.2022) by virtue of The Offshore Installations (Safety Zones) (No. 2) Order 2022 (S.I. 2022/740), arts. 1(2), 3(2)
F22Words in Sch. 1 omitted (24.12.2024) by virtue of The Offshore Installations (Safety Zones) (No. 2) Order 2024 (S.I. 2024/1278), arts. 1(2), 3(2)
Article 3
Commencement Information
I5Sch. 2 in force at 31.3.1997, see art. 1
| Orders revoked | References |
|---|---|
| The Offshore Installations (Safety Zones) (No. 48) Order 1987 | S.I.1987/1332 |
| The Offshore Installations (Safety Zones) (No. 70) Order 1987 | S.I.1987/2016 |
| The Offshore Installations (Safety Zones) (No. 71) Order 1987 | S.I.1987/2017 |
| The Offshore Installations (Safety Zones) Order 1988 | S.I.1988/1080 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1988 | S.I.1988/1081 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1988 | S.I.1988/1481 |
| The Offshore Installations (Safety Zones) (Amendment) Order 1988 | S.I.1988/1482 |
| The Offshore Installations (Safety Zones) Order 1989 | S.I.1989/508 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1989 | S.I.1989/887 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1989 | S.I.1989/1851 |
| The Offshore Installations (Safety Zones) Order 1990 | S.I.1990/216 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1990 | S.I.1990/896 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1990 | S.I.1990/897 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1990 | S.I.1990/973 |
| The Offshore Installations (Safety Zones) (No. 5) Order 1990 | S.I.1990/1106 |
| The Offshore Installations (Safety Zones) (No. 6) Order 1990 | S.I.1990/2117 |
| The Offshore Installations (Safety Zones) Order 1991 | S.I.1991/207 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1991 | S.I.1991/650 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1991 | S.I.1991/1922 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1991 | S.I.1991/2669 |
| The Offshore Installations (Safety Zones) Order 1992 | S.I.1992/79 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1992 | S.I.1992/1429 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1992 | S.I.1992/2314 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1992 | S.I.1992/2852 |
| The Offshore Installations (Safety Zones) Order 1993 | S.I.1993/1406 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1993 | S.I.1993/1664 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1993 | S.I.1993/1893 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1993 | S.I.1993/2479 |
| The Offshore Installations (Safety Zones) Order 1994 | S.I.1994/372 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1994 | S.I.1994/1836 |
| The Offshore Installations (Safety Zones) Order 1995 | S.I.1995/494 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1995 | S.I.1995/1956 |
| The Offshore Installations (Safety Zones) (No. 5) Order 1995 | S.I.1995/2363 |
| The Offshore Installations (Safety Zones) (No. 6) Order 1995 | S.I.1995/2795 |
| The Offshore Installations (Safety Zones) Order 1996 | S.I.1996/97 |
| The Offshore Installations (Safety Zones) (No. 2) Order 1996 | S.I.1996/850 |
| The Offshore Installations (Safety Zones) (No. 3) Order 1996 | S.I.1996/1194 |
| The Offshore Installations (Safety Zones) (No. 4) Order 1996 | S.I.1996/1492 |
| The Offshore Installations (Safety Zones) (No. 5) Order 1996 | S.I.1996/1862 |
| The Offshore Installations (Safety Zones) (No. 6) Order 1996 | S.I.1996/2304 |
| The Offshore Installations (Safety Zones) (No. 7) Order 1996 | S.I.1996/2859 |
| The Offshore Installations (Safety Zones) (No. 8) Order 1996 | S.I.1996/3139 |
(This note is not part of the order)
This order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the specified point, around each installation specified in Schedule 1 to this order and stationed in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29)).
Vessels (which for this purpose include hovercraft, submersible apparatus and installations in transit) are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently the Offshore Installations (Safety Zones) Regulations 1987 (S.I. 1987/1331)).
The order revokes the orders listed in Schedule 2 which had previously established safety zones around all the installations specified in Schedule 1, except the new ones now established around Curlew B-Wellhead, Curlew D-Wellhead and Gannet F-Manifold, and had established twenty-four other safety zones, no longer required, around other installations.