Search Legislation

The Town and Country Planning (General Permitted Development) Order 1995

 Help about what version

What Version

 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made).

Class C Air navigation development near an airport

C.    Permitted development

The carrying out on operational land outside but within 8 kilometres of the perimeter of a relevant airport, by a relevant airport operator or its agent, of development in connection with—

(a)the provision of air traffic control services,

(b)the navigation of aircraft using the airport, or

(c)the monitoring of the movement of aircraft using the airport.

C.1    Development not permitted

Development is not permitted by Class C if—

(a)any building erected would be used for a purpose other than housing equipment used in connection with the provision of air traffic control services, with assisting the navigation of aircraft, or with monitoring the movement of aircraft using the airport;

(b)any building erected would exceed a height of 4 metres;

(c)it would consist of the installation or erection of any radar or radio mast, antenna or other apparatus which would exceed 15 metres in height, or, where an existing mast, antenna or apparatus is replaced, the height of that mast, antenna or apparatus, if greater.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Schedule

The Whole Schedule you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Schedule as a PDF

The Whole Schedule you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?