- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Regulation 6(1)
1. Three sample meters having such basic current and reference voltage as the Director, upon examination of the tables referred to in paragraph 2 below, may select.
2. Tables of—
(a)all voltage and current windings (that is to say, number of turns, size of conductors and insulation); and
(b)meter constants and torques for all voltage and current values.
3. A drawing of the relevant instrument, showing the position intended for the seal of EC initial verification, and drawings of the following components: base, handle and fixing points; cover; terminal plate and cover; driving element; windings and air gaps; breaking element and method of adjustment; register; rotor; upper and lower rotor bearings; temperature compensating devices; overload compensating devices; inductive load adjustment; light load adjustment; auxiliary circuits; and rating plate.
4. A diagram of internal and external connections (including auxiliary circuits) showing the phase sequence.
5. A detailed description of the construction of the instrument and of its main components, and a description of the position where the seal of EC initial verification is intended to be affixed.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: