1990 No. 1598
The Dartford—Thurrock Crossing (Amendment) Regulations 1990
Made
Laid before Parliament
Coming into force
1
These Regulations may be cited as the Dartford—Thurrock Crossing (Amendment) Regulations 1990 and shall come into force on 1st September 1990.
2
The Dartford—Thurrock Crossing Regulations 19893 shall be amended in accordance with the provisions of these Regulations.
3
In regulation 1 (citation, commencement and interpretation) there shall be inserted, after paragraph (2)(b), the following sub-paragraph—
bb
“large break-down vehicle” means a break-down vehicle with an unladen weight in excess of 4,000 kg;
4
In regulation 5(1), for the table there set out, there shall be substituted the following table—
Time of Commencement of Passage
Charge
Overall width
Greater than 2.75 metres but less than or equal to 6.1 metres
Passage commencing after 06.00 hours and before 22.00 hours
£30
Greater than 2.75 metres but less than or equal to 6.1 metres
Passage commencing on or after 22.00 hours and on or before 06.00 hours
£15
Greater than 6.1 metres
At any time
£137
Overall length
Greater than 18.3 metres but less than or equal to 27.4 metres
Passage commencing after 06.00 hours and before 22.00 hours
£30
Greater than 18.3 metres but less than or equal to 27.4 metres
Passage commencing on or after 22.00 hours and on or before 06.00 hours
£15
Greater than 27.4 metres
At any time
£137
5
In regulation 12(1), for the table there set out, there shall be substituted the following table—
(1)
(2)
Minimum Charge
Additional Charge
Motor cycles and combinations
£7
£3
Vehicles with two axles—if a tow is given by a large break-down vehicle
£42
£14
in any other case
£24
£8
Vehicles with more than two axles
£84
£28
Signed by authority of the Secretary of State for Transport.
(This note is not part of the Regulations)