xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Northern Ireland Budget Act 2023

2023 CHAPTER 3

An Act to authorise the use for the public service of certain resources for the years ending 31 March 2023 and 2024 (including, for the year ending 31 March 2023, income); to authorise the issue out of the Consolidated Fund of Northern Ireland of certain sums for the service of those years; to authorise the use of those sums for specified purposes; to authorise the Department of Finance in Northern Ireland to borrow on the credit of those sums; and to repeal provisions superseded by this Act.

[8th February 2023]

Be it enacted by the King’s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:—

Year ending 31 March 2023U.K.

1Use of resourcesU.K.

(1)For the purposes of section 6(1) of the 2001 Act, this section and section 2 authorise the use of resources in the year ending 31 March 2023.

(2)In that year, the use of resources by the persons mentioned in subsection (3) is authorised up to the amount of £26,656,975,000.

(3)The persons are—

(a)the Northern Ireland departments;

(b)the Food Standards Agency;

(c)the Northern Ireland Assembly Commission;

(d)the Northern Ireland Audit Office;

(e)the Northern Ireland Authority for Utility Regulation;

(f)the Northern Ireland Public Services Ombudsman;

(g)the Public Prosecution Service for Northern Ireland.

(4)Of the amount authorised by subsection (2)

(a)£24,242,977,000 is authorised for use for current purposes, and

(b)£2,413,998,000 is authorised for use for capital purposes.

Commencement Information

I1S. 1 coming into force at Royal Assent (with effect in accordance with s. 7)

2Limits on use of resourcesU.K.

(1)Schedule 1 contains estimates relating to the persons mentioned in section 1(3) for the year ending 31 March 2023 (“Schedule 1 estimates”).

(2)In the year ending 31 March 2023, a person mentioned in section 1(3) may use resources in accordance with subsections (3) to (7) and the Schedule 1 estimate relating to that person.

(3)The person may use resources for the purposes specified in Part 2 of the estimate; but this is subject to subsections (4) to (7).

(4)Where Part 1 of the estimate authorises the use of net resources for current purposes, the person—

(a)may use resources up to the amount so authorised for current purposes;

(b)must not use those resources for capital purposes.

(5)Where Part 1 of the estimate authorises the use of net resources for capital purposes, the person—

(a)may use resources up to the amount so authorised for capital purposes;

(b)must not use those resources for current purposes.

(6)Where Part 1 of the estimate authorises the use of net resources in relation to a category of expenditure, the person—

(a)may use resources up to the amount so authorised for a purpose identified in the estimate as falling within that category of expenditure;

(b)must not use those resources for any other purpose.

(7)The categories of expenditure are—

(a)expenditure subject to a departmental expenditure limit;

(b)annually managed expenditure;

(c)non-budget expenditure.

(8)The authorisations in this section and in section 1 supersede those made—

(a)by section 6 of the Budget Act (Northern Ireland) 2022 (c. 6 (N.I.)), and

(b)under section 7 of the 2001 Act for the year ending 31 March 2023,

which total £23,357,015,000.

Commencement Information

I2S. 2 coming into force at Royal Assent (with effect in accordance with s. 7)

3Issue of sum out of the Consolidated FundU.K.

The Department may issue out of the Consolidated Fund and apply to the service of the year ending 31 March 2023 the sum of £21,487,341,000.

Commencement Information

I3S. 3 coming into force at Royal Assent (with effect in accordance with s. 7)

4Use of sum issued out of the Consolidated FundU.K.

(1)The sum that the Department may issue out of the Consolidated Fund under section 3 may be used for the year ending 31 March 2023 in accordance with subsection (2).

(2)The sum specified in Part 1 of a Schedule 1 estimate as a money requirement may be used by the person to whom the estimate relates for the purposes specified in Part 2 of the estimate.

(3)The authorisations in this section and in section 3 supersede the authorisations and appropriations made—

(a)by section 4 of the Budget Act (Northern Ireland) 2022 (c. 6 (N.I.)), and

(b)under section 59 of the Northern Ireland Act 1998 for the year ending 31 March 2023,

which total £20,353,974,000.

Commencement Information

I4S. 4 coming into force at Royal Assent (with effect in accordance with s. 7)

5Power to borrowU.K.

(1)The Department may borrow on the credit of the sum specified in section 3 any sum or sums not exceeding in total £10,743,671,000.

(2)Any money so borrowed is to be repaid along with any interest due on it out of the Consolidated Fund not later than 31 March 2023.

Commencement Information

I5S. 5 coming into force at Royal Assent (with effect in accordance with s. 7)

6Use of incomeU.K.

(1)In the year ending 31 March 2023, a person mentioned in section 1(3) may use income from a source specified in Part 3 of the Schedule 1 estimate relating to that person for a purpose specified in Part 2 of the estimate; but this is subject to subsections (2) to (5).

(2)Where the income is received in connection with current purposes, the person—

(a)may use the income for current purposes;

(b)must not use the income for capital purposes.

(3)Where the income is received in connection with capital purposes, the person—

(a)may use the income for capital purposes;

(b)must not use the income for current purposes.

(4)Where the source of income is identified in the estimate as relating to a category of expenditure, the person—

(a)may use income from that source for a purpose identified in the estimate as falling within that category;

(b)must not use income from that source for any other purpose.

(5)The categories of expenditure are the categories set out in section 2(7).

(6)Where, in the year ending 31 March 2023, money is received by a person mentioned in section 1(3)

(a)the money may be used in accordance with this section or with any other statutory provision that provides for the person to deal with income in a particular manner, and

(b)in so far as not so used, it must be paid into the Consolidated Fund.

Commencement Information

I6S. 6 coming into force at Royal Assent (with effect in accordance with s. 7)

7Operation from the beginning of the year ending 31 March 2023U.K.

Sections 1 to 6 are to be treated as having had effect from the beginning of 1 April 2022.

Commencement Information

I7S. 7 coming into force at Royal Assent

Year ending 31 March 2024U.K.

8Use of resourcesU.K.

(1)For the purposes of section 6(1) of the 2001 Act, this section and section 9 authorise the use of resources in the year ending 31 March 2024.

(2)In that year, the use of resources by the persons mentioned in subsection (3) is authorised up to the amount of £17,404,266,000.

(3)The persons are—

(a)the Northern Ireland departments;

(b)the Food Standards Agency;

(c)the Northern Ireland Assembly Commission;

(d)the Northern Ireland Audit Office;

(e)the Northern Ireland Authority for Utility Regulation;

(f)the Northern Ireland Public Services Ombudsman;

(g)the Public Prosecution Service for Northern Ireland.

(4)Of the amount authorised by subsection (2)

(a)£15,835,528,000 is authorised for use for current purposes, and

(b)£1,568,738,000 is authorised for use for capital purposes.

Commencement Information

I8S. 8 coming into force at Royal Assent

9Limits on use of resourcesU.K.

(1)Schedule 2 contains estimates relating to the persons mentioned in section 8(3) for the year ending 31 March 2024 (“Schedule 2 estimates”).

(2)In the year ending 31 March 2024, a person mentioned in section 8(3) may use resources in accordance with subsections (3) to (7) and the Schedule 2 estimate relating to that person.

(3)The person may use resources for the purposes specified in Part 2 of the estimate; but this is subject to subsections (4) to (7).

(4)Where Part 1 of the estimate authorises the use of net resources for current purposes, the person—

(a)may use resources up to the amount so authorised for current purposes;

(b)must not use those resources for capital purposes.

(5)Where Part 1 of the estimate authorises the use of net resources for capital purposes, the person—

(a)may use resources up to the amount so authorised for capital purposes;

(b)must not use those resources for current purposes.

(6)Where Part 1 of the estimate authorises the use of net resources in relation to a category of expenditure, the person—

(a)may use resources up to the amount so authorised for a purpose identified in the estimate as falling within that category of expenditure;

(b)must not use those resources for any other purpose.

(7)The categories of expenditure are—

(a)expenditure subject to a departmental expenditure limit;

(b)annually managed expenditure;

(c)non-budget expenditure.

Commencement Information

I9S. 9 coming into force at Royal Assent

10Issue of sum out of the Consolidated FundU.K.

The Department may issue out of the Consolidated Fund and apply to the service of the year ending 31 March 2024 the sum of £14,154,737,000.

Commencement Information

I10S. 10 coming into force at Royal Assent

11Use of sum issued out of the Consolidated FundU.K.

(1)The sum that the Department may issue out of the Consolidated Fund under section 10 may be used for the year ending 31 March 2024 in accordance with subsection (2).

(2)The sum specified in Part 1 of a Schedule 2 estimate as a money requirement may be used by the person to whom the estimate relates for the purposes specified in Part 2 of the estimate.

Commencement Information

I11S. 11 coming into force at Royal Assent

F112Power to borrowU.K.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

SupplementaryU.K.

13Act to take effect as if it were a Budget Act of the AssemblyU.K.

(1)The authorisations in this Act, and the limits set by it, take effect as if they were authorisations in, and limits set by, an Act of the Northern Ireland Assembly; and accordingly any reference in a statutory provision to a Budget Act of the Assembly includes a reference to this Act.

(2)The 2001 Act applies in respect of the year ending 31 March 2023 with the following modifications—

(a)section 6(4) has effect as if for “if an estimate is approved by the Assembly for that body or person in respect of each financial year” there were substituted “if an estimate is laid before Parliament for that body or person in respect of the year ending 31 March 2023”;

(b)section 9(1) has effect as if for “for which an estimate is approved by the Assembly in respect of a financial year” there were substituted “for which an estimate is laid before Parliament in respect of the year ending 31 March 2023”;

(c)section 13(1) has effect as if for “where an estimate is approved by the Assembly for any body or person in respect of any financial year” there were substituted “where an estimate is laid before Parliament for any body or person in respect of the year ending 31 March 2023”.

(3)For the purposes of preparing accounts for the year ending 31 March 2023 for—

(a)the Northern Ireland Audit Office (as required by Article 6(3) of the Audit (Northern Ireland) Order 1987 (S.I. 1987/460 (N.I. 5)), or

(b)the office of the Northern Ireland Public Services Ombudsman (as required by paragraph 19 of Schedule 1 to the Public Services Ombudsman Act (Northern Ireland) 2016 (c. 4 (N.I.))),

any estimate of the use of resources for that year that is laid before Parliament is to be treated as if it had been laid before the Northern Ireland Assembly under Article 6(2) of that Order or (as the case may be) under paragraph 18 of Schedule 1 to that Act.

Commencement Information

I12S. 13 coming into force at Royal Assent

14Repeal of provisions superseded by this ActU.K.

Sections 4 to 6 of, and Schedules 3 and 4 to, the Budget Act (Northern Ireland) 2022 (c. 6 (N.I.)) are omitted.

Commencement Information

I13S. 14 coming into force at Royal Assent

15InterpretationU.K.

In this Act—

Commencement Information

I14S. 15 coming into force at Royal Assent

16Short titleU.K.

This Act may be cited as the Northern Ireland Budget Act 2023.

Commencement Information

I15S. 16 coming into force at Royal Assent

Schedules

Sections 2, 4 and 6

Schedule 1U.K.Estimates for the year ending 31 March 2023

Commencement Information

I16Sch. 1 coming into force at Royal Assent (with effect in accordance with s. 7)

DEPARTMENT FOR AGRICULTURE, ENVIRONMENT AND RURAL AFFAIRS ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes596,248,000
Net resources for capital purposes82,447,000
Annually managed expenditure
Net resources for current purposes16,092,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement677,958,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

DEPARTMENT FOR COMMUNITIES ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes857,228,000
Net resources for capital purposes276,660,000
Annually managed expenditure
Net resources for current purposes4,421,843,000
Net resources for capital purposes38,719,000
Non-budget expenditure
Net resources for current purposes135,052,000
Net resources for capital purposes-
Money
Money requirement5,716,897,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT FOR THE ECONOMY ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes1,396,351,000
Net resources for capital purposes244,571,000
Annually managed expenditure
Net resources for current purposes(206,037,000)
Net resources for capital purposes335,687,000
Non-budget expenditure
Net resources for current purposes2,079,000
Net resources for capital purposes-
Money
Money requirement1,490,428,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget incomeU.K.

DEPARTMENT OF EDUCATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes2,650,242,000
Net resources for capital purposes217,167,000
Annually managed expenditure
Net resources for current purposes282,301,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement2,929,383,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF EDUCATION — TEACHERS' SUPERANNUATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes915,691,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes(2,079,000)
Net resources for capital purposes-
Money
Money requirement131,442,000

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Annually managed expenditureU.K.
Non-budget incomeU.K.

DEPARTMENT OF FINANCE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes242,614,000
Net resources for capital purposes32,337,000
Annually managed expenditure
Net resources for current purposes10,484,000
Net resources for capital purposes12,663,000
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement249,959,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

DEPARTMENT OF FINANCE — SUPERANNUATION AND OTHER ALLOWANCES ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes696,500,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement90,000,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF HEALTH ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes6,627,291,000
Net resources for capital purposes358,084,000
Annually managed expenditure
Net resources for current purposes459,404,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement7,189,137,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

DEPARTMENT OF HEALTH — HEALTH AND SOCIAL CARE PENSION SCHEME ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes2,038,789,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement(169,811,000)

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Annually managed expenditureU.K.

DEPARTMENT FOR INFRASTRUCTURE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes404,013,000
Net resources for capital purposes498,472,000
Annually managed expenditure
Net resources for current purposes174,500,000
Net resources for capital purposes1,161,000
Non-budget expenditure
Net resources for current purposes288,620,000
Net resources for capital purposes170,000,000
Money
Money requirement1,417,677,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.
Non-budget incomeU.K.

DEPARTMENT OF JUSTICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes1,261,805,000
Net resources for capital purposes77,959,000
Annually managed expenditure
Net resources for current purposes515,328,000
Net resources for capital purposes758,000
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement1,432,816,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

DEPARTMENT OF JUSTICE — NORTHERN IRELAND JUDICIAL PENSION SCHEME ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes300,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement500,000

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

THE EXECUTIVE OFFICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes156,483,000
Net resources for capital purposes60,897,000
Annually managed expenditure
Net resources for current purposes178,171,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement209,386,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

FOOD STANDARDS AGENCY ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes14,536,000
Net resources for capital purposes534,000
Annually managed expenditure
Net resources for current purposes300,000
Net resources for capital purposes135,000
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement14,606,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

NORTHERN IRELAND ASSEMBLY COMMISSION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes50,757,000
Net resources for capital purposes2,925,000
Annually managed expenditure
Net resources for current purposes2,200,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement50,514,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

NORTHERN IRELAND AUDIT OFFICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes10,315,000
Net resources for capital purposes2,290,000
Annually managed expenditure
Net resources for current purposes-
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement10,920,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

THE NORTHERN IRELAND AUTHORITY FOR UTILITY REGULATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes318,000
Net resources for capital purposes40,000
Annually managed expenditure
Net resources for current purposes-
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement962,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Non-budget expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

NORTHERN IRELAND PUBLIC SERVICES OMBUDSMAN ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes4,035,000
Net resources for capital purposes57,000
Annually managed expenditure
Net resources for current purposes(45,000)
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement3,972,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

PUBLIC PROSECUTION SERVICE FOR NORTHERN IRELAND ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTU.K.

(£)
Departmental expenditure limit
Net resources for current purposes40,274,000
Net resources for capital purposes435,000
Annually managed expenditure
Net resources for current purposes974,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement40,595,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PART 3: INCOMEU.K.

Departmental expenditure limitU.K.

Sections 9 and 11

Schedule 2U.K.Estimates for the year ending 31 March 2024

Commencement Information

I17Sch. 2 coming into force at Royal Assent

DEPARTMENT FOR AGRICULTURE, ENVIRONMENT AND RURAL AFFAIRS ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes387,562,000
Net resources for capital purposes53,591,000
Annually managed expenditure
Net resources for current purposes10,460,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement440,673,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT FOR COMMUNITIES ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes557,199,000
Net resources for capital purposes179,829,000
Annually managed expenditure
Net resources for current purposes2,874,198,000
Net resources for capital purposes25,168,000
Non-budget expenditure
Net resources for current purposes87,784,000
Net resources for capital purposes-
Money
Money requirement3,715,984,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

DEPARTMENT FOR THE ECONOMY ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes907,629,000
Net resources for capital purposes158,972,000
Annually managed expenditure
Net resources for current purposes(133,925,000)
Net resources for capital purposes218,197,000
Non-budget expenditure
Net resources for current purposes1,352,000
Net resources for capital purposes-
Money
Money requirement968,779,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

DEPARTMENT OF EDUCATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes1,722,658,000
Net resources for capital purposes141,159,000
Annually managed expenditure
Net resources for current purposes183,496,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement1,904,099,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF EDUCATION — TEACHERS' SUPERANNUATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes595,200,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes(1,352,000)
Net resources for capital purposes-
Money
Money requirement85,438,000

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

DEPARTMENT OF FINANCE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes157,700,000
Net resources for capital purposes21,020,000
Annually managed expenditure
Net resources for current purposes6,815,000
Net resources for capital purposes8,231,000
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement162,474,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF FINANCE — SUPERANNUATION AND OTHER ALLOWANCES ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes452,725,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement58,500,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF HEALTH ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes4,307,740,000
Net resources for capital purposes232,755,000
Annually managed expenditure
Net resources for current purposes298,613,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement4,672,940,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF HEALTH — HEALTH AND SOCIAL CARE PENSION SCHEME ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes1,325,213,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement-

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

DEPARTMENT FOR INFRASTRUCTURE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes262,609,000
Net resources for capital purposes324,007,000
Annually managed expenditure
Net resources for current purposes113,425,000
Net resources for capital purposes755,000
Non-budget expenditure
Net resources for current purposes265,183,000
Net resources for capital purposes110,500,000
Money
Money requirement999,071,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.
Non-budget expenditureU.K.

DEPARTMENT OF JUSTICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes820,174,000
Net resources for capital purposes50,674,000
Annually managed expenditure
Net resources for current purposes334,964,000
Net resources for capital purposes493,000
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement931,331,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

DEPARTMENT OF JUSTICE — NORTHERN IRELAND JUDICIAL PENSION SCHEME ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes-
Net resources for capital purposes-
Annually managed expenditure
Net resources for current purposes195,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement325,000

PART 2: EXPENDITUREU.K.

Annually managed expenditureU.K.

THE EXECUTIVE OFFICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes101,714,000
Net resources for capital purposes39,584,000
Annually managed expenditure
Net resources for current purposes115,812,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement136,101,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

FOOD STANDARDS AGENCY ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes9,449,000
Net resources for capital purposes65,000
Annually managed expenditure
Net resources for current purposes195,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement9,494,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

NORTHERN IRELAND ASSEMBLY COMMISSION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes32,993,000
Net resources for capital purposes1,902,000
Annually managed expenditure
Net resources for current purposes1,430,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement32,835,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

NORTHERN IRELAND AUDIT OFFICE ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes6,705,000
Net resources for capital purposes1,489,000
Annually managed expenditure
Net resources for current purposes-
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement7,098,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.

THE NORTHERN IRELAND AUTHORITY FOR UTILITY REGULATION ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes207,000
Net resources for capital purposes26,000
Annually managed expenditure
Net resources for current purposes-
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement626,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Non-budget expenditureU.K.

NORTHERN IRELAND PUBLIC SERVICES OMBUDSMAN ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTSU.K.

(£)
Departmental expenditure limit
Net resources for current purposes2,623,000
Net resources for capital purposes38,000
Annually managed expenditure
Net resources for current purposes(30,000)
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement2,582,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.

PUBLIC PROSECUTION SERVICE FOR NORTHERN IRELAND ESTIMATEU.K.

PART 1: AUTHORISED AMOUNTU.K.

(£)
Departmental expenditure limit
Net resources for current purposes26,179,000
Net resources for capital purposes283,000
Annually managed expenditure
Net resources for current purposes634,000
Net resources for capital purposes-
Non-budget expenditure
Net resources for current purposes-
Net resources for capital purposes-
Money
Money requirement26,387,000

PART 2: EXPENDITUREU.K.

Departmental expenditure limitU.K.
Annually managed expenditureU.K.