SCHEDULES
SCHEDULE 13Right to require acquisition where time limit extended
1
(1)
If the Secretary of State makes an order under section 9(2), paragraphs 2 to 4 have effect as from the coming into force of the order.
(2)
Those paragraphs do not apply to any subsoil or under-surface of land required only for the construction of a work at a level more than 9 metres below the level of the surface of the land.