SCHEDULES
C1SCHEDULE 1Risk Management: Designation of Features
Annotations:
Modifications etc. (not altering text)
“Owner”
I13
In this Schedule “owner” in relation to anything which is or may be designated means—
a
the owner of the land on or in which the structure or feature is situated, or
b
if different, the person responsible for managing or controlling the structure or feature.
Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11