GREATER LONDON
London Borough of Camden15, 16 and 159The provision of car parking, a working site, and access for construction purposes.
1 to 13, 149 to 151 and 153 to 158Road improvement works and alterations to ventilation shafts.
37The provision of parking, a working site and access for construction purposes.
61The provision of parking and a working site.
79The provision of access for construction purposes.
63, 64, 74 and 76 to 78The provision of access for protective works.
87The provision of access for construction purposes and a working site.
182 and 189 to 192The provision of access for construction purposes.
194, 196 and 197The provision of access for construction purposes and permanent access for operational purposes.
198 to 200The provision of access for construction purposes and permanent access for operational purposes.
203 and 204The provision of access for construction purposes.
227The provision of access for construction purposes.
London Borough of Islington1 and 2Road improvement works.
331, 333, 334, 336 and 337The construction of a ventilation shaft, provision of permanent access thereto, and a working site.
786 and 1048The provision of electricity supply apparatus, access for construction purposes and permanent access for operational purposes.
782 and 1050The provision of access for construction purposes.
787 and 788The provision of access for construction purposes.
792 and 794The provision of protective works for public utilities’ apparatus.
London Borough of Hackney184 and 212The construction of a ventilation shaft, provision of permanent access thereto, and a working site.
773 to 777The provision of access for construction purposes and river bank strengthening works.
778 and 779The provision of barge moorings and barge loading facilities.
780The provision of barge loading facilities, spoil handling plant and machinery, a temporary shaft to Work No. 6, a working site and access for construction purposes.
781 and 782The provision of access for construction purposes.
London Borough of Newham1 and 2 (part)The provision of a working site, access for construction purposes and river bank strengthening works.
2 (part), 5 (part), 7 (part) and 8 (part)Alteration of overhead electric cables for electricity supply for construction purposes.
6The provision of access for construction purposes.
7 (part)The provision of a working site.
1, 4, 5 (part) and 8 (part)The provision of a working site, drainage works and river bank strengthening works and diversion of a telephone cable.
7 (part), 8 (part) and 11 (part)The provision of permanent access for operational purposes and diversion of a telephone cable.
8 (part) and 11 (part)The provision of a working site and permanent access for operational purposes.
8 (part)The provision of a working site.
8 (part), 12 (part), 14 and 15The provision of a working site, access for construction purposes and permanent access for operational purposes.
8 (part), 12 (part) and 13The provision of a working site and access for construction purposes.
519 to 521, 541 and 550The construction of a ventilation shaft, provision of permanent access thereto, and a working site.
1237 (part), 1244 and 1245The construction of a ventilation shaft, provision of permanent access thereto, and a working site.
1237 (part) and 1239The provision of a working site.
1253 and 1254 (part)The provision of barge moorings and barge loading facilities.
1254 (part)The provision of spoil handling plant and machinery, a conveyor, a working site and access for construction purposes.
1255 and 1260The provision of spoil handling plant and machinery, a conveyor and access for construction purposes.
1261The provision of spoil handling plant and machinery and a conveyor.
1262 and 1263 (part)The provision of access for construction purposes.
1263 (part) and 1264 (part)The provision of a working site and access for construction purposes.
1264 (part), 1265 and 1268The provision of a temporary footbridge and raising of the existing footbridge.
1269The provision of a working site and access for construction purposes.
London Borough of Waltham Forest1 and 3The provision of a working site and a temporary tunnel segments manufacturing facility, a maintenance and servicing depot, access and drainage works.
5 to 8 (part)The provision of drainage works.
8 (part) and 9The provision of access for construction of drainage works.
10The provision of access for construction of drainage works.
13 and 14The provision of drainage works.
London Borough of Barking and Dagenham161, 166 (part), 167 (part), 168 and 169The provision of underground electric cables for electricity supply apparatus.
195 and 199The provision of a turning head.
196 (part) and 197 (part)Reinstatement of railway sidings.
206 and 209Alterations to a proposed service bridge and the provision of access for construction purposes.
205The provision of access for construction purposes.
182Road improvement works.
195, 198 (part), 200 (part) to 202The provision of access for construction purposes.
198 (part)The provision of a working site and diversion of high pressure gas pipelines and other public utilities’ apparatus.
208 (part)The diversion of high pressure gas pipelines, a water pipe, overhead electric cables and other public utilities’ apparatus.
208 (part) and 210The diversion of high pressure gas pipelines, a water pipe, overhead electric cables and other public utilities’ apparatus.
221 to 226 (part)The diversion of gas pipelines, overhead electric cables and other public utilities’ apparatus and provision of a working site.
215 and 226 (part)The provision of accesses for construction purposes.
217 to 219The provision of access for construction purposes.
766 and 768The construction of a ventilation shaft, provision of permanent access thereto and a working site.
787, 788 and 790 to 793The provision of protective works for public utilities’ apparatus and access for construction purposes.
789 and 795 (part)The provision of a working site, access for construction purposes and permanent access for operational purposes.
795 (part) and 798The provision of electricity supply apparatus and permanent access for operational purposes.
797The provision of electricity supply apparatus and permanent access for operational purposes.
800, 801 and 831The provision of a working site, a conveyor, spoil handling plant and machinery, diversion of overhead electric cables and other public utilities’ apparatus and access for construction purposes and permanent access for operational purposes.
802The diversion of public utilities’ apparatus
803, 804, 808 and 809The provision of a working site, a turning head and access for construction purposes, diversion of public utilities’ apparatus and alteration of watercourses.
805 to 807The provision of access for construction purposes, diversion of overhead electric cables and other public utilities’ apparatus and alteration of watercourses.
814 and 815Provision of a turning head, alteration of watercourses and access for construction purposes.
829 and 830The provision of a conveyor, spoil handling plant and machinery, and access for construction purposes.
839The use of a jetty and provision of moorings in the River Thames.
841The diversion of public utilities’ apparatus.
818, 819, 821, 822, 842 to 845 and 846 (part)The diversion of overhead electric cables and other public utilities’ apparatus.
846 (part) and 847 to 849The diversion of overhead electric cables, high pressure gas pipelines and other public utilities’ apparatus.
London Borough of Havering1 to 4The provision of access for construction purposes.
7, 8, 10 (part), 11 and 12The provision of electricity supply apparatus, diversion of gas pipelines, overhead electric cables and other public utilities’ apparatus and provision of a working site.
10 (part) and 15, 16, 17 (part) and 18 (part)The diversion of high pressure gas pipelines, overhead electric cables and other public utilities’ apparatus.
10 (part)Connection of diverted high pressure gas pipelines to the existing network.
10 (part)The provision of a balancing pond, a working site, diversion of public utilities’ apparatus and permanent access for operational purposes.
19 to 22The construction of a turning head and provision of a footbridge.
17 (part) and 18 (part)The diversion of public utilities’ apparatus.
18 (part)The provision of permanent access for operational purposes.
25 to 30 and 45The provision of a working site and access for construction purposes.
18 (part), 50 (part), 51, and 61The provision of flood storage land at Rainham Creek.
50 (part) and 59 to 66The diversion of overhead electric cables.
55 and 56The provision of access for construction purposes.
18 (part), 52, 53, 79 (part), 80 (part) and 81 to 83The diversion of high pressure gas pipelines.
57, 72 and 73The construction of a turning head and provision of a new footbridge.
79 (part) and 80 (part)The provision of a working site, alteration of watercourses and diversion of overhead electric cables.
79 (part)The diversion of a high pressure gas pipeline and alteration of watercourses.
79 (part), 80 (part) and 84 (part)The diversion of a high pressure gas pipeline and provision of access for construction purposes.
84 (part) and 86 (part)The diversion of a high pressure gas pipeline, diversion of overhead electric cables, alteration of watercourses and landscaping.
85The provision of noise barriers.
87 (part), and 88The provision of access for construction purposes and permanent access for operational purposes.
87 (part), 89 and 90 (part)The provision of noise barriers and diversion of overhead electric cables.
84 (part) and 86 (part)The provision of landscaping, alteration of watercourses and permanent access for operational purposes.
86 (part)The alteration of watercourses.
90 (part) to 92The alteration of watercourses.
93 and 94The diversion of overhead electric cables, high pressure gas pipeines and other public utilities’ apparatus.
95 to 107The diversion of overhead electric cables.
108The diversion of public utilities’ apparatus.
109The diversion of overhead electric cables.
London Borough of Hammersmith and Fulham1, 2 and 8 to 12The provision of access for construction purposes and permanent access for operational purposes.
COUNTY OF ESSEX
Borough of Thurrock4 (part)The alteration of watercourses.
42 and 44The diversion of water and gas pipes.
39 and 45The provision of a working site and permanent access for operational purposes.
47 and 48 (part)The provision of landscaping.
46, 48 (part), 49 and 51The provision of a working site, landscaping and access for construction purposes.
48 (part) and 50The provision of access for construction purposes.
54 (part) and 55 (part)The provision of access for construction purposes.
52, 54 (part) and 55 (part) to 67The provision of access for construction purposes.
81, 83, 84, 89, 93, 94, 96 and 98The provision of a working site and access for construction purposes.
91 and 92The provision of a spoil disposal site.
100The construction of a ventilation shaft, provision of permanent access thereto and a working site.
101 and 102The provision of permanent access to a ventilation shaft and a working site.
104The diversion of overhead electric cables, provision of a working site and diversion of high pressure gas pipelines.
107The provision of a working site and permanent access for operational purposes.
108 and 155The provision of access for construction purposes and permanent access for operational purposes.
109 to 114The diversion of overhead electric cables.
120 and 126The provision of landscaping, diversion of overhead electric cables and provision of access for construction purposes.
128 and 129The diversion of overhead electric cables.
130The provision of landscaping, diversion of overhead electric cables and access for construction purposes.
131, 137 and 138The diversion of overhead electric cables.
141 and 142The provision of access to public utilities’ apparatus.
COUNTY OF KENT
Borough of Dartford, Parish of Swanscombe and Greenhithe1 and 2Use of working jetty and moorings in the River Thames.
2 (part) and 3 (part)The provision of working sites, spoil settlement lagoons, and spoil disposal.
2 (part)The provision of working sites, access for construction purposes and spoil disposal.
2 (part)The provision of a ventilation shaft and permanent access thereto, and a working site.
2 (part) and 11 (part)The provision of access for construction purposes.
11, 13 and 14The provision of access for construction purposes.
15 (part)The provision of access for construction purposes.
15 (part), 18, 19, 20, 24 and 25 (part)The provision of landscaping and access for construction purposes.
25 (part), 26 to 32 and 33 (part)The provision of an international and domestic passenger station with ancillary development and parking, diversion of overhead electric cables and provision of access for construction purposes.
21, 22, 23 and 25 (part)The provision of access for construction purposes.
25 (part)The diversion of overhead electric cables.
36 and 39The diversion of overhead electric cables and provision of a new access to Northfleet West Grid sub-station.
25 (part), 41 and 42The provision of access for construction purposes and diversion of overhead electric cables.
33The diversion of overhead electric cables.
Borough of Dartford, Parish of Southfleet11Alteration of overhead electric cables.
12 and 13The provision of access for construction purposes.
16, 19 and 32 (part)The diversion of underground electric cables.
26The provision of access for construction purposes.
19 (part)The provision of a working site, access for construction purposes and landscaping.
19 (part)The provision of a working site, and diversion of overhead electric cables.
74The provision of a working site, protective works and landscaping.
49 (parts)The provision of working sites.
53The provision of a working site and access for construction purposes.
49 (part) and 54The provision of access for construction purposes and permanent access to electrical apparatus.
44The provision of a balancing pond.
11, 14 and 31, 32 (part), 33 and 34The provision of a working site, access for construction purposes and diversion of overhead electric cables.
Borough of Dartford, Parish of Longfield and New Barn2, 5 and 6The provision of a balancing pond, landscaping, diversion of a high pressure gas pipeline and access for construction purposes.
9 and 12The diversion of a high pressure gas pipeline, provision of balancing ponds and access for construction purposes.
10The provision of a working site, protective works and landscaping.
Borough of Gravesham, Town of Gravesend1The provision of spoil settlement lagoons and spoil disposal.
2, 3 and 4The provision of access for construction purposes.
10The diversion of overhead electric cables.
12 to 14The provision of access for construction purposes.
15, 16 (part) and 17 (part)The diversion of overhead electric cables.
16 (part) and 17 (part)The diversion of overhead electric cables.
16 (part), 17 (part), 22 to 30 (part), 31 (part), 32 (part), 33 (part), 34 (part), 45 (part) and 46 (part)The provision of an international and domestic passenger station with ancillary development and parking and access for construction purposes.
31 (part), 32 (part), 33 (part), 34 (part), 35 and 36The diversion of overhead electric cables, landscaping and access for construction purposes.
16 (part), 45 (part) and 46 (part)The provision of access for construction purposes.
30 (part)The provision of protective works for a pumping station and access for construction purposes.
44, 47, 48, 62 and 63The provision of a working site, spoil disposal site and use of jetty and rail access.
30 (part)The provision of landscaping.
42The provision of access for construction purposes.
70 (part)The provision of a working site.
68The provision of access for construction purposes and permanent access for operational purposes.
30 (part), 31 (part), 70 (part) and 71 (part)The provision of access for construction purposes.
37 and 74 to 79The alteration of overhead electric cables, the provision of access for construction purposes, a working site and permanent access for operational purposes.
72The alteration of overhead electric cables.
78, 80 and 81The provision of access for work on overhead electric cables.
88, 89 (part) and 90 to 93The provision of a working site, a balancing pond, diversion of overhead electric cables and permanent access for operational purposes.
99, 100 (part) and 101 (part)The provision of a working site and landscaping.
93, 100 (part), 101 (part) and 102The provision of landscaping.
97The diversion of overhead electric cables and provision of landscaping.
105, 107 and 108The provision of a spoil disposal site and landscaping.
109 to 112The provision of pedestrian access, a footbridge, a working site and access for construction purposes.
District of Sevenoaks, Parish of Horton Kirby and South Darenth3, 4 and 5The provision of an electricity supply to an existing railway and permanent access for operational purposes.
2The diversion of a high pressure gas pipeline.
District of Sevenoaks, Parish of Swanley1The provision of electricity supply apparatus to existing railway.
Borough of Gravesham, Parish of Cobham1 to 6 and 7 (part)The provision of landscaping, a spoil disposal site and permanent access for operational purposes.
7 (part)The diversion of a high pressure gas pipeline.
9 (part)The provision of a spoil disposal site and diversion of overhead electric cables.
9 (part), 10, 11 and 12The provision of a balancing pond, landscaping, diversion of a high pressure gas pipeline, overhead electric cables, a connection to electricity supply apparatus and permanent access for operational purposes.
9 (part)The provision of electricity supply apparatus, connection to the electricity supply and permanent access for operational purposes.
23, 25, and 26The diversion of a water pipe.
28The provision of a working site and temporary road diversion.
34 (part)The diversion of a footpath.
34 (part) and 40 (part)Restoration of Repton Ponds.
40 (part)The provision of a working site.
42 (part)The provision of landscaping, diversion of a high pressure gas pipeline and permanent access for operational purposes.
42 (part) and 47The provision of a working site, access for construction purposes and permanent access for operational purposes.
42 (part)The provision of electricity supply apparatus.
48The diversion of pipelines, diversion of a footpath and landscaping.
Borough of Gravesham, Parish of Higham9 and 10The provision of access to a railhead to be used for construction purposes.
Borough of Gravesham, Parish of Shorne1 and 2Alteration of overhead electric cables.
18The provision of access to a railhead to be used for construction purposes.
City of Rochester Upon Medway, Parish of Cuxton4The diversion of pipelines, diversion of a footpath and landscaping.
5 and 6The provision of a working site, new woodland planting and landscaping.
11 to 18, 21, 22, 27 and 29The provision of a working site, permanent access for operational purposes to Medway Bridge (comprised in Work No. 13), access for construction purposes and landscaping.
City of Rochester Upon Medway, Town of Rochester8, 9, 10 and 12The provision of a spoil disposal site and access for construction purposes.
27 to 30 (part), 33 (part) and 39 (part)The provision of a working site and access to the River Medway for construction purposes.
18 to 22, 30 (part), 33 (part) and 39 (part)The provision of drainage works.
36, 49, 52, 53 and 62Access for construction purposes and permanent access for operational purposes.
39 (part)The provision of a working site, access for construction purposes and landscaping.
40, 45, 46, 48, 51 and 63The provision of a working site, landscaping, and protective works to water mains.
64 and 67The provision of landscaping.
65, 68, 69 and 71The provision of access for construction purposes.
Borough of Tonbridge and Malling, Parish of Wouldham1 and 2The provision of access for construction purposes.
11 and 13The provision of new woodland planting.
Borough of Tonbridge and Malling, Parish of Aylesford1, 4, 29 and 41The provision of a working site and access for construction purposes.
190 (part)The provision of a working site and landscaping.
190 (part) and 193 to 195The provision of a working site, access for construction purposes, landscaping, a balancing pond, diversion of overhead electric cables and permanent access for operational purposes.
190 (part)The provision of electricity supply apparatus and permanent access for operational purposes.
Borough of Maidstone, Parish of Boxley38 (part)The provision of electricity supply apparatus and permanent access for operational purposes.
37, 38 (part), 39, 40, 41 and 42 (part)The diversion of overhead electric cables and landscaping.
38 (part), 42 (part) and 43The provision of drainage works, landscaping and access for construction purposes.
44 (part)The provision of landscaping and diversion of overhead electric cables.
44 (part)The provision of a balancing pond and permanent access for operational purposes.
44 (part) and 45 to 49The provision of a working site, drainage works and landscaping.
52 (part) and 53The provision of landscaping and permanent access to a balancing pond and for operational purposes.
52 (part) and 54 (part)The provision of landscaping, footpath diversion and diversion of overhead electric cables.
54 (part) and 58The provision of drainage works.
60The provision of new woodland planting.
73, 74, 80, 81, 82, and 86 (part)The provision of a balancing pond, landscaping, diversion of a gas pipeline and permanent access for operational purposes.
86 (part)The provision of a working site and a footpath diversion.
86 (part), 88 and 89 (part)The provision of access for construction purposes.
89 (part) and 90The provision of new woodland planting.
Borough of Maidstone, Parish of Detling1The provision of a working site and access for construction purposes.
4 and 7 (part)The provision of access for construction purposes.
5, 7 (part) and 8The provision of a balancing pond, landscaping and permanent access for operational purposes.
14 and 17The provision of a balancing pond and permanent access for operational purposes.
Borough of Maidstone, Parish of Thurnham1 and 3The provision of new woodland planting.
5The provision of a working site and access for construction purposes.
8The provision of a balancing pond, diversion of a footpath, landscaping and permanent access for operational purposes.
14The provision of a site for nature conservation.
18The provision of a working site, landscaping and access for construction purposes.
Borough of Maidstone, Parish of Hollingbourne1, 3, 4 (part) and 5The provision of a working site, landscaping and access for construction purposes.
4 (part), 6, 9 and 10 (part)The provision of access for construction purposes and permanent access for operational purposes.
7 (part) and 8Alteration of a watercourse, provision of a balancing pond and permanent access for operational purposes.
7 (part), 16, 17 and 18The provision of drainage works.
10 (part)The provision of drainage works, a balancing pond and permanent access for operational purposes.
11, 13 and 14The provision of landscaping.
19, 20, 24 and 26The provision of permanent access for operational purposes.
29, 32 and 33The provision of balancing ponds and permanent access for operational purposes.
Borough of Maidstone, Parish of Leeds1The provision of access for construction purposes.
Borough of Maidstone, Parish of Harrietsham8, 9 and 10The provision of a balancing pond, drainage works and permanent access for operational purposes.
13The provision of drainage works, a balancing pond and a working site.
2, 20, and 21The diversion of public utilities’ apparatus.
32, 34 and 35 to 38 (part)The provision of balancing ponds, drainage works, a working site, access for construction purposes and footpath diversions, landscaping and permanent accesses for operational purposes.
38 (part), 41 and 42The provision of landscaping and access for construction purposes.
43, 45 and 46The provision of a waste disposal site, borrow pit, protective works, landscaping and access for maintenance and construction purposes.
Borough of Maidstone, Parish of Ulcombe1The provision of a balancing pond, drainage works and permanent access for operational purposes.
Borough of Maidstone, Parish of Lenham6The provision of a waste disposal site, borrow pit, protective works, landscaping and access for maintenance and construction purposes.
10 and 11The provision of drainage works and access for construction purposes.
20 (part)The provision of a spoil disposal site and a balancing pond.
20 (part)The provision of a spoil disposal site.
33 and 34The provision of a balancing pond.
87 to 89 (part)The provision of permanent access for operational purposes.
89 (part), 90 and 91The provision of permanent access for operational purposes.
Borough of Ashford, Parish of Charing21 and 22The provision of landscaping and new woodland planting.
38 and 39The provision of landscaping.
51The provision of replacement access to premises.
66The diversion of public utilities’ apparatus.
76 and 77The provision of an accommodation access.
68, 70, 71 and 72The provision of drainage works.
Borough of Ashford, Parish of Hothfield1 and 2The provision of drainage works.
6The provision of access for construction purposes.
7, 8 (part), 10 (part) and 12 (part)The provision of access for construction purposes and permanent access for operational purposes.
8 (part), 10 (part), 11, and 12 (part)The provision of a working site, landscaping and permanent access for operational purposes.
12 (part), 14 and 16The provision of a working site, landscaping and permanent access for operational purposes.
Borough of Ashford, Parish of Westwell1, 4, 5, and 20 (part)The provision of a working site, spoil disposal site, landscaping and permanent access for operational purposes.
16, 17, 18, 19, 20 (part) and 21 (part)The provision of a working site and landscaping.
21 (part), 24, 25, 26, 27, 40, 41 and 42The provision of access for construction purposes, a working site and landscaping.
44 and 45The provision of landscaping.
47 and 48The provision a spoil disposal site and landscaping.
56, 57, 60 (part), 65 and 67The provision of a borrow pit, spoil disposal site, access for construction purposes, an accommodation access and landscaping.
49 and 60 (part)The provision of access for construction purposes and permanent access for operational purposes.
Borough of Ashford, Town of Ashford8The provision of a working site and landscaping.
6, 10, 12 (part) and 13The provision of drainage works and diversion of a gas main.
12 (part) and 14 (part)The provision of accommodation access to premises, landscaping and a working site.
14 (part) and 16The provision of a working site.
14 (part) and 15The provision of a working site and access for construction purposes.
34 to 37 and 48The provision of a working site and access for construction purposes.
59 to 73 and 76The provision of a working site and access for construction purposes.
78 (part)The provision of a working site and access for construction purposes.
46, 78 (part), 79 and 80The provision of a working site and access for construction purposes.
85, 86, 89, 94 and 95The provision of a working site and access for construction purposes.
84 and 88The provision of access for construction purposes and permanent emergency access to the gas holder station and depot.
92, 93, 98 (part), 99 and 100The provision of access for construction purposes and permanent emergency access to the gas holder station and depot.
110, 111, 117 and 122The provision of a working site and access for construction purposes.
125 (part) and 131The provision of a working site and access for construction purposes.
178, 181, 183, 194 and 195The provision of flood storage lands and access for construction purposes.
144, 145, 177, 179, 180, 184, 185 and 186The provision of drainage works and access for construction purposes.
238 to 241The provision of a working site and access for construction purposes.
Borough of Ashford, Parish of Sevington5The provision of drainage works, a balancing pond and permanent access for operational purposes.
7 and 8The provision of a working site, access for construction purposes and permanent access for operational purposes.
9 and 12 (part)The provision of drainage works, a balancing pond and permanent access for operational purposes.
12 (part), 16 and 19The provision of a railhead, a working site, a balancing pond, access for construction purposes and permanent access for operational purposes.
28The provision of a working site.
34The provision of drainage works and access for construction purposes.
33The provision of a spoil disposal site.
35The provision of access for construction purposes, permanent access for operational purposes and dedication of road as a public highway connecting to Bad Munstereifel Road.
Borough of Ashford, Parish of Mersham1The provision of a spoil disposal site.
4The provision of drainage works, noise barriers and access for construction purposes.
11, 14, 15, 17, 20 and 27The provision of drainage works, a balancing pond, noise barriers, landscaping, access for construction purposes and permanent access for operational purposes.
19, 21, 22, 25 and 26The provision of landscaping, access for construction purposes and permanent access for operational purposes.
37, 41, 42, 45 and 46The provision of a working site, access for construction purposes, diversion of public utilities’ apparatus, a balancing pond and permanent access for operational purposes.
43The provision of noise barriers and drainage works and access for construction purposes.
Borough of Ashford, Parish of Smeeth6, 8, 13 and 16The provision of drainage works, footpath diversions, landscaping and permanent access for construction purposes.
24, 27The provision of access for construction purposes.
9, 10, 11 and 12The provision of drainage works, a balancing pond, landscaping and permanent access for operational purposes.
21 and 28The provision of flood storage lands.
30 (part) and 31The provision of a working site and access for construction purposes.
30 (part)The provision of electricity supply apparatus, landscaping and permanent access for operational purposes.
32 to 34The provision of access for construction purposes and alteration of overhead electric cables.
35The provision of noise barriers and access for construction purposes.
Borough of Ashford, Parish of Aldington5 and 7 (part)The provision of electricity supply apparatus, landscaping and permanent access for operational purposes.
7 (part), 12, 13 (part) and 14The provision of electricity supply apparatus and access for construction purposes.
3, 6 and 10The diversion of overhead electric cables.
13 (part), 19 and 20The provision of a working site, landscaping and access for construction purposes.
District of Shepway, Parish of Sellindge3, 4 and 5The provision of noise barriers and access for construction purposes.
1, 2 and 6The provision of a working site, diversion of overhead electric cables and access for construction purposes.
8Strengthening of railway embankment and diversion of overhead electric cables.
9 and 11The diversion of electric high voltage underground cables.
12, 14 and 15The diversion of electric high voltage underground cables and access for construction purposes.
16, 26 and 32 (part)The diversion of electric high voltage underground cables, the provision of noise barriers and access for construction purposes.
32 (part), 33, 46 and 47The alteration of overhead electric cables, provision of noise barriers and access for construction purposes.
30The alteration of overhead electric cables.
44, 45 and 60The provision of access for construction purposes.
District of Shepway, Parish of Stanford1 (part)The provision of noise barriers and access for construction purposes.
1 (part) and 2The provision of landscaping and access for construction purposes.
8 and 9 (part)The provision of drainage works, noise barriers, a working site and access for construction purposes.
7, 9 (part), 17, 18 and 19The provision of access for construction purposes.
District of Shepway, Parish of Saltwood1 and 3The provision of a working site, accommodation works and access for construction purposes.
7The provision of a balancing pond and permanent access for operational purposes.
13 to 16The provision of a working site and access for construction purposes.
26The provision of a footpath.
30The provision of drainage works.
37, 38 and 39The provision of a bridleway diversion, reconstruction of a bridleway bridge, provision of a working site, diversion of public utilities’ apparatus and access for construction purposes.
District of Shepway, Parish of Postling6 and 8The provision of permanent access for operational purposes.
11 and 14 to 18The provision of a working site and access for construction purposes.
District of Shepway, Parish of Newington3 and 4The provision of a working site and access for construction purposes.
6 and 9The provision of access for construction purposes.
17 and 27 (part)The provision of a spoil disposal site and access for construction purposes.
14, 15, 16, 19, 20, 21, 32 and 37The provision of access for construction purposes.
31 and 40The provision of working sites and access for construction purposes.
27 (part)The provision of access for construction purposes.
13, 25 and 29The provision of access for construction purposes, and permanent access to a balancing pond and for operational purposes.
60 and 61The provision of access for construction purposes and permanent access for operational purposes.
62The provision of access for construction purposes.
District of Shepway, Parish of Hythe1The provision of access for construction purposes.
District of Shepway, Town of Folkestone1Alteration of railway track equipment.
2 and 3The provision of access for construction purposes, and permanent access to a balancing pond and for operational purposes.
4 (part)The provision of access for construction purposes and permanent access for operational purposes.
4 (part)The provision of lineside equipment and permanent access for operational purposes.
6The provision of a working site and access for construction purposes.
District of Thanet, Parish of Minster2The provision of access to a railhead to be used for construction purposes.
Borough of Dover, Parish of Sandwich1The provision of access to a railhead to be used for construction purposes.

Part IIU.K. Application of Legislation Relating to Compulsory Purchase

Lands Clauses Consolidation Act 1845U.K.

1U.K.The M1Lands Clauses Consolidation Act 1845 shall not apply to the acquisition of land under section 4(1) above.

Marginal Citations

Compulsory Purchase Act 1965U.K.

2U.K.Part I of the M2Compulsory Purchase Act 1965, so far as not inconsistent with this Part of this Act, shall apply to an acquisition of land under section 4(1) above as it applies to a compulsory purchase to which Schedule 1 to the M3Acquisition of Land Act 1981 applies and as if this Act were a compulsory purchase order under that Act.

Marginal Citations

3(1)In its application by virtue of paragraph 2 above, the Compulsory Purchase Act 1965 shall have effect with the following modifications.U.K.

(2)Section 4 (time limit for exercise of powers of compulsory purchase) shall be omitted.

(3)Section 11(1) (power to enter on and take possession of land the subject of a notice to treat after giving not less than fourteen days’ notice) shall have effect—

(a)in a case where the notice to treat relates only to the acquisition of subsoil or under-surface of land or an easement or other right over land, with the substitution for “fourteen days” of “ one month’s ”, and

(b)in any other case, with the substitution for “fourteen days” of “ three months ”.

(4)In Schedule 3 (alternative procedure for obtaining right of entry) paragraph 3(3) (requirement as to sureties in relation to bond for compensation) shall be omitted.

Compulsory Purchase (Vesting Declarations) Act 1981U.K.

4U.K.The M4Compulsory Purchase (Vesting Declarations) Act 1981 shall apply as if this Act were a compulsory purchase order.

Marginal Citations

5(1)In its application by virtue of paragraph 4 above, the Compulsory Purchase (Vesting Declarations) Act 1981 shall have effect with the following modifications.U.K.

(2)In section 3 (preliminary notices) for subsection (1) there shall be substituted—

(1)Before making a declaration under section 4 below with respect to any land which is subject to a compulsory purchase order the acquiring authority shall include the particulars specified in subsection (3) below in a notice which is—

(a)given to every person with a relevant interest in the land with respect to which the declaration is to be made (other than a mortgagee who is not in possession), and

(b)published in the London Gazette.

(3)In that section, in subsection (2), for “(1)(b)” there shall be substituted “ (1) ”.

(4)In that section, subsections (5) and (6) shall be omitted and at the end there shall be inserted—

(7)For the purposes of this section, a person has a relevant interest in land if—

(a)he is for the time being entitled to dispose of the fee simple of the land, whether in possession or reversion, or

(b)he holds, or is entitled to the rents and profits of, the land under a lease or agreement, the unexpired term of which exceeds one month.

(5)In section 5 (earliest date for execution of declaration)—

(a)in subsection (1), after “publication” there shall be inserted “ in the London Gazette ”, and

(b)subsection (2) shall be omitted.

(6)In section 7 (constructive notice to treat) in subsection (1)(a), the words “(as modified by section 4 of the M5Acquisition of Land Act 1981)” shall be omitted.

(7)References to the M6Compulsory Purchase Act 1965 shall be construed as references to that Act as applied to the acquisition of land under section 4(1) above.

Marginal Citations

Part IIIU.K. Supplementary Provisions

Acquisition of subsoilU.K.

6(1)In the case of land specified in the following table (non-pedestrian tunnels), the power conferred by section 4(1) above shall only be exercisable in relation to so much of the subsoil or under-surface of the land as lies more than 9 metres beneath the level of the surface of the land.U.K.

The Table
AreaNo. on deposited plans
GREATER LONDON
London Borough of Islington307 to 318, 320 to 330, 332, 335, 338 to 739, 798, 799 and 803 to 1042
London Borough of Hackney1 to 183, 185 to 211 and 213 to 772
London Borough of Newham16 to 518, 522 to 540, 542 to 549, 551 to 1207, 1209 to 1223, 1235, 1236, 1238, 1240 to 1243 and 1246 to 1252
London Borough of Redbridge8 to 14
London Borough of Barking and Dagenham227 to 765, 767, 769 to 786, 794 and 796
COUNTY OF ESSEX
Borough of Thurrock99 and 103
COUNTY OF KENT
Borough of Tonbridge and Malling, Parish of Aylesford51 to 140 and 144 to 183
Borough of Tonbridge and Malling, Parish of Burham1 to 9

(2)In the case of land specified in the following table (pedestrian tunnels and ground anchors), the power conferred by section 4(1) above shall only be exercisable in relation to so much of the subsoil or under-surface of the land as lies more than 2 metres beneath the level of the surface of the land.

The Table
AreaNo. on deposited plans
GREATER LONDON
London Borough of Camden178
London Borough of Islington740 to 771
COUNTY OF KENT
Borough of Ashford, Parish of Mersham39

(3)In the case of any other land, the power conferred by section 4(1) above shall be exercisable as well in relation to the subsoil or under-surface only as in relation to the land as a whole.

(4)Section 8(1) of the M7Compulsory Purchase Act 1965 (limitation on right to require a person to sell part only of any house, building, manufactory or park or garden belonging to a house) shall not apply where the power conferred by section 4(1) above is exercised in relation to the subsoil or under-surface of land only.

(5)For the purposes of sub-paragraphs (1) and (2) above, the level of the surface of the land shall be taken—

(a)in the case of any land on which a building is erected, to be the level of the surface of the ground adjoining the building, and

(b)in the case of a watercourse or other area of water, to be the level of the surface of the adjoining ground which is at all times above water level.

Marginal Citations

Acquisition of existing tunnelsU.K.

7U.K.In the case of land specified in the following table (existing railway tunnels), the power conferred by section 4(1) above shall only be exercisable in relation to so much of the land as is comprised in an existing railway tunnel.

The Table
AreaNo. on deposited plans
GREATER LONDON
London Borough of Camden117 to 120, 122 to 140 and 228 to 231
London Borough of Islington20, 21 and 775 to 778
COUNTY OF KENT
Borough of Gravesham, Town of Gravesend49 to 61

Acquisition of new rightsU.K.

8(1)The power conferred by section 4(1)(a) or (b) above shall include, in relation to any land to which the power relates, power to create and acquire such easements or other rights over land as may be required as mentioned in that provision instead of acquiring the land itself.U.K.

(2)Part I of the Compulsory Purchase Act 1965, as applied to the acquisition of land under section 4(1) above, and the enactments relating to compensation for the compulsory purchase of land, shall apply to a compulsory acquisition by virtue of sub-paragraph (1) above—

(a)with the modifications specified in paragraph 9 below, and

(b)with such other modifications as may be necessary.

9(1)The modifications referred to in paragraph 8(2)(a) above are as follows.U.K.

(2)For section 7 of the M8Compulsory Purchase Act 1965 there shall be substituted—

7 Measure of compensation in case of purchase of new right.

In assessing the compensation to be paid by the acquiring authority under this Act regard shall be had not only to the extent (if any) to which the value of the land over which the right is purchased is depreciated by the acquisition of the right but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of his, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

(3)In section 8 of that Act (provisions as to divided land) for subsection (1) there shall be substituted—

(1)This subsection applies where—

(a)a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”) has been served on a person under section 5 of this Act,

(b)in consequence of the service of the notice, a question of disputed compensation in respect of the purchase of the right would, apart from this section, fall to be determined by the [F1Upper Tribunal], and

(c)before the [F2Upper Tribunal has] determined that question, the person on whom the notice has been served satisfies [F3the Upper Tribunal] that the relevant conditions are met.

(1A)The relevant conditions are—

(a)that he has an interest which he is able and willing to sell in the whole of the relevant land;

(b)where the relevant land consists of a house, building or manufactory, that it cannot be made subject to the right without material detriment to it; and

(c)where the relevant land consists of a park or garden belonging to a house, that it cannot be made subject to the right without seriously affecting the amenity or convenience of the house.

(1B)Where subsection (1) above applies—

(a)the compulsory purchase order shall, in relation to the person on whom the notice to treat has been served—

(i)cease to authorise the purchase of the right to which the notice relates, and

(ii)be deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of a park or garden belonging to a house, the house,

and

(b)the notice to treat shall be deemed to have been served in respect of that interest on such date as the [F4Upper Tribunal directs].

(1C)Any question as to the extent of the land in which the compulsory purchase order is deemed to authorise the purchase of an interest by virtue of subsection (1B)(a)(ii) of this section shall be determined by the [F5Upper Tribunal].

(1D)Where the [F6Upper Tribunal determines] that the person on whom a notice to treat has been served has satisfied [F7the Upper Tribunal] as mentioned in subsection (1)(c) of this section, the acquiring authority may withdraw the notice at any time within the period of six weeks beginning with the date of the determination.

(1E)Subsection (1D) of this section is without prejudice to any other power of the acquiring authority to withdraw the notice to treat.

(4)The following provisions of that Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land) namely—

shall be so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be purchased compulsorily is vested absolutely in the acquiring authority.

(5)Section 11 of that Act (powers of entry) shall be so modified as to secure that, as from the date on which the acquiring authority have served notice to treat in respect of any right, they have power, exercisable in the like circumstances and subject to the like conditions, to enter for the purpose of exercising that right (which shall be deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on [F8enforcement officer's or sheriff's warrant] in the event of obstruction) of that Act shall be modified correspondingly.

(6)Section 20 of that Act (compensation for short term tenants) shall apply with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition of the land but taking into account only the extent (if any) of such interference with such interests as is actually caused, or likely to be caused, by the exercise of the right in question.

(7)Section 22 of that Act (protection of acquiring authority’s possession of land where interest accidentally omitted from purchase) shall be so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.

(8)References in that Act to land are, in appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—

(a)the right acquired or to be acquired, or

(b)the land over which the right is, or is to be, exercisable.

(9)In the M9Land Compensation Act 1973, for section 44 there shall be substituted—

44 Compensation for injurious affection.

(1)Where a right over land is purchased from any person for the purpose of works which are to be situated partly on that land and partly elsewhere, compensation for injurious affection of land retained by that person shall be assessed by reference to the whole of the works and not only the part situated on the land over which the right is exercisable.

(2)In this section “compensation for injurious affection” means compensation for injurious affection under section 7 or 20 of the M10Compulsory Purchase Act 1965 as applied by paragraph 8(2) of Schedule 4 to the Channel Tunnel Rail Link Act 1996.

(10)For section 58 of that Act there shall be substituted—

58 Determination of material detriment where right over part of house etc. proposed for compulsory acquisition.

In determining under section 8(1)(c) of the Compulsory Purchase Act 1965 as applied by paragraph 8(2) of Schedule 4 to the Channel Tunnel Rail Link Act 1996 whether—

(a)a right over part of a house, building or manufactory can be taken without material detriment to the house, building or manufactory, or

(b)a right over part of a park or garden belonging to a house can be taken without seriously affecting the amenity or convenience of the house,

the [F9Upper Tribunal] shall take into account not only the effect of the right on the whole of the house, building or manufactory or of the house and the park or garden but also the use to be made of the rights proposed to be acquired and, in a case where the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use to be made of the other land.

Textual Amendments

Marginal Citations

10(1)The Secretary of State may by order provide, in relation to land to which this paragraph applies, that section 4(1) above, so far as relating to acquisition by virtue of paragraph 8(1) above, shall be treated as also authorising acquisition by such person as may be specified in the order.U.K.

(2)This paragraph applies to land within the limits of deviation for the scheduled works or within the limits of land to be acquired or used which is or will be required for use in relocating any apparatus which it is expedient to divert or replace in consequence of the carrying out of any of the works authorised by this Part of this Act.

(3)The power to make an order under sub-paragraph (1) above includes power to make an order varying or revoking any order previously made under that provision.

Acquisition of part only of certain propertiesU.K.

11(1)Where—U.K.

(a)a notice to treat under Part I of the Compulsory Purchase Act 1965, as applied to the acquisition of land under section 4(1) above, is served in respect of land forming part only of a house, building or factory or part only of land consisting of a house with a park or garden, and

(b)a copy of this paragraph is served with the notice to treat,

the following provisions of this paragraph, with paragraph 12 below, shall apply instead of section 8(1) of the Compulsory Purchase Act 1965.

(2)The person on whom the notice to treat is served (“the owner”) may within the period of 21 days beginning with the day on which the notice to treat is served on him, serve on the Secretary of State a counter-notice objecting to the sale of the part (“the land subject to the notice to treat”) and stating that he is willing and able to sell the whole (“the land subject to the counter-notice”).

(3)If no counter-notice is served under sub-paragraph (2) above, the owner shall be required to sell the land subject to the notice to treat.

(4)If a counter-notice is served under sub-paragraph (2) above and the Secretary of State agrees to take the land subject to the counter-notice, the notice to treat shall be deemed to be a notice to treat in addition for the remainder of the land subject to the counter-notice.

(5)If a counter-notice is served under sub-paragraph (2) above and the Secretary of State does not agree to take the land subject to the counter-notice, the question as to what land the owner is to be required to sell shall be referred to the [F10Upper Tribunal].

(6)If, on a reference under sub-paragraph (5) above, the [F11Upper Tribunal determines] that the land subject to the notice to treat can be taken—

(a)without material detriment to the remainder of the land subject to the counter-notice, and

(b)where the land subject to the notice to treat consists of or includes garden only land, without seriously affecting the amenity and convenience of the relevant house,

the owner shall be required to sell the land subject to the notice to treat.

(7)If, on such a reference, the [F11Upper Tribunal determines] that only part of the land subject to the notice to treat can be taken as mentioned in sub-paragraph (6) above, the notice to treat shall, subject to sub-paragraph (8) below, be deemed to be a notice to treat for that part.

(8)Where the land subject to the notice to treat is not land which consists of or includes garden only land, sub-paragraph (7) above shall only have effect to deem the notice to treat to be a notice to treat for land which does consist of or include garden only land if the [F11Upper Tribunal determines] that that land can be taken without seriously affecting the amenity and convenience of the relevant house.

(9)If, on such a reference, the [F11Upper Tribunal determines]

(a)that none of the land subject to the notice to treat can be taken without material detriment to the remainder of the land subject to the counter-notice, but

(b)that the material detriment is confined to part of the remainder of that land,

then, except where sub-paragraph (10) below applies, the notice to treat shall be deemed to be a notice to treat in addition for the land to which the material detriment is confined.

(10)If, in a case where the land subject to the notice to treat consists of or includes garden only land, the [F11Upper Tribunal determines] on such a reference that none of the land subject to the notice to treat can be taken without seriously affecting the amenity or convenience of the relevant house, the notice to treat shall be deemed to be a notice to treat in addition for the remainder of the land subject to the counter-notice.

(11)If, on such a reference, the [F11Upper Tribunal determines]

(a)that none of the land subject to the notice to treat can be taken without material detriment to the remainder of the land subject to the counter-notice, and

(b)that the material detriment is not confined to part of the remainder of that land,

the notice to treat shall be deemed to be a notice to treat in addition for the remainder of the land subject to the counter-notice.

(12)For the purposes of this paragraph, the land subject to the notice to treat consists of or includes garden only land if it consists of the whole or part of a park or garden belonging to a house or if it includes the whole or part of such a park or garden but does not include the house (“the relevant house”) or any part of it.

Textual Amendments

Modifications etc. (not altering text)

C1Sch. 4 para. 11 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

Sch. 4 para. 11 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)

12(1)Where under paragraph 11 above a notice to treat is deemed by virtue of a determination of the[F12Upper Tribunal] to be a notice to treat for less land or more land than that specified in the notice, the Secretary of State may, within the period of 6 weeks beginning with the day on which the determination is made, withdraw the notice.U.K.

(2)If the Secretary of State withdraws a notice to treat under sub-paragraph (1) above, he shall pay the person on whom the notice was served compensation for any loss or expense occasioned to that person by the giving and withdrawal of the notice, such compensation to be determined in case of dispute by the [F13Upper Tribunal].

(3)Where under paragraph 11 above a person is required to sell part only of a house, building or factory or of land consisting of a house with a park or garden, the Secretary of State shall pay him compensation for any loss sustained by him due to the severance of that part in addition to the value of the interest acquired.

(4)A notice to treat shall have the effect which it is deemed to have under paragraph 11(4), (9), (10) or (11) above whether or not the additional land is, apart from that provision, land which the Secretary of State is authorised to acquire compulsorily under this Part of this Act.

Textual Amendments

Modifications etc. (not altering text)

C2Sch. 4 para. 12 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

Sch. 4 para. 12 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)

MineralsU.K.

13(1)Parts II and III of Schedule 2 to the M11Acquisition of Land Act 1981 (exception of minerals from compulsory purchase and regulation of the working of mines or minerals underlying an authorised undertaking) shall have effect in relation to land to which section 4(1) above applies as if it were comprised in a compulsory purchase order providing for the incorporation with that order of those Parts of that Schedule.U.K.

(2)In their application by virtue of sub-paragraph (1) above, Parts II and III of Schedule 2 to the Acquisition of Land Act 1981 shall have effect with the following modifications—

(a)references to the acquiring authority, except the second reference in paragraph 6, shall be construed as references to the nominated undertaker, and

(b)references to the undertaking shall be construed as references to the undertaking which the nominated undertaker is authorised by this Part of this Act to carry on.

Modifications etc. (not altering text)

C3Sch. 4 para. 13 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

Sch. 4 para. 13 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(d), 3(5)

Marginal Citations

Power to require acquisition where time limit extendedU.K.

14(1)If the Secretary of State makes an order under section 47(2) above, the following provisions shall have effect as from the coming into operation of that order.U.K.

(2)If an owner or lessee of any of the land in relation to which the order is made gives notice in writing to the Secretary of State that he desires his interest in such of that land as is specified in the notice to be acquired by the Secretary of State, the Secretary of State shall, within the period of 3 months immediately following receipt of the notice—

(a)enter into an agreement with him for the acquisition of his interest in the whole or part of the land specified in the notice,

(b)exercise the relevant powers of compulsory acquisition in respect of his interest in the whole or part of the land specified in the notice, or

(c)serve on him notice in writing of the Secretary of State’s intention not to proceed with the purchase of his interest in any of the land specified in the notice.

(3)Where—

(a)a person gives the Secretary of State notice under sub-paragraph (2) above, and

(b)the Secretary of State—

(i)fails to comply with the requirements of that sub-paragraph,

(ii)withdraws a notice to treat served in compliance with paragraph (b) of that sub-paragraph, or

(iii)serves on the owner notice in compliance with paragraph (c) of that sub-paragraph,

the relevant powers of compulsory acquisition shall cease to be exercisable in respect of that person’s interest in any of the land specified in the notice under sub-paragraph (2) above.

(4)Where—

(a)a person gives the Secretary of State notice under sub-paragraph (2) above, and

(b)the Secretary of State acquires in pursuance of paragraph (a) or (b) of that sub-paragraph that person’s interest in some, but not all, of the land specified in the notice,

the relevant powers of compulsory acquisition shall cease to be exercisable in respect of that person’s interest in the remainder of that land.

(5)In this paragraph—

references to the relevant powers of compulsory acquisition are to—

(a)the power to serve a notice to treat under Part I of the M12Compulsory Purchase Act 1965, as applied to the acquisition of land under section 4(1) above, and

(b)the power to execute a declaration under section 4 of the M13Compulsory Purchase (Vesting Declarations) Act 1981, as applied by paragraph 4 above.

Marginal Citations

15(1)Paragraph 14 above shall not apply to any subsoil or under-surface of land required only for the construction of a work at a level more than the relevant distance below the level of the surface of the land.U.K.

(2)In sub-paragraph (1) above, the reference to the relevant distance is—

(a)in the case of a work consisting of a pedestrian tunnel or ground anchor, 2 metres, and

(b)in the case of any other work, 9 metres.

(3)For the purposes of sub-paragraph (1) above, the level of the surface of the land shall be taken—

(a)in the case of any land on which a building is erected, to be the level of the surface of the ground adjoining the building, and

(b)in the case of a watercourse or other area of water, to be the level of the surface of the adjoining ground which is at all times above water level.

CompensationU.K.

16U.K.Section 4 of the M14Acquisition of Land Act 1981 (assessment of compensation in relation to a compulsory purchase where unnecessary things done with a view to obtaining compensation) shall have effect in relation to a compulsory purchase under this Part of this Act as if it were a compulsory purchase for the purposes of that Act.

Modifications etc. (not altering text)

C4Sch. 4 para. 16 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 para. 1-8

Sch. 4 para. 16 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(d)

Marginal Citations