SCHEDULES
SCHEDULE 12 The A2 and M2 Improvement Works
Part I The Authorised Works
Description of works
Work No
Realignment of footpath KH 32, commencing at a point 12 metres south of the southern end of the footbridge carrying footpath KH 32A over Walderslade Wood, passing southwards over the M2 (Works Nos. 42A and 42B) on the eastern side of the existing bridge carrying that footpath over the M2 and terminating at a point 30 metres south of the southern end of that existing bridge, including a bridge over Works Nos. 42A and 42B;