xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 1U.K. Scheduled Works

Description of worksU.K.

Work No. 14T—U.K.An access road, for construction purposes, commencing by a junction with the eastbound carriageway of the M20 at a point 75 metres north-west of the western side of the existing bridge carrying Bowley Lane over the motorway, passing south-eastwards and eastwards to a point on the southern side of the railway (Work No. 14) 220 metres south-east of the intended bridge carrying that road over the railway, then passing southwards and south-eastwards and terminating by a junction with that carriageway of the M20 at a point 210 metres north-west of the western side of the bridge carrying Hubbard’s Farm access road over the motorway;