xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 1U.K. Scheduled Works

Description of worksU.K.

Work No. 9F(2)—U.K.A deviation railway (849 metres in length), commencing by a junction with the Tilbury Loop Railway at a point 325 metres east of the bridge carrying the southbound approach to the Queen Elizabeth II Bridge over that railway, passing eastwards on the southern side of that railway and terminating at the eastern end of the existing sidings;

In the borough of Thurrock, in the county of Essex, and in the borough of Dartford, parishes of Swanscombe and Greenhithe, Southfleet and Longfield and New Barn, in the borough of Gravesham, town of Gravesend, and in the district of Sevenoaks, parish of Horton Kirby and South Darenth, in the county of Kent—