SCHEDULES

SCHEDULE 1 Scheduled Works

Description of works

Work No

A railway (1,185 metres in length), being a realignment of the Tilbury Loop Railway, commencing by a junction with that railway at a point 230 metres south-east of the Wennington Branch Sewer where that sewer passes in culvert under that railway, passing south-eastwards in tunnel under the railway (Work No. 23) and terminating by a junction with the Tilbury Loop Railway at a point 240 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway;

In the borough of Thurrock, in the county of Essex—