xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Part IIIE+W Control over development

Modifications etc. (not altering text)

C1Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C4Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

Determination of applicationsE+W

[F170BPower to decline to determine overlapping applicationE+W

(1)A local planning authority may decline to determine an application for planning permission[F2, or permission in principle,] for the development of any land which is

[F3(a)made on the same day as a similar application, or

(b)] made at a time when any of the conditions in subsections (2) to (4) applies in relation to a similar application.

(2)The condition is that a similar application is under consideration by the local planning authority and the determination period for that application has not expired.

(3)The condition is that a similar application is under consideration by the Secretary of State in pursuance of section [F462A,] 76A or 77 or on an appeal under section 78 and the Secretary of State has not issued his decision.

(4)The condition is that a similar application—

(a)has been granted by the local planning authority,

(b)has been refused by them, or

(c)has not been determined by them within the determination period,

and the time within which an appeal could be made to the Secretary of State under section 78 has not expired.

[F5(4A)A local planning authority in England may also decline to determine an application for planning permission[F6, or permission in principle,] for the development of any land in England which is made at a time when the condition in subsection (4B) applies in relation to a similar application.

(4B)The condition is that—

(a)a similar application is under consideration by the Secretary of State,

(b)the similar application is an application deemed to have been made by section 177(5), and

(c)the Secretary of State has not issued his decision.]

(5)An application F7... is similar to another application if (and only if) the local planning authority think that the development and the land to which the applications relate are the same or substantially the same.

(6)The determination period is—

(a)the period prescribed by the development order for the determination of the application, or

(b)such longer period as the applicant and the authority have agreed for the determination of the application.

[F8(7)If a local planning authority exercise their power under subsection (1)(a) to decline to determine an application made on the same day as a similar application, they may not also exercise that power to decline to determine the similar application.]]

Textual Amendments

F1Ss. 70A, 70B substituted (24.8.2005 (E.) in so far as relates to s. 70A and 6.4.2009 (E.) in so far as relates to s. 70B) for s. 70A by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 43(1), 121 (with s. 111); S.I. 2005/2081, art. 2 (subject to savings in art. 4); S.I. 2009/384, art. 2(a)

F3Words in s. 70B(1) inserted (6.4.2009 for E. and otherwise prosp.) by Planning Act 2008 (c. 29), ss. 187, 241, Sch. 7 para. 3(2) (with s. 226); S.I. 2009/400, art. 5

F4Word in s. 70B(3) inserted (9.5.2013 for E. for specified purposes, 1.10.2013 for specified purposes, 1.10.2014 in so far as not already in force) by Growth and Infrastructure Act 2013 (c. 27), s. 35(1), Sch. 1 para. 7; S.I. 2013/1124, art. 2; S.I. 2013/2143, art. 2(1)(a); S.I. 2014/1531, art. 2

F5S. 70B(4A)(4B) inserted (6.4.2009) by Planning Act 2008 (c. 29), ss. 187, 241, Sch. 7 para. 3(3) (with s. 226); S.I. 2009/400, art. 3

F7Words in s. 70B(5) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 12 para. 13(3); S.I. 2016/733, reg. 3(d)

F8S. 70B(7) inserted (6.4.2009 for E. and otherwise prosp.) by Planning Act 2008 (c. 29), ss. 187, 241, Sch. 7 para. 3(4) (with s. 226); S.I. 2009/400, art. 5