Part IIIE+W Control over development

Modifications etc. (not altering text)

C1Pt. 3 (ss. 55-106) except ss. 76, 90(2)(5) applied (with modifications) (17.7.1992) by S.I. 1992/1492, regs. 2(1)(b), 3-11

Pt. 3 (ss. 55-106): power to modify conferred (10.11.1993) by 1993 c. 28, s. 171(1)(a); S.I. 1993/2762, art. 3

Pt. 3 (ss. 55-106) applied (5.11.1993) by 1993 c. 42, s. 24(1) (with ss. 2, 30(1), Sch. 2 para.9)

Pt. 3 (ss. 55-106) extended (1.11.1995) by 1995 c. 25, s. 96(2) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Pt. 3 (ss. 55-106) modified (1.4.1996) by 1994 c. 19, s. 20(3), Sch. 5 Pt. III paras. 15(1), 20 (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1995/3198, art. 4, Sch. 2

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 9(1)(2)

Pt. 3 (ss. 55-106) modified (18.12.1996) by 1996 c. 61, s. 51

Pt. 3 (ss. 55-106) modified (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), art. 20(1)

Pt. 3 (ss. 55-106) modified (31.10.2005) by The London Thames Gateway Development Corporation (Planning Functions) Order 2005 (S.I. 2005/2721), art. 4

Pt. 3 (ss. 55-106) modified (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), art. 21(1) (with arts. 3(5), 15(3))

Pt. 3 (ss. 55-106) applied (7.6.2006) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 89, 121, Sch. 4 para. 3(2) (with s. 111); S.I. 2006/1281, art. 2

Pt. 3 (ss. 55-106) modified (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), art. 17(1) (with art. 43)

Pt. 3 (ss. 55-106) modified (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), art. 18(1)

C4Pt. 3 modified (22.7.2008) by Crossrail Act 2008 (c. 18), s. 10(1)

[F1Wales: option to make application to Welsh MinistersE+W

Textual Amendments

F1Ss. 62M-62O and cross-heading inserted (6.9.2015 for specified purposes) by Planning (Wales) Act 2015 (anaw 4), ss. 23, 58(2)(b)(4)(b)

62NDesignation for the purposes of section 62ME+W

(1)In deciding whether to designate a local planning authority for the purposes of section 62M, or whether to revoke a designation, the Welsh Ministers must apply only criteria that satisfy the following conditions.

(2)The first condition is that the Welsh Ministers have consulted each local planning authority in Wales about the criteria.

(3)The second condition is that the criteria are set out in a document that the Welsh Ministers have laid before the National Assembly for Wales.

(4)The third condition is that the 21-day period has ended without the National Assembly having during that period resolved not to approve the document.

(5)The fourth condition is that the Welsh Ministers have published the document (whether before, during or after the 21-day period) in whatever way they think fit.

(6)In this section, “the 21-day period” means the period of 21 days beginning with the day on which the document is laid before the National Assembly for Wales under subsection (3), disregarding any time when the National Assembly is dissolved or is in recess for more than four days.

(7)The power to designate a local planning authority for the purposes of section 62M, or to revoke a designation, is exercisable by notice in writing to the authority.

(8)The Welsh Ministers must publish (in whatever way they think fit) a copy of any notice given to an authority under subsection (7).

(9)An urban development corporation may not be designated for the purposes of section 62M.]