C3C4C5C1C2 Part I ELECTRICITY SUPPLY

Annotations:
Modifications etc. (not altering text)
C1

Pt. I (ss. 1-64) applied (1.10.2001) by S.I. 2001/3264, regs. 4(2), 5(2)

C2

Pt. I (ss. 1-64) amended (E.W.) (27.10.2000) by S.I. 2000/2727, art. 10

Pt. I (ss. 1-64) amended (7.11.2000) by 2000 c. 27, s. 105(1)(a); S.I. 2000/2974, art. 2, Sch. (subject to transitional provisions in arts. 3-12)

Pt. I (ss. 1-64) amended (E.W.) (1.10.2001) by S.I. 2000/2727, art. 10 (as substituted (1.10.2001) by S.I. 2001/3268, art. 2(13))

Protection of public interest

32LGF1Onshore wind generating stations accredited, or additional capacity added, between 1 April 2017 and 31 March 2018: grid or radar delay condition met

The circumstances set out in this section are where the electricity is—

a

generated using the original capacity of an onshore wind generating station—

i

which was accredited during the period beginning with 1 April 2017 and ending with 31 March 2018,

ii

in respect of which the approved development condition is met, and

iii

in respect of which the grid or radar delay condition is met, or

b

generated using additional capacity of an onshore wind generating station, where—

i

the station was accredited on or before the onshore wind closure date,

ii

in the Authority's view, the additional capacity first formed part of the station during the period beginning with 1 April 2017 and ending with 31 March 2018,

iii

the approved development condition is met in respect of the additional capacity, and

iv

the grid or radar delay condition is met in respect of the additional capacity.