Highways Act 1980

Valid from 03/07/2000

[F1[F290CA Special procedure for certain road humps in London.E+W

(1)A road hump falls within this section if—

(a)it is constructed by a local highway authority in Greater London, and

(b)the requirements of subsections (2) and (3) below have been complied with.

(2)The requirement of this subsection is that before starting to construct the road hump the authority concerned gives the Secretary of State notice stating—

(a)the nature, dimensions and location of the proposed road hump,

(b)the spacing between the proposed road hump and any other humps constructed, or proposed to be constructed, in the vicinity,

(c)the type and description of signs which are proposed to be located in the highway in connection with the proposed hump,

(d)the statutory speed limit for motor vehicles to which the highway where it is proposed to construct the hump is subject, and

(e)the period (of not less than one month) within which, and the address to which, the Secretary of State may send any comments on the proposal to the authority.

(3)The requirement of this subsection is that in deciding—

(a)whether to proceed with the construction of the road hump, and

(b)what the nature, dimensions and location of the road hump as constructed are to be,

the authority concerned has regard to any comments made by the Secretary of State within the period stated in the notice.]]

Textual Amendments