SCHEDULES
SCHEDULE 1Lands
Part III [Section 18.] Temporary working sites
1
—In this Part of this Schedule—
“the designated lands” means any of the lands shown on the deposited plans within the lines marked “Limit of land to be used” and numbered on those plans—
2a, 3, 4 and 5a in the district of East Cambridgeshire, parish of Ely;
1, 2, 5, 7, 9, 11, 13 and 14 in the borough of Glanford, parish of Brigg;
1, 3, 5, 7, 10 and 14 in the borough of Glanford, parish of Scawby; and
2a in the district of Bassetlaw, parish of Ranskill; and
“the relevant works” means—
- a
the reconstruction of bridge number 1569, the more south-westerly of the two bridges carrying the railway between Cambridge and Ely over the river Great Ouse;
- b
the strengthening of the embankment of the railway between Gainsborough and Grimsby; and
- c
the provision of a loop extension on the railway between Doncaster and Retford.
- a