SCHEDULES

SCHEDULE 1Lands

Part III [Section 18.] Temporary working sites

1

—In this Part of this Schedule—

  • “the designated lands” means any of the lands shown on the deposited plans within the lines marked “Limit of land to be used” and numbered on those plans—

    • 2a, 3, 4 and 5a in the district of East Cambridgeshire, parish of Ely;

    • 1, 2, 5, 7, 9, 11, 13 and 14 in the borough of Glanford, parish of Brigg;

    • 1, 3, 5, 7, 10 and 14 in the borough of Glanford, parish of Scawby; and

    • 2a in the district of Bassetlaw, parish of Ranskill; and

  • “the relevant works” means—

    1. a

      the reconstruction of bridge number 1569, the more south-westerly of the two bridges carrying the railway between Cambridge and Ely over the river Great Ouse;

    2. b

      the strengthening of the embankment of the railway between Gainsborough and Grimsby; and

    3. c

      the provision of a loop extension on the railway between Doncaster and Retford.