Part IIWorks

10General mode of construction of underground railway

(1)The following provisions shall apply to the construction of the underground railway:—

(a)The works shall be constructed in two tunnels for separate up and down traffic except at cross-overs and junctions where they may be constructed in single tunnels of enlarged diameter:

(b)The underground railway shall be approached by means of stairs, inclines, subways, electric or other lifts or escalators:

(c)(i)The tunnels comprised in the underground railway (including those for the stations) shall be lined throughout with iron or other sufficient metal plates or with concrete or other suitable material;

(ii)Every permanent shaft shall be constructed either by underpinning or by sinking and shall be lined with cast iron, brick, concrete or other equally suitable and durable material;

(iii)The internal diameter of the station tunnels of the underground railway shall not exceed 10 metres, the internal diameter of the cross-over and junction tunnels shall not exceed 12 metres, the internal diameter of the tunnels between the stations shall not (except at cross-overs and junctions or where necessary for adjustment at curves or for other constructional purposes) exceed 6 metres, the internal diameter of the shafts shall not exceed 12 metres when circular and 20 metres by 10 metres when rectangular, and escalator tunnels shall have an internal diameter not exceeding 10 metres;

(iv)Where the ground is suitable any space between the lining of the tunnels (including station, cross-over and junction tunnels) and the surrounding soil shall be properly filled up with lime or cement grouting or other suitable materials placed therein under pressure:

(d)If water is found to be present in the construction of the underground railway in such quantity as to necessitate the employment of compressed air, the Company shall stop all excavating work at the point where the same is so found, and the further driving of the tunnels at the working face at that point, until air-compressing machinery shall have been provided to produce such a pressure of air as will prevent the inflow of any sand, water, gravel or soil, and such machinery shall be maintained in full working order, and the work at such working face carried on under compressed air, so long as may be necessary; alternatively instead of the work being carried on under compressed air, the Company may, in any case where it is expedient to staunch or limit any inflow of sand, water, gravel or soil into the tunnels, use chemicals to secure consolidation of the ground or may apply a freezing process for the freezing of the subsoil until the lining of the tunnel is fully erected or secured.

(2)Nothing in this section shall prejudice or affect the operation of the relevant statutory provisions as defined in [1974 c. 37.] Part I of the Health and Safety at Work etc. Act 1974.