London Underground Act 1992

4Power to make works

(1)The Company may, in the lines or situations shown on the deposited plans and according to the levels shown on the deposited sections, make and maintain in Greater London the works described in Schedule 1 to this Act with all necessary works and conveniences connected therewith.

(2)The Corporation may, after completion of any necessary work by the Company on such land, make and maintain with all necessary works and conveniences connected therewith a bus station on any part of the land shown numbered 5 to 10 and 59 to 64 in the London borough of Newham on the deposited plans.

(3)The Company may make and maintain—

(a)platforms adjacent to the East London Line on the land shown numbered 281 to 284 in the London borough of Southwark on the deposited plans together with accesses therefrom to any station built as part of Work No. 2 on such land;

(b)a widening on both sides thereof of—

(i)Stainer Street, in the London borough of Southwark;

(ii)Brunel Street, in the London borough of Newham;

to the extent shown on the (No. 2) plans;

(c)a road in the London borough of Newham between points J and K; and

(d)a footbridge in the London borough of Newham between points Q and T;

with all necessary works and conveniences connected therewith.

(4)On the completion of Work No. 12, the Company may fill in so much of the Channelsea River as lies between points U, V, W, X and Y as will be rendered unnecessary by that work.