The Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (England) Regulations 2002

 Help about what version

What Version

  • Draft legislation

More Resources

Draft Legislation:

This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Town and Country Planning (Fees for Applications and Deemed Applications) (Amendment) (England) Regulations 2002 No. 768

Regulation 2(4)

SCHEDULE 1PART II OF SCHEDULE 1 TO THE 1989 REGULATIONSSCALE OF FEES IN RESPECT OF APPLICATIONS MADE OR DEEMED TO BE MADE ON OR AFTER 1ST APRIL 2002

Category of developmentFee payable

rrI. Operations

1.  The erection of dwellinghouses (other than development within category 6 below).

(a)Where the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500;

(b)in other cases, £220 for each dwellinghouse to be created by the development, subject to a maximum of £11,000.

2.  The erection of buildings (other than buildings in categories 1,3,4,5 or 7).

(a)Where the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500;

(b)in other cases—

(i)where no floor space is to be created by the development, £110;

(ii)where the area of gross floor space to be created by the development does not exceed 40 square metres, £110;

(iii)where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £220; and

(iv)where the area of gross floor space to be created by the development exceeds 75 square metres, £220 for each 75 square metres, subject to a maximum of £11,000.

3.  The erection, on land used for the purposes of agriculture, of buildings to be used for agricultural purposes (other than buildings coming within category 4).

(a)Where the application is for outline planning permission, £220 for each 0.1 hectare of the site area, subject to a maximum of £5,500;

(b)in other cases—

(i)where the area of gross floor space to be created by the development does not exceed 465 square metres, £40;

(ii)where the area of gross floor space to be created by the development exceeds 465 square metres but does not exceed 540 square metres, £220; and

(iii)where the area of gross floor space to be created by the development exceeds 540 square metres, £220 for the first 540 square metres and £220 for each 75 square metres in excess of that figure, subject to a maximum of £11,000.

4.  The erection of glasshouses on land used for the purposes of agriculture.

(a)Where the gross floor space to be created by the development does not exceed 465 square metres, £40;

(b)where the gross floor space to be created by the development exceeds 465 square metres, £1,235.

5.  The erection, alteration or replacement of plant or machinery.

£220 for each 0.1 hectare of the site area, subject to a maximum of £11,000.

6.  The enlargement, improvement or other alteration of existing dwellinghouses.

(a)Where the application relates to one dwellinghouse, £110;

(b)where the application relates to 2 or more dwellinghouses, £220.

7.—(a) The carrying out of operations (including the erection of a building) within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such, or the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or

(b)the construction of carparks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.

£110.

8.  The carrying out of any operations connected with exploratory drilling for oil or natural gas.

£220 for each 0.1 hectare of the site area, subject to a maximum of £16,500.

9.  The carrying out of any operations not coming within any of the above categories.

£110 for each 0.1 hectare of the site area, subject to a maximum of—

(a)

in the case of operations for the winning and working of minerals, £16,500;

(b)

in other cases, £1,100.

II. Uses of Land

10.  The change of use of a building to use as one or more separate dwellinghouses.

(a)Where the change of use is from a previous use as a single dwellinghouse to use as two or more single dwellinghouses, £220 for each additional dwellinghouse to be created by the development, subject to a maximum of £11,000;

(b)in other cases, £220 for each dwellinghouse to be created by the development, subject to a maximum of £11,000.

11.—(a) The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land; or

(b)for use of land for the storage of minerals in the open.

£110 for each 0.1 hectare of the site area, subject to a maximum of £16,500.

12.  The making of a material change in the use of a building or land (other than a material change of use coming within any of the above categories).

£220.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once