PART 2WORKS
Amendment of 2019 Order3.
(1)
The 2019 Order is amended by the deletion in article 12 of the descriptions of Works No. 8, 9, 9A, 9B, 10, 11, 12, 13, 14 and 15 and the substitution therefor of the Works Nos. 8, 9, 10, 11, 12 and 13 described in article 4 of this Order.
(2)
The Authority shall have available to it in respect of the said works so substituted all powers and defences granted to it in respect of works under the 2019 Order as if they had been made under that Order.
Power to construct works4.
The Authority may in the lines and situations and within the limits of deviation and according to the levels shown on the deposited plans and sections construct and maintain the following works—
Work No. 8 – Deep Water Port - The reclamation and infilling of an area comprising 66,000 square metres of the seabed and foreshore and the excavation by blasting and levelling of 50,000 square metres of adjacent land, to form quayside working areas, laydown and storage areas, marshalling and parking areas for a freight ferry, and development areas, having berthing quay walls at its east and north edges, rock armoured revetted slopes at the south edges of the reclamation and rock faces around the edges of the excavated area, the location of which is shown on sheet 3A, with the limits of deviation shown in red, and sections of which are shown on sheet 4A.
Work No. 9 – A pier of open piled construction, 114 metres in length and 15 metres in width, connected to the south east corner of Work No.8, the location of which is shown on sheet 3A, with the limits of deviation shown in brown, and sections of which are shown on sheet 4A.
Work No. 10 – A steel linkspan bridge 40 metres long and varying from 10 to 20 metres in width, supported at its landward end on Work No. 8; and at its seaward end, on two dolphins, one partially piled and partially supported on the quay, the other partially piled and partially founded on the seabed in concrete; the location of which is shown on sheet 3A, with the limits of deviation shown in purple, and sections of which are shown on sheet 5A.
Work No. 11 – A road 350 metres long and 8 metres wide connecting Work No. 8 to the existing Arnish access road, constructed by excavation by blasting and levelling and with bituminous surfacing, the location of which is shown on sheet 3A, with the limits of deviation shown in blue, and sections of which are shown on sheet 5A.
Work No. 12 – A road 800 metres long and 25 metres wide, connecting Work No. 8 to the Arnish Fabrication Yard, constructed variously by excavation by blasting, levelling, reclamation and infilling, the location of which is shown on sheet 3A, with the limits of deviation shown in green, and sections of which are shown on sheet 6A.
Work No. 13 – The reclamation and infilling of an area comprising 4,000 square metres of the seabed through the excavation by blasting and levelling of adjacent land, adjoining Work No. 12, to form an access causeway, mooring points and working area, having rock armoured revetted slopes around its perimeter, the location of which is shown on sheet 3A, with the limits of deviation shown in yellow, and sections of which are shown on sheet 7A.
Rights of navigation to be interfered with5.
On the day on which this Order comes into force any rights of navigation within the harbour shall be extinguished to the extent only that the exercise of such rights would be prevented or hindered by the construction, presence, use or maintenance of the works authorised by article 4 (power to construct works).