PART 3WORKS PROVISIONS

Power to construct works5.

(1)

CMAL may in the lines and situations, upon the lands delineated and within the limits of deviation and according to the levels shown on the deposited plans construct and maintain the following works—

  • Work No. 1 - an open piled jetty structure connecting to Work No. 2 and shown on Sheets Nos. 2 and 3 of the deposited plans, forming the berthing and mooring line, and incorporating a fixed and adjustable passenger access gangway extending from Work No. 4 and extending through Work No. 2;

  • Work No. 2 – the reclamation and infilling of an area of the bed of Brodick Bay and the levelling of that area together with the levelling of the adjoining land and providing access to Works Nos. 1 and 3 and for the marshalling and parking of vehicles and for the site of Works Nos. 4, 5 and 6: to be retained on the seaward limits in part by rock armoured revertments and, as to the remainder, by a solid faced quay wall and shown on Sheets Nos. 2 and 3 of the deposited plans;

  • Work No. 3 - a mechanically operated single deck linkspan, providing access to and from vessels, extending from the reclaimed area comprising Work No. 2 including supporting piled bankseat and lifting frames with supporting dolphin structures and shown on Sheets Nos. 2 and 3 of the deposited plans;

  • Work No. 4 – a two storey terminal building to be constructed over reclaimed land forming part of Work No. 2 being the building shown on Sheets Nos. 2, 4 and 5 of the deposited plans; to be used for passenger and baggage handling, sales areas, management offices, staff welfare facilities and stores areas;

  • Work No. 5 – a single storey split level building being the building shown on Sheets Nos. 2 and 6 of the deposited plans; to be used as ticketing and check-in facilities for passenger and freight vehicles;

  • Work No. 6 – a water storage tank and pump house building shown on Sheets Nos. 2 and 3 of the deposited plans; to be used for ship supply;

  • Work No. 7 – lighting columns not exceeding 15 metres in height; and

  • Work No. 8 – demolition of existing pier and other structures shown hatched black on Sheet No. 2 of the deposited plans.

(2)

CMAL may, for the purposes of the works authorised by paragraph (1), remove any vegetation or other objects or materials and demolish and remove any structures or apparatus lying within the limits of deviation and enclose and reclaim so much of the bed of the sea and of the foreshore as lies within the limits of deviation and may use and hold the same as part of the harbour undertaking.

(3)

CMAL may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works authorised by paragraph (1) and may maintain the same as reconstructed, extended, enlarged, replaced or relaid.