PART 1PRELIMINARY
Interpretation2.
(1)
In this Order—
“deposited plans and sections” means the plans and sections prepared in duplicate and signed by a member of the Scottish Executive and marked “Plans and sections referred to in the Scrabster (Deep Inner Berth) Harbour Revision Order 2011” of which one is deposited with Scottish Ministers at Victoria Quay, Edinburgh EH6 6QQ and the other at the harbour office of the Trust;
“level of high water” means the level of mean high-water springs;
“limits of deviation” means the limits of deviation shown on the deposited plans and sections;
“tidal work” means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;
“works” means the works authorised by articles 3 (power to carry out quay work) and 4 (power to carry out dredging and demolition works) or, as the case may require, any part of them.
(2)
All areas, directions and distances as stated in any description of works, powers or lands other than article 5 (power to deviate) of this Order shall be construed as if the words “or thereabouts” were inserted after each such area, direction and distance.
(3)
Any reference in a description of works to a point shall be a reference to that point on the deposited plan.
(4)
All references to point locations in this Order are given as National Grid references.
(5)
Any reference in this Order to a work identified by the number of such work, shall be construed as a reference to the work of the same number authorised by this Order.