SCHEDULE 2RURAL PRIORITIES OPTIONS

Regulation 9(1)

PART 1OPTION, ACTIVITIES AND ELIGIBILITY CONDITIONS AND RATES OF PAYMENT

F1...

Column 1

Column 2

Column 3

Option

Activity and eligibility conditions

Rate of payment

1.

Skills development for individual land managers

(1)

A beneficiary is eligible for payment under this option if the beneficiary undertakes either–

(a)

vocational training courses for individual persons eligible to apply for any of the options numbered 2 to 62 in this schedule, the training courses must relate directly to an application for aid under any of those options; or

(b)

vocational training for persons involved in land management, including farming, crofting and forestry and who belong to an existing group set up with terms of reference and aims to improve land or business management performance and the following must apply–

(i)

there must be a minimum of 10 eligible trainees from at least 60% of the businesses belonging to such group;

(ii)

training must support the overall aims of the group, contribute to the SRDP outcomes and fall within one of the following categories–

(aa)

information and communications technology;

(bb)

business skills, including marketing and promotion;

(cc)

conservation and environment skills;

(dd)

diversification opportunities;

(ee)

managing resources;

(ff)

self and staff management;

(gg)

looking at new ways of working;

(hh)

technical skills;

(ii)

on farm food production and processing skills.

(iii)

the group must have been formed at least 6 months before the date the application for aid was submitted;

(iv)

the group must consist of at least 10 eligible businesses.

For both (a) and (b) above:

  1. (i)

    the beneficiary must be either a land manager, employee or immediate family member involved in the business and must be 16 years of age or older;

  2. (ii)

    the training provider must be certified by an appropriate certification body; and

  3. (iii)

    the course must not:

    1. (aa)

      form part of normal agricultural, forestry or other programmes at secondary or higher education levels;

    2. (bb)

      be required or lead to a certificate, licence, diploma or other qualification that is required by law to carry out the beneficiary's basic work activities; or

    3. (cc)

      be funded, in whole or in part, by other public funds.

75percnt; of the cost of training.

An additional 10% for the organising member of the group based on the total cost of group training.

2.

Setting up of young farmers

(1)

A beneficiary is eligible for payment under this option if the beneficiary is a young farmer, is head (either sole trader or the majority partner in partnership or an equal partner with another young farmer) of an agricultural business registered on IACS for the first time and has been head for no more than 12 months and–

(a)

prepares a business plan detailing the initial state of the business; the scope and aims of the project with milestones for development; the investments involved and any training advice or other action required and where the beneficiary does not hold a suitable agricultural qualification at least at Scottish Vocational Qualification level 2 or equivalent, the business plan must include a personal development plan including an objective to obtain an appropriate qualification within 3 years after approval of the application for aid. The plan must also include an objective to gain membership of a Quality Assurance Scheme appropriate to the business within 3 years of approval of the application.

(2)

The business must have an agricultural standard labour requirement of at least F20.25 full time equivalent M1.

F3Support up to a maximum of £47,945 (that is up to £27,397 interest rate relief plus an establishment grant equal to 75% of the interest rate relief awarded) for businesses with an agricultural standard labour requirement of a least 0.5 full time equivalent.

Support up to a maximum of £28,767 (that is, up to £16,438 interest rate relief plus an establishment grant equal to 75% of the interest relief awarded) for businesses with an agricultural standard labour requirement of between 0.25 and under 0.5 full time.

For the interest rate subsidy, payment will be made annually in arrears over a maximum period of 5 years. The interest rate for which subsidy is payable will be capped at 3.5% above the Bank of England Base Rate.

The establishment grant will be payable in one instalment;

F4. . .

F4. . .

5.

Restructuring of agricultural businesses

(1)

A beneficiary is eligible for payment under this option if the beneficiary is an agricultural business and–

(a)

produces a review of the business, detailing its strengths and weaknesses and options for change and identifies the expected improvements in performance of the business and shows that the proposed investments are part of a longer term process of improving viability and competitiveness;

(b)

incurs costs for providing or upgrading buildings and associated structure, necessary equipment, infrastructure or information technology and associated fees where these investments–

(i)

are an essential part of the restructuring or re orientation of the business; and

(ii)

the restructuring will result in improvements in business viability, environmental management, health and safety and/or animal health and welfare.

Up to 40% of eligible costs (non Less Favoured Areas) and 50% (Less Favoured Areas) with a 10% premium for investments undertaken by young farmers.

6.

Manure/slurry storage and treatment

(1)

A beneficiary is eligible for payment under this option if the beneficiary undertakes either or both (a) or (b)–

(a)

improvements in manure storage, handling and application facilities through one or more of the following–

(i)

new or enhanced slurry stores or manure storage;

(ii)

roofs for slurry stores;

(iii)

slurry separation equipment;

(iv)

equipment for slurry spreading that controls more efficiently the application of nutrients;

(b)

manure treatment with one or more of the following–

(i)

storage facilities for slurry and biogas;

(ii)

biogas F5(including anaerobic digestion) structures, machinery and equipment;

(iii)

composting structures, machinery and equipment.

(2)

For (a) and (b) above–

(i)

the beneficiary must identify the expected improvements in performance of the business, as a result of the planned investment, against the following criteria; business viability, animal health and welfare, environmental management, or health and safety; and

(ii)

manure and slurry must be stored to minimise the risk of water pollution and the beneficiary must comply with the Control of Pollution (Silage, Slurry and Agricultural Fuel Oil) (Scotland) Regulations 2003 M2.

Up to F650% of eligible costs (non Less Favoured Areas) and F760% (Less Favoured Areas) with a 10% premium for investments undertaken by young farmers.

7.

Establishment of short rotation coppice crops of willow or poplar

(1)

This is a capital payment with a 5 year commitment attached.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

plants a minimum of 2 hectares with 10,000 willow or poplar cuttings per hectare;

(b)

maintains the established trees for a period of at least 5 years;

(c)

has established an end use for the produce; and

(d)

has planted the trees in compliance with the UK Forestry Standard.

40% of eligible actual costs (non Less Favoured Areas) and 50% F8of eligible actual costs (Less Favoured Area) F9including the cost of fencing (for both non Less Favoured Areas and Less Favoured Areas) up to a maximum F10payment of £1000 per hectare.

8.

Support for renewable energy – agriculture

(1)

Eligible beneficiaries are agricultural land managers.

(2)

A beneficiary is eligible for payment under this option, for purchase and installation, construction, upgrading or development of infrastructure and/or equipment for small scale renewable energy capacity if the beneficiary–

(a)

develops small scale renewable energy capacity that uses a range of renewable technologies where the investment will contribute to–

(i)

a reduction in carbon emission;

(ii)

helping towards developing a local, sustainable energy supply;

(iii)

improving business efficiency; and

(b)

produces documentation to demonstrate the renewable energy system was installed by a registered installer on the Department for Business and Regulatory Reform accredited list M3 and provides the Scottish Ministers with a receipted invoice.

Up to 50% of eligible costs in Less Favoured Areas (60% for young farmers).

Up to 40% of eligible costs in non Less Favoured Areas (50% for young farmers).

9.

Support for renewable energy – forestry

(1)

Eligible beneficiaries are forestry land managers.

(2)

A beneficiary is eligible for payment under this option, for purchase and installation, construction, upgrading or development of infrastructure and/or equipment for small scale renewable energy capacity if the beneficiary–

(a)

develops small scale renewable energy capacity that uses a range of renewable technologies where the investment will contribute to:

(i)

a reduction in carbon emission;

(ii)

helping towards developing a local, sustainable energy supply;

(iii)

improving business efficiency; and

(b)

produces documentation to demonstrate the renewable energy system was installed by a registered installer on the Department for Business and Regulatory Reform accredited list M4 and provides the Scottish Ministers with a receipted invoice.

Up to 50% of eligible costs in Less Favoured Areas.

Up to 40% of eligible costs in non Less Favoured Areas.

10.

Improving the economic value of forests

(1)

A beneficiary is eligible for payment under this option if the beneficiary–

F11(a)

has a forest holding of at least one hectare, which is managed in accordance with a forest management plan which is in compliance with the UK Forestry Standard and approved by the Forestry Commission Scotland;

(b)

produces an investment plan quantifying the estimated costs of investment operations and estimated income from produce; and

(c)

implements one or more of the eligible investment operations outlined in such plan and as listed below–

(i)

early pruning to improve timber quality;

(ii)

high pruning to improve timber quality;

F12(iii)

thinning to improve average stem quality;

(iv)

re spacing of natural regeneration where stem density exceeds 4,000 trees/hectare;

(v)

reducing deer numbers to minimise browsing and fraying damage which results in stem deformities or fungal rot so as to improve the conditions for the production of quality timber; or

(vi)

controlling grey squirrels to prevent bark stripping damage and enable quality timber production from broadleaved woodland.

(2)

Where independent certification of the forest holding has been undertaken, in accordance with the UK Woodland Assurance Standard (2nd Edition) M5, additional support will be given to associated costs of preparing and implementing a plan required by the certification body to close out Corrective Action Requests issued by such certification body.

Up to 50% of net actual costs identified and approved in the investment plan.

11.

Processing and marketing

(1)

Eligible beneficiaries are individual land managers, farmers and small rural businesses directly linked to on farm or near holding production units, groups of primary producers or companies involved in primary production, processing and marketing.

(2)

Support is limited to micro enterprises and small and medium sized enterprises within the meaning of Commission Recommendation 2003/361/EC of 6th May 2003 concerning the definition of micro, small and medium sized enterprises M6except in the case of forestry where support is limited to micro enterprises.

(3)

All primary sectors listed in Annex 1 to the Treaty except fishery products (and drinks where the primary inputs are covered by Annex 1 to the Treaty) are eligible as well as forestry products.

(4)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

does any of the following–

(i)

develops new or improves existing primary product processing facilities;

(ii)

purchases plant and equipment including computer hardware and software and incurs directly related general costs including architects, engineers and consultants fees; or

(iii)

undertakes a range of business development activities to support the food processing operation;

(b)

does not have separate accounts for farm business and processing; and

(c)

has a turnover of less than £150,000 for the processing business.

(5)

General related costs including fees up to a combined maximum of 11% of total eligible costs and marketing costs up to a combined maximum cost of 11% of total eligible costs are eligible.

In the Highlands and Islands up to 50% of eligible costs. Up to 40% elsewhere.

12.

Co operation (non food and forest products)

(1)

Eligible beneficiaries are individuals, primary producers, groups of primary producers or companies.

(2)

Beneficiaries are eligible for payment if they co operate with other producers, suppliers or third parties and this may include developing one or more of the following–

(a)

innovative processing facilities;

(b)

new added value;

(c)

new markets for products.

(3)

The new products, processes and technologies must not displace existing products or businesses within the Scottish land based sectors.

(4)

The following costs are eligible–

(a)

non capital costs of resources to support co operation, collaboration, and development within the supply chain;

(b)

costs of developing innovative new products in a co operative way across 2 or more partners;

(c)

support for market research to increase current market share, or aid market penetration for new products;

(d)

support for market development plans at a strategic level to support the sector;

(e)

aiding the organisation and development of the sector, with a view to facilitating a greater degree of vertical integration.

(5)

The following costs are not eligible–

(a)

purchase of buildings intended for demolition or which have been used for the same purpose previously;

(b)

working capital;

(c)

harvesting equipment;

(d)

the company's own labour and equipment costs;

(e)

consumables such as paper and ink;

(f)

repair and maintenance costs;

(g)

office equipment and other furniture (specific telephone equipment, computers and software related to the development are eligible);

(h)

landscaping and ornamental work;

(i)

general costs including fees relating to planning, building and works.

Up to 100% of eligible costs.

13.

Provision and upgrading of infrastructure related to access to farm and forest land, energy supplies and water management

(1)

A beneficiary is eligible for payment under this option if they are a land manager and if the beneficiary–

(a)

provides or upgrades infrastructure elements where it can be shown that–

(i)

they are an essential part of the restructuring or re orientation of the business; and

(ii)

the restructuring will result in improvements in access to farm or forest land, in the supply of energy or in water management;

(b)

is compliant with existing European Community standards applicable to any new areas of activity undertaken as a result of investment concerned; and

(c)

identifies in the application the expected improvements in performance of the business as a result of the planned investment, against the criteria of improved viability, increased market orientation, enhanced animal welfare or protection of the water environment.

Up to 50% of eligible costs in Less Favoured Areas (60% for young farmers).

Up to 40% of eligible costs in non Less Favoured Areas (50% for young farmers).

14.

Treatment of run–off of nutrients and other pollutants

(1)

A beneficiary is eligible for payment under this option if the beneficiary is an agriculture or forestry manager and does either or both of the following–

(a)

plans to and constructs bio beds in accordance with recognised design principles in a SEPA endorsed design manual and does the following–

(i)

mixes and handles pesticides and wash down either directly over the bio bed or in an adjacent bunded concrete area which drains to the bio bed;

(ii)

registers any waste exemptions with SEPA;

(iii)

obtains an authorisation from SEPA under the Water Environment (Controlled Activities) (Scotland) Regulations 2005 M7 where liquid residue is disposed of to land; or

(b)

plans to and constructs and demonstrates that a constructed farm wetland–

(i)

will be of environmental benefit; and

(ii)

will deal with pollutants by collecting, storing and treating lightly contaminated water from the steading.

Up to 50% of eligible costs in Less Favoured Areas (60% for young farmers).

Up to 40% of eligible costs in non Less Favoured Areas (50% for young farmers).

15.

Conversion to and maintenance of organic farming

(1)

In this option “production unit” means land, other than a common grazing, farmed in Scotland by an applicant or a beneficiary which has been accepted by an organic certification body as viable for conversion to organic farming methods.

(2)

There are 5 elements to this option–

  • A. Conversion of land to organic production

  • B. Conversion of land to organic production in phases

  • C. Maintenance of organic production

  • D. Maintenance of organic production of land converted to organic production in phases

  • E. Capital Items

A. Conversion of land to organic production

  • This is a minimum 5 year commitment.

  • A beneficiary is eligible for payment under this option if the beneficiary–

    1. (a)

      converts land to organic production to gain full organic certification;

    2. (b)

      gains full organic certification;

    3. (c)

      maintains that certification with F13a control body for the remainder of the relevant period of the undertaking and submits confirmation of such certification to the Scottish Ministers;

    4. (d)

      continues to farm the land in accordance with Council Regulation F14834/2007 F15... throughout the relevant period of the undertaking;

    5. (e)

      submits an organic viability proposal with the application;

    6. (f)

      begins organic conversion of the land either–

      1. (i)

        within 6 months of the date of approval of the application; or

      2. (ii)

        by the date of commencement of the undertaking, whichever date is later;

    7. (g)

      does not manage the land as formally in conversion or as fully organic before submitting an application for aid;

    8. (h)

      submits confirmation to the Scottish Ministers from F13a control body that organic conversion has begun by the dates specified in (f) above;

      1. (i)

        ensures that where land is to be registered with a different F16control body, such registration must be completed before registration of the land ends with the existing F16control body;

    9. (j)

      where the beneficiary has responsibility for organic production on other land which is already fully organic at the date of the application, maintains that certification for the relevant period of the undertaking or, where shorter, the period of such responsibility; and

    10. (j)

      where land is vegetable and fruit land, produces vegetables or fruit for a minimum of one year in any of years 3 to 5 of the relevant period of the undertaking.

B. Conversion of land to organic production in phases

  • A beneficiary may undertake to convert land under element A to organic production to gain full organic certification in phases and in such circumstances the commitment may extend to a maximum of 9 years.

  • A beneficiary is eligible for payment to convert land in phases if the beneficiary–

    1. (a)

      meets the eligibility obligations and requirements specified under (a) to (k) in element A above for the whole production unit or common grazing that the undertaking refers to;

    2. (b)

      divides the land into no more than 5 areas of land with each area of land deemed to be a separate production unit or common grazing;

    3. (c)

      specifies each area of land and nominates in the application for aid the order in which these areas of land will be converted to organic production;

    4. (d)

      agrees the relevant period of the undertaking for each particular area of land to be converted to organic production in phases with the Scottish Ministers; and

    5. (e)

      starts conversion of the last area of the land to be converted to organic production no later than 5 years from the start of the relevant period of the undertaking relating to the first area of land to be so converted.

  • For both elements A and B above–

    1. (a)

      land is eligible if–

      1. (i)

        the land is a production unit, or if the applicant is a grazings committee, a common grazing which has been accepted by F17a control body as viable for conversion to organic production;

      2. (ii)

        the land is any of the following:–

      3. (aa)

        arable land;

      4. (bb)

        improved grassland;

      5. (cc)

        rough grazing or unimproved grassland;

      6. (dd)

        vegetable and fruit land;

      7. (iii)

        the land extends to not less than one hectare; and

      8. (iv)

        it is land which has not been formally in conversion or fully organic at any time during the period from 1st January 2000 until the date of submission of the application for aid; and

    2. (b)

      payments of aid for conversion shall be made in respect of a maximum of 1000 hectares per holding or common grazing and within this maximum payments in relation to arable land, improved grassland and vegetable and fruit land shall not be made in respect of more than 300 hectares of any such land taken together or separately.

C. Maintenance of Organic Production

  • This is a minimum 5 year commitment.

  • A beneficiary is eligible for payment for the maintenance of organic production if the beneficiary–

    1. (a)

      submits to the Scottish Ministers evidence of full organic certification for the land included in the application;

    2. (b)

      continues to farm the land in accordance with Council Regulation F18834/2007 F19... throughout the relevant period of the undertaking;

    3. (c)

      ensures that where land is to be registered with a different F18control body, such registration must be completed before registration of the land ends with the existing F18control body;

    4. (d)

      maintains full organic certification throughout the relevant period of the undertaking and submits confirmation of such certification to the Scottish Ministers; and

    5. (e)

      where land is vegetable and fruit land, produces vegetables or fruit for a minimum of 2 years during the relevant period of the undertaking.

D. Maintenance of land converted to organic production in phases

  • Where a beneficiary has undertaken to convert land to organic production to gain full organic certification in phases under element B above, the beneficiary may undertake to phase in the maintenance of full organic certification of land converted to organic production and in such circumstances the commitment may extend to a maximum of 9 years.

  • A beneficiary is eligible for payment to phase in the maintenance of full organic certification of land if–

    1. (a)

      the beneficiary meets the eligibility obligations and requirements specified under (a) to (e) above for the whole organic production unit or common grazing that the undertaking refers to;

    2. (b)

      the conversion of the land to organic production has been phased in either under these Regulations, the 2004 Regulations or the 1994 Regulations and the last area of land to be converted has not been converted;

    3. (c)

      in the application for aid, the beneficiary identifies the areas of land which have been and are being converted to organic production in phases and identifies the order in which these areas of land will start to be maintained which shall be the same order as the order in which the areas of land were converted to organic production and each area of land is deemed to be a separate organic production unit or common grazing;

    4. (d)

      the beneficiary agrees the relevant period of the undertaking with the Scottish Ministers for the maintenance of each particular area of land;

    5. (e)

      the beneficiary maintains full organic certification of the converted land as and when phased in for the relevant period of the undertaking.

  • For both elements C and D above–

    1. (a)

      land is eligible if–

      1. (i)

        the land is an organic production unit, or if the applicant is a grazings committee, a common grazings which is fully organic;

      2. (ii)

        the land extends to not less than one hectare;

      3. (iii)

        the land is any of the following:–

      4. (aa)

        arable land;

      5. (bb)

        improved grassland;

      6. (cc)

        rough grazing or unimproved grassland;

      7. (dd)

        vegetable and fruit land; and

      8. (iv)

        either–

      9. (aa)

        no aid is payable under these Regulations, the 2004 Regulations or the 1994 Regulations in respect of the land; or

      10. (bb)

        aid is payable under an undertaking under these Regulations, the 2004 Regulations or the 1994 Regulations in respect of the land but the undertaking has ended or will have ended before the commencement of the relevant period of the undertaking under element C or D above; and

    2. (b)

      payments of aid for maintenance shall be made in respect of a maximum of 1000 hectares per holding or common grazing and within this maximum payments in relation to arable land, improved grassland and vegetable and fruit land shall not be made in respect of more than 300 hectares of any such land taken together or separately.

  • Where land has been converted to organic production in phases under element B above or under the 2004 Regulations or the 1994 Regulations, an undertaking for the land can be entered into under element D above but payments for each area of land can only commence once the relevant period of the undertaking for the conversion to organic production for that area of land has ended.

E. Capital Items

A beneficiary is eligible for payment for capital items if the beneficiary–

  1. (a)

    converts land to organic production to gain full organic certification under either element A or B above;

  2. (b)

    meets the eligibility obligations and requirements specified under (a) to (k) under element A above for the whole production unit or common grazing;

  3. (c)

    carries out any of the capital items specified in column 1 of Schedule 3 in accordance with the requirements outlined in the programme guidance; and

  4. (d)

    completes the capital item within 2 years of the start of the conversion of the land to organic production and where conversion is undertaken in phases, within 2 years of the start of the conversion of each particular area of phased in land.

F20As set out in Table A in Part 2 of this Schedule.

16.

Wild bird seed mix/unharvested crop

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary either–

(a)

spring sows a mixture of annual crops, including at least one cereal which will provide seed for the targeted species and does not plough down until after 15th March the following year; or

(b)

F21spring sows a mixture of at least 2 crops, one of which must seed in the first year and one in the second and ploughs in after 15th March following last seeding year.

F22(3)

For both options (a) and (b) in paragraph (2) above—

(a)

plots must be on arable or improved grassland and maximum of 2 hectares in size;

(b)

pesticides must not be applied except where the application is necessary to aid the establishment of the crop or with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species; and

(c)

beneficiaries need not manage the same field each year, but must give details of the different fields and their locations and their areas in the application for aid. If, during the relevant period, a different rotation to that originally approved is agreed with the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the originally approved area or the revised area, whichever is smaller.

(4)

In Corn Bunting areas (East Scotland, Uists and Borders) either one-year cereal-based mixes must be established or, where 2 year mixes are sown, at least 2 plots must be established in alternate years.

£391.26 per hectare per year.

17.

Management of mown grassland for wildlife

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on a grassland field on which an extensive crop of hay or silage will be grown if the beneficiary–

(a)

does not roll, harrow or graze the field from 1st April until 30th June inclusive or until the crop has been secured, whichever is the later F23; for beneficiaries in Shetland the exclusion period may start any time between 1st and 30th April and last for three months from the start date;

(b)

mows the field but neither mowing nor the reintroduction of grazing may take place before 1st July or the end of the exclusion period, whichever is later;

(c)

cuts the hay and silage in a wildlife friendly manner in accordance with the programme guidance;

(d)

does not apply artificial fertilizer before 15th May, or 1st June where later ground-nesting birds and young may be found;

(e)

after mowing, leaves uncut a strip of grass 2 metres wide around the field boundary F24...;

(f)

does not apply pesticides to the 2 metre strip F25except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species; F26...

(g)

F27(where this could result in a negative impact on the target species) ensures little or no tree cover around fields F28; and

(h)

does not apply slurry or farmyard manure to the field from 1st March until 15th May, or until 1st June where later ground-nesting birds and young may be found.

(3)

Beneficiaries need not manage the same field each year, but must give details of the different fields and their locations and their areas in the application for aid. If during the lifetime of the undertaking a different rotation to that originally approved is agreed with the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the originally approved area or the revised area, whichever is smaller.

(4)

Fields in the first year in which spring sown grass is being established are ineligible.

(5)

Fields receiving substantial applications of fertiliser or slurry are ineligible.

£174.88 per hectare per year.

18.

Management of mown grassland for corn buntings

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on fields used for growing a hay or silage crop within the breeding distribution of Corn Buntings in East Scotland, Uists and Borders if the beneficiary–

(a)

excludes stock from hay or silage fields from 1st May;

(b)

does not roll, harrow or graze fields from 1st May until after the field has been mown and where ground nests are present before 1st May, they must be marked and avoided;

F29(c)

mows fields but mowing must be delayed until after—

(i)

24th July; in which case the rate of payment for Option 1 applies, or

(ii)

1st August where corncrakes are also present; in which case the rate of payment for Option 2 applies;

(d)

cuts hay and silage in a wildlife friendly manner in accordance with the programme guidance;

(e)

leaves uncut a strip of grass 2 metres wide around the field boundary; and

(f)

does not apply pesticides to the 2 metre strip F30except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

F31(3)

Beneficiaries need not manage the same field each year where winter keep production is rotated around grassland area, but must give details of the different fields and their locations and their areas in the application for aid. If, during the relevant period, a different rotation to that originally approved is agreed with the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the originally approved area or the revised area, whichever is smaller.

F32Option 1 - £216 per hectare per year.

Option 2 – £ 224.48 per hectare per year.

19.

Management of mown grassland for corncrakes F33or chough

(1)

This is a 5 year commitment.

F34(2)

For the management of mown grassland for the benefit of corncrakes, a beneficiary is eligible for payment under this option on a grassland field on which an extensive crop of hay or silage will be grown if the beneficiary—

(a)

is a land manager in the Argyll Islands, Skye, Small Isles, Western Isles, Orkney or parts of the north coast of the Scottish Mainland which support corncrake populations;

(b)

carries out this option in combination with one of the following rural priorities options, which must be undertaken on directly adjacent land—

(i)

Management of early and late cover for corncrakes;

(ii)

Creation and management of early and late cover for corncrakes;

(iii)

Management of grazed grassland for corncrakes; or

(iv)

Wild bird seed mix/unharvested crop;

(c)

excludes livestock from hay or silage fields from 15th May;

(d)

does not roll, harrow or graze the field from 15th May until after it has been mown and marks and avoids ground nests which were present before 15th May;

(e)

provides suitable temporary cover for at least two weeks after the field has been mown to enable corncrakes to move into more permanent corncrake cover;

(f)

makes the temporary cover—

(i)

directly adjacent to permanent corncrake cover; and

(ii)

at least 2 metres wide around the field boundary, except where the field is less than 40 metres wide where temporary cover may be provided on one side of the field only; and

(g)

does not apply pesticides to the temporary cover.

(3)

For the management of mown grassland for the benefit of chough, a beneficiary is eligible for payment under this option for farm land on in-bye rotational grassland, permanent grassland and pastures dominated by a variety of grassland types that are maintained by seasonal or year round grazing if the beneficiary—

(a)

is a land manager in the Argyll Islands or in Wigtownshire where chough occur;

(b)

provides areas suitable for chough to forage in during chick rearing and fledging periods by grazing pasture until 14th June and then excludes livestock from hay or silage fields from 15th June; and

(c)

does not roll, harrow or graze the field from 15th June until after it has been mown, which must not be before 15th August, and marks and avoids ground nests which are present before 15th June.

(4)

For the management of mown grassland for the benefit of either corncrakes or chough, a beneficiary must—

(a)

cut the grassland fields after—

(i)

1st August in the case of corncrakes, in which case the rate of payment for Option 1 in column 3 applies;

(ii)

15th August, in which case the rate of payment for Option 2 in column 3 applies; or

(iii)

1st September in which case the rate of payment for Option 3 in column 3 applies;

(b)

cut the hay and silage in a wildlife friendly manner in accordance with programme guidance;

(c)

leave a strip of uncut grass 2 metres wide around the field boundary; and

(d)

not apply pesticides to the 2 metre strip except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

(5)

The same field need not be managed each year if winter keep production is rotated around grassland area. Details of the fields to be rotated in this way, their location and areas must be given in the application for aid. If, during the relevant period, a different rotation to that originally agreed is approved by the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the area originally approved or the revised area, whichever is smaller.

F35For corncrakes—

Option 1 - £271 per hectare per year.

Option 2 - £381 per hectare per year.

Option 3 - £691 per hectare per year.

For chough—

Option 2 - £429 per hectare per year.

Option 3 - £691 per hectare per year.

20.

Management of grazed grassland for corncrakes

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary is a land manager on the Argyll Islands, Skye, Small Isles, Western Isles, Orkney and parts of the North Sutherland and West Argyll coast that support Corncrake populations and–

(a)

removes all livestock before 1st March;

(b)

manages an area of at least 0.5 hectares, at least 30% of which must comprise vegetation likely to be taller than 20 cm by early May and suitable for Corncrakes if ungrazed;

(c)

does not return livestock before 16th July;

(d)

keeps livestock density below 1.4 livestock units per hectare until the end of August; and

(e)

grazes the in bye land sufficiently in the autumn to prevent the sward becoming rank.

£313 per hectare per year.

21.

Creation and management of early and late cover for corncrakes

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary is a land manager on the Argyll Islands, Skye, Small Isles, Western Isles, Orkney and parts of the North Sutherland and West Argyll coast that support Corncrake populations and–

(a)

carries out this option on land adjacent to land on which the “Management of mown grassland for corncrakes” option in this Schedule is being undertaken;

(b)

carries out the option on an area at least 0.15 hectares but not exceeding 1 hectare. The area must either be sheltered by man made or natural features or by creating a strip within the field, at least 5 metres wide, protected from grazing in late winter and spring;

(c)

creates early cover during autumn/winter months using the following method–

(i)

only with the prior written agreement of the legal occupier, digs up and collects iris from existing beds, mixes the iris rhizomes with farmyard manure in at least equal proportions by volume and spreads the mixture over the site to a depth of at least 20 centimetres;

(d)

does not graze from 1st March until 30th September inclusive, except with the prior written agreement of the Scottish Ministers;

(e)

at other times, grazes at a level not exceeding 0.3 livestock units per hectare, except with the prior written agreement of the Scottish Ministers; F36...

(f)

cuts the area only with the prior written agreement of the Scottish Ministers F37; and

(g)

does not apply pesticides to the managed area except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

(3)

The combined area of existing and created early and late cover for Corncrakes managed under an undertaking must not exceed 6 hectares.

(4)

The site must be improved grassland or arable land managed to ensure that it is normally in damp condition for the establishment of iris beds and other tall vegetation. Where iris is not available locally, other appropriate tall vegetation may be used, but only with the prior written agreement of the Scottish Ministers.

£800 per hectare per year.

22.

Management of early and late cover for corncrakes

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary is a land manager on the Argyll Islands, Skye, Small Isles, Western Isles, Orkney F38North Sutherland and West Argyll that support Corncrake populations and the land is either reverted improved grassland or unimproved in bye grassland with clumps of suitable tall vegetation and the beneficiary–

(a)

carries out this option on one or more blocks of land adjacent to land on which the “Management of mown grassland for corncrakes” option in this Schedule is being undertaken;

(b)

ensures each individual area of early and late cover is at least 0.15 hectare but no more than 1 hectare, with a maximum total area of 5 hectares. The beneficiary may create an additional 1 hectare of early and late cover under the “Creation and management of early and late cover for corncrakes” option in this Schedule;

(c)

does not graze from 1st March until 30th September inclusive, except with the prior written agreement of the Scottish Ministers;

(d)

at other times, grazes at a level not exceeding 0.3 livestock units per hectare, except with the prior written agreement of the Scottish Ministers; F39...

(e)

cuts the area only with the prior written agreement of the Scottish Ministers F40; and

(f)

does not apply pesticides to the managed area except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

£162 per hectare per year.

23.

Management of open grazed or wet grassland for wildlife

(1)

This is a 5 year commitment.

F41(2)

A beneficiary is eligible for payment under this option on in-bye grassland if the beneficiary either—

  1. (a)

    agrees a grazing plan with the Scottish Ministers that describes a livestock management and grazing regime, taking into account the preferences of individual target species, site conditions and farming operations; or

  2. (b)

    excludes farm livestock for 6 consecutive weeks between 15th March and 15th June inclusive or restricts numbers to a maximum of 1 livestock unit per hectare during the whole period of three months.

(3)

The beneficiary must—

  1. (a)

    ensure the intensity of grazing is sufficiently low during the period of three months so that the nests of ground-nesting birds are not damaged;

  2. (b)

    not harrow or roll from 1st April until 31st July inclusive;

  3. (c)

    not apply artificial fertiliser to the site before 15th May and not apply farmyard manure and slurry from 1st March until 15th May inclusive;

  4. (d)

    not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species and where land is wetland or bordering water, the beneficiary must also consult SEPA prior to the application of pesticides; and

  5. (e)

    not top until after 31st July.

(4)

Where this option seeks to benefit farmland waders, the area managed must extend to at least 3 hectares and be at least 30 metres from any line or group of trees or hedgerows.

(5)

Where open grazed grassland is part of the normal rotation, the same field need not be managed each year if winter keep production is rotated around the grassland area. Details of the fields to be rotated in this way, their location and areas must be given in the application for aid. If, during the lifetime of the undertaking, a different rotation to that originally agreed is approved by the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the area originally approved or the revised area, whichever is smaller.

£111 per hectare per year.

24.

Mammal and bird control

(1)

This is a 5 year commitment.

(2)

There are three elements to this option–

  • A. Predator control

  • B. Crow control

  • C. Predator control for black grouse and capercaillie

with corresponding rates of payment in column 3.

(3)

A beneficiary is eligible for payment under–

  • A. Predator control on SSSI sites and European sites where there are ground nesting birds that are vulnerable to predation as endorsed by SNH;

  • B Crow control on SSSI sites and European sites where there are birds that are vulnerable to crow predation and likely to benefit from crow control as endorsed by SNH F42or, if the beneficiary is committed to provide food for hen harriers in the nest under option 25 (supplementary food provision for raptors), on a site within 2 km of a hen harrier nest; and

  • C Predator control for black grouse and capercaillie on sites containing active leks or on adjoining sites where control would be complementary;

if the beneficiary–

  1. (a)

    carries out mammal and bird control in a legal and humane manner and complies with the F43... General Licence as issued each year by the Scottish Ministers and the British Association for Shooting and Conservation (BASC) Codes of Practice on Shooting, Lamping, Trapping of Pest Mammals and Trapping of Pest Birds M8.

either–

  1. (i)

    as part of a habitat management programme aimed at achieving favourable condition of the natural heritage interests on the site. Effort must be targeted where it will give most benefit to the notified features rather than being focused on agricultural benefits; or

  2. (ii)

    F44as support of the hen harriers’ element of the supplementary food provisions for raptors option only for the duration of that undertaking

  3. (b)

    ensures, for elements A and C that the habitat management programme includes details of the predator control programme which should set out–

    1. (i)

      the areas where control will be undertaken;

    2. (ii)

      the species to be controlled;

    3. (iii)

      the methods that will be used;

    4. (iv)

      the most appropriate period for the activity within the targeted spring/early summer period (control outwith this period will not be funded);

    5. (v)

      a summary of any other predator control effort in the remainder of the year;

    6. (vi)

      the number of days and nights that the activity will be undertaken in each month;

    7. (vii)

      plans, for those activities that are planned on a weekly basis, such as lamping or shooting, which must be kept up to date throughout the control period and available for inspection on request. Dates when other activities will take place such as setting and managing snares, must be included in the management programme;

    8. (viii)

      the impact that the mammal and bird control will have, looking for reductions in numbers of fox scats and prey remains and increases in numbers of breeding birds;

    9. (ix)

      a description of any predator control effort in the past 5 years and a description of the existing predation problem as it affects breeding birds,

  4. (c)

    ensures for element B that the habitat management programme details the proposed trap locations on a map;

  5. (d)

    ensures for elements B and C that crow traps will be operated within the requirements of the BASC Code of Practice on the Trapping of Pest Birds in particular–

    1. (i)

      traps will be of a legal design and operated legally;

    2. (ii)

      the beneficiary will provide all decoy birds with shelter, food and water at all times;

    3. (iii)

      the beneficiary must have enough staff to inspect traps every day;

    4. (iv)

      captured crows must be killed quickly and humanely; and

    5. (v)

      all non target species will be released immediately and unharmed;

  6. (e)

    for elements A, B and C above an annual report must be provided which must include–

    1. (i)

      details of the methods employed;

    2. (ii)

      time spent on mammal and bird control across the specified period;

    3. (iii)

      number and species controlled and date of control;

    4. (iv)

      location of effort – where traps are located and where other methods are applied;

    5. (v)

      the impact of the mammal and bird control, in terms of numbers taken, counts of fox scats and crows and numbers of nesting birds; and

    6. (vi)

      records of the above must be kept up to date throughout the period that control is undertaken and they must be available for inspection on request;

  7. (f)

    for elements A and C above a summary of any other predator control effort carried out in the remainder of the year must be provided.

A. £2 per hectare.

B. £270 per year.£270 per trap per year with no more than 1 trap per hectare F45or per hen harrier nest site when used to support the hen harriers’ element of option 25.

C. Actual costs up to £7.50 per hectare per year.

Rates of payment correspond to the 3 elements in column 2.

25.

Supplementary food provision for raptors

(1)

This is a 5 year commitment.

(2)

There are 2 elements to this option–

  • A. Supplementary food provision for Hen Harriers

  • B. Provision of deer carcasses for Golden Eagles

with corresponding rates of payment in column 3.

(3)

For element A above, a beneficiary is eligible for payment under this option if the Moorland Management Plan identifies a conflict between Grouse moor management and Hen Harriers' predation of Grouse chicks and if the beneficiary–

F46(a)

is a land manager of moorland which has breeding hen harriers;

(b)

agrees with SNH the number and location of hen harrier nests for which food will be provided;

(c)

checks feeding posts and provides food in the nesting area on a daily basis, in accordance with the practice described in F47Diversionary Feeding of Hen Harriers on Grouse Moors” (Scottish Natural Heritage 2004);

(d)

carries out feeding for 100 days, covering both the pre-nesting period as well as the breeding season. If a nest should fail within the 100 day period, then feeding must cease subject to agreement by SNH and payments will be reduced accordingly;

(e)

agrees the start date with SNH for feeding at each site; (the start date being the date that birds arrive on territory);

(f)

purchases appropriate food and ensures that it is appropriately stored and retains purchase receipts for inspection;

(g)

records the work undertaken using the recording forms provided by SNH and identifies on a map the sites where feeding has taken place F48; and

(h)

continues crow control on site.

(4)

For element B–A beneficiary is eligible for payment under this option if the beneficiary–

(a)

is a land manager within a Golden Eagle SPA or potential SPA where SNH considers it will benefit the Golden Eagle population;

(b)

draws up a plan and agrees it with the Scottish Ministers or SNH, outlining the number of deer carcasses to be left on the hill each month (either one or 2 per month) for 4 months (November February) and how and where carcasses will be left;

(c)

undertakes this work in conjunction with existing annual hind culls and in accordance with best practice and all relevant legislation and does not use this as an incentive to cull additional deer; and

(d)

keeps a record of work undertaken, giving the dates and showing where carcasses were left and retains these records for inspection.

F49A: £1,076 per nest per year and no more than one feeding site per five hectares.

B: £32 per carcass up to eight carcasses per year and no more than one carcass per hectare.

F50. . .

F50. . .

F50. . .

27.

Control of invasive non-native species

(1)

This is a 5 year commitment.

(2)

There are 2 elements to this option:–

  • A named invasive non native plant control; and

  • B grey squirrel controlwith corresponding rates of payment in column 3.

(3)

For element A a beneficiary is eligible for payment under this option for named invasive non native plant control if the beneficiary is a land manager and–

(a)

is within the specific targeted area where the plant species have been identified as a particular threat by SNH, SEPA or the Forestry Commission Scotland. Within these areas applications must be part of a collaborative area project/plan. Applications must either complement an existing plan or be part of a new co ordinated plan/project within an area, catchment wide or other self contained area/habitat;

(b)

requires funding in order to undertake work where action is consequential on another option in this schedule. When action is required to control the named invasive non-native plant species for another option in this schedule to succeed; or

(c)

is the first land manager in the area to have their land colonised by one of the named invasive non native plant species.

(4)

For element A, for Japanese knotweed, giant hogweed and Himalayan balsam the beneficiary must provide the following evidence:

(a)

with the application for aid, on a 1:10,000 OS map, in the first year, map the current distribution of the plant species being treated before control work starts and each year thereafter, map the affected area following control work;

(b)

keep a work programme that contains–

(i)

spraying records and evidence of agreement from appropriate statutory bodies to spraying regimes around water courses or protected areas;

(ii)

evidence of regrowth monitoring;

(iii)

disposal transportation records and copies of Waste Transfer documentation;

(iv)

approval from SEPA for any spoil sites;

(v)

copies of the risk assessment carried out according to the requirements of the Control of Substances Hazardous to Health Regulations 2002 M9; and

(vi)

copies of certificates of spraying for individuals undertaking work or directly supervising spraying.

(c)

if spraying is to be undertaken near a watercourse, obtain SEPA agreement to the operation prior to any spraying. If spraying is proposed on or near a designated area, the beneficiary must obtain SNH agreement to the operation prior to any spraying. Written evidence of the SNH and SEPA agreement must be provided; and

(d)

start the control work in the first year of the undertaking. At the end of year 5 there must be no Japanese knotweed, giant hogweed or Himalayan balsam, as appropriate, present on the treated area.

(5)

For Japanese Knotweed under element A control measures must kill the plant. Cutting, flail mowing or strimming must not be undertaken.

Eradication must be by one or more of the following–

  1. (i)

    chemical control – spray with a herbicide only in the growing season when green leafy material is present. The herbicide must be an approved Glyphosate based herbicide and must be used according to the Code of Practice for Using Plant Protection Products in Scotland published by the Scottish Ministers M10 and the label instructions. There must be a minimum of 2 sprays in each growing season, further spraying is allowed if necessary. The plant must be monitored regularly for signs of regrowth during the period of the undertaking, and any regrowth must be resprayed. Glyphosate must not be applied until early/mid May or when the plant is 0.5 1.5m tall. Both the top and underside of the leaves must be sprayed;

  2. (ii)

    digging – the beneficiary must consult SEPA before undertaking this method. Above ground leaf and stem material must be cleared. All ground material including all roots, fibre, soil and earth containing any roots/fibre must be removed. The soil around the plant for up to 7 metres must be removed off site. Any plant regrowth during the period of the undertaking must be sprayed with herbicide as detailed in the chemical control method;

  3. (iii)

    disposal – Japanese knotweed must not be composted. Infested material must be removed from the site for disposal, unless otherwise agreed by SEPA. Japanese knotweed infested soil and plant material to be discarded as “controlled waste” as defined under the Environmental Protection Act 1990 M11and the Controlled Waste Regulations 1992 M12 and must be removed from site for disposal by a SEPA licensed haulier to a licensed or permitted landfill site and must be accompanied by appropriate Waste Transfer documentation prepared by the licensed haulier. All containers and bags contained infested material must be covered to avoid spread along public roads.

(6)

For element A, for Giant Hogweed control measures must reduce or kill the plant, prevent flowering and seed dispersal. Strimming must not be undertaken.

A risk assessment must always be carried out prior to commencing work and records of this must be kept according to the requirements of the Control of Substances Hazardous to Health Regulations 2002 M13requirements.

Eradication must be by one or more of the following–

  1. (i)

    chemical control – spray with a herbicide only during the growing season when green leafy material is present. The herbicide must be an approved Glyphosate based herbicide and must be used according to the Code of Practice for Using Plant Protection Products in Scotland, published by the Scottish Ministers M14 and the label instructions. There must be a minimum of 2 sprays in each growing season. Glyphosate must be applied before the plant flowers and sets seed. It should not be applied until the plants are 0.5 metres – 1.5 metres tall. Both the top and underside of the leaves must be sprayed. Plants must be monitored for signs of regrowth during the period of the undertaking. Regrowth must be sprayed when the plant/seedlings reach 0.5 metres tall;

  2. (ii)

    cutting/mowing –this must only be undertaken following consideration of the risk assessment results;

  3. (iii)

    digging out – SEPA must be consulted before this method can be undertaken. Above ground leaf and stem material must be removed. All ground material including any roots, fibre, soil and earth containing any roots/fibres must be removed. The soil around the plant for a diameter of 4 metres around the plant must be removed. The crown must be dug out below ground, roots must be cut all the way through by hand, a minimum of 3.8 centimetres below ground. Any plant regrowth during the period of the undertaking must be sprayed with herbicide as detailed in the chemical control method;

  4. (iv)

    disposal Giant hogweed must not be composted. Infested material must be removed from the site for disposal, unless otherwise agreed by SEPA. Giant hogweed infested soil and plant material must be discarded as “controlled waste” as defined under the Environmental Protection Act 1990 M15and the Controlled Waste Regulations 1992 M16 and must be removed from site for disposal by a SEPA licensed haulier to a licensed or permitted landfill site and must be accompanied by appropriate Waste Transfer documentation prepared by the licensed haulier. All containers and bags must be covered to avoid spread along public highways.

(7)

For element A, for Himalayan Balsam, control measures must reduce or kill the plant, prevent flowering and seed dispersal.

Eradication must be by one or more of the following.

  1. (i)

    chemical control – spray with a herbicide only in the growing season when there is green leafy material present. The herbicide must be an approved Glyphosate based herbicide and must be used according to the Code of Practice for Using Plant Protection Products in Scotland published by the Scottish Ministers M17, and the label instructions. There must be a minimum of one spray during the growing season before the plant flowers and sets seed. Spot spraying must be undertaken unless the plants grow in a dense sward. Plants must be monitored for signs of regrowth during the period of the undertaking and further spraying must be undertaken to kill seedlings when the seedlings/plants are visible;

  2. (ii)

    cutting/mowing – must only be undertaken before the plant reaches the flowering stage. Cut at ground level using a scythe. Cutting must be repeated annually throughout the period of the undertaking until no more growth occurs;

  3. (iii)

    pulling any germinating seeds must be pulled up. The roots must be pulled up with the plant;

  4. (iv)

    grazing – grazing by cattle and sheep is effective from April throughout the growing season and must be continued until no new growth occurs;

  5. (v)

    disposal – Himalayan balsam plants must only be composted or burnt when no seeds are present. Following eradication, beneficiaries must ensure soil which may contain Himalayan balsam seeds is not used until the year following the year where no new seedlings appeared.

(8)

For Rhododendron under element A the beneficiary must–

(a)

with the application, submit a 1:10,000 OS map, showing the current outlying area affected by Rhododendron proposed for treatment before control work starts, and highlight the area proposed for treatment;

(b)

provide evidence that they have followed the guidance in the Forestry Code of Practice Guide Managing and controlling invasive rhododendron published by the Forestry Commission M18;

(c)

if spraying is to be undertaken near a watercourse, obtain SEPA's agreement to the operation prior to any spraying. If spraying is proposed on or near a designated area, the beneficiary must have obtained SNH agreement to the operation prior to any spraying.

(d)

begin control work in the first year of the undertaking. At the end of year 5 there must be no Rhododendron present on the treated area.

Eradication must be by one or more of the following–

  1. (i)

    manual eradication – this method must be used on sensitive sites and/or where mechanised clearance methods are not possible. Plants must be cut low to the ground. Subsequent operations must ensure that no regrowth results from flailed stools, this includes manual clearance and the use of herbicide treatments;

  2. (ii)

    F51mechanised control – these methods may include the use of flails fitted on machinery and/or herbicide treatment on re-growth. A second application of herbicide must be applied when required; or

  3. (iii)

    chemical control of standing Rhododendron – this may include the use of stem injection or foliar application of herbicide to kill off established Rhododendron bushes. Follow-up applications of herbicides or hand pulling of seedlings must be undertaken to ensure there are no successful seedlings or sprouting bushes on site.

(9)

For element B a beneficiary is eligible for payment under this option for grey squirrel control if the beneficiary is a land manager and their land is–

(a)

within one of the control areas defined under the Red Squirrel Action Plan 2006 2011 published by SNH M19, and there is evidence of grey squirrels on their land; or

(b)

has a stand of broadleaf woodland identified by Forestry Commission Scotland as being part of a UK Biodiversity Action Plan Priority Habitat M20 or high biodiversity value, being mixed broadleaved woodland in a designed landscape.

(10)

For grey squirrel control–

(a)

SNH or Forestry Commission Scotland must agree that the application for aid is valid by consideration of current grey squirrel levels, current damage levels and current risk to the red squirrel population;

(b)

the beneficiary must with the application include, a work programme. The work programme must meet the objectives and priority actions in the Red Squirrel Action Plan, 2006 2011 published by SNH. The work programme must identify by grid reference the location of the woodland, the number of traps being deployed, the location of each trap and the dates between which traps will be set and details about any collaboration with neighbouring land owners or grey squirrel control officers authorised by SNH must be included;

(c)

keep a record of ongoing activity and regularly update it. Traps must be checked daily. A record of dates when animals were trapped and numbers of grey squirrels caught must be kept. Detailed sightings records of grey squirrels must be kept, including dates and locations. When no record of grey squirrel presence is obtained for existing activities, a transect survey as detained in the Forestry Commission Practice Note 11 Practical Techniques for Surveying and Monitoring Squirrels M21 will be required to verify the presence and extent of grey squirrels and any information must be submitted on a OS 1:10,000 map;

(d)

within areas of the south of Scotland as defined by SNH and the Forestry Commission Scotland submit, grey squirrels trapped in locations which contribute to the squirrel pox surveillance programme when requested by and under the supervision of the grey squirrel control officers authorised by SNH; and

(e)

submit maps, dates trapped and numbers caught and dispatched, and records of all samples sent for squirrelpox testing where relevant must be submitted with claims for payment; and

(f)

adhere to the following conditions in relation to the trapping method–

(i)

live multi capture traps must not be used where red squirrels are present;

(ii)

a minimum of 4 trapping sessions per year per trapping unit area must be carried out. If grey squirrels are present all year a minimum of 6 trapping sessions per year per trapping unit area must be carried out;

(iii)

live capture traps for protection of broadleaf stands must only be set between April and September; and

(iv)

any grey squirrels captured in traps must be humanely dispatched without delay.

(g)

comply with the guidance set out in Forestry Commission Practice Note 4 Controlling Grey Squirrel Damage to Woodlands, Forestry Commission Practice Note 5 Red Squirrel Conservation and the survey methods set out in the Forestry Commission Practice Note 11 Practical Techniques for Surveying and Monitoring Squirrels M22;

(h)

comply with the Pests Act 1954 M23;

(i)

keep evidence that all trapping is carried out in accordance with the requirements in (f) above and that all guidance specified in (g) above has been complied with and that the legislation specified in (h) has been complied with.

For Japanese knotweed, giant hogweed, Himalayan balsam, £160 per hectare per annum.

For the control of grey squirrels for red squirrel conservation using a single capture trap, £185 per trap site per annum.

For the control of grey squirrels for the protection of identified stands of high biodiversity value broadleaf woodland using multi-capture traps, £111 per trap per annum.

Rhododendron payments are capital items and the item and payment rates are set out in Schedule 3.

28.

Management of species rich grassland

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on species rich unimproved grassland if the beneficiary–

(a)

agrees a grazing plan with Scottish Ministers which sets out a livestock management and grazing regime, limiting grazing in order to promote the growth, structure and species composition of vegetation on the land. The plan must reflect the specific biodiversity requirements of the site and may be subject to change as the site develops;

(b)

manages grazing levels to create a sward at a range of heights, including some short grassland and some dense tussocks;

(c)

ensures the sward is at its longest in the summer and shorter in the spring and autumn;

(d)

where grazing is impractical, cuts the grassland once between mid July and mid August to a height between 5 and 10 cm, and once again in the autumn or the following spring. Cuttings must be turned in the field in order to allow their seed to drop and then removed;

(e)

in areas where Corn Buntings breed, does not graze or mow from 16th April until 15th August inclusive and includes this requirement in the plan;

F52(f)

does not apply fertilisers, slurry, farmyard manure or lime;

(g)

does not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species; and

(h)

does not use the site for supplementary feeding.

£111 per hectare per year.

29.

Bracken management programme for habitat enhancement

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on land where the management of bracken will enhance an existing habitat of conservation value, prevent loss of habitat or benefit associated species and, if the beneficiary–

(a)

prepares and implements a systematic programme of treatment and follow up actions, as specified within a Bracken Management Plan (BMP) to be submitted with the application. The plan must describe the following, and, where directed, show on a 1:10,000 scale map–

(i)

the habitat of conservation value that will benefit from the bracken management – in hectares and on the map;

(ii)

the extent of the bracken and density of the bracken cover – in hectares and on the map;

(iii)

the area of bracken to be actively managed – in hectares and on the map;

(iv)

the type of management proposed (eradication or control or no interference) and treatments proposed to achieve this, including follow up action;

(v)

where bracken is to be eradicated or controlled, the type of vegetation expected to replace it;

(vi)

the locations of any sensitive areas and appropriate buffer zones, including–

(aa)

where plant or animal species of conservation value are present and are likely to be damaged by the control method;

(bb)

in gullies or steep slopes where regeneration of more desirable vegetation will be difficult or impossible to achieve and soil erosion may result;

(cc)

close to ponds, lochs or watercourses, if chemical control is proposed;

(dd)

where there is a well developed woodland flora, under the bracken canopy; and

(ee)

archaeological features which might be damaged by mechanical control;

(b)

carries out primary treatment of bracken, where the need for more intensive initial control methods has been identified within the bracken management programme, in year 1 of a BMP;

(c)

if chemical control is proposed, obtains consent from the appropriate bodies including SEPA, the local water authority, SNH and the local authority environmental services; and

(d)

if mechanical eradication of bracken is proposed, carries out cutting or crushing 3 times per year, at appropriate stages during the growing season.

£28 per hectare per year.

30.

Creation and management of species rich grassland

(1)

This is a 5 year commitment.

F53(2)

There are two elements to this option—

  • A. for the benefit of wildlife;

  • B. for the benefit of bees, moths and butterflies.

(3)

A beneficiary is eligible for payment under this option if the beneficiary—

  1. (a)

    creates a new grassland sward from arable or improved grassland by—

    1. (i)

      destroying any existing grassland cover and carrying out a programme agreed with the Scottish Ministers to establish a new sward. This may include measures to reduce the fertility of the soil and address weed problems; and

    2. (ii)

      sowing the site with a low productivity grass and herb mix seed agreed with Scottish Ministers to create a new sward; or

  2. (b)

    restores an existing semi-improved grassland sward by—

    1. (i)

      creating a short sward through cutting or grazing;

    2. (ii)

      creating 50% bare ground on each sward by light mechanical disturbance such as raking, harrowing or scarifying; and

    3. (iii)

      sowing a low productivity grass and herb mix seed agreed with the Scottish Ministers on the bare patches.

(4)

When destroying grassland cover on an archaeological cropmark site, ploughing and cultivation must not exceed 150 mm.

(5)

There must be at least three indicator species of potential for restoration on grasslands.

(6)

The beneficiary must agree with the Scottish Ministers a grazing plan setting out a livestock management and grazing regime.

(7)

For element A, the beneficiary must ensure that the grass is at its longest in the summer and shorter in the spring and autumn.

(8)

For element B—

  1. (a)

    grazing levels between June and August must be light to maintain an uneven patchwork of short and tall vegetation between 5 and 25 cm with flowering heads;

  2. (b)

    beneficiaries must leave at least 15% of the field uncut and must rotate this area annually; and

  3. (c)

    the sward must not be cut before 15th August except in areas where Great Yellow Bumblebee is a priority where it must not be cut before 1st September.

(9)

The beneficiary must sow a seed mixture of native grasses and wildflowers where at least 15% of the mixture by weight must be seed of herbs and up to 85% non-aggressive fine-leaved grasses.

(10)

Seed of local origin must be used wherever possible.

(11)

For element B at least half the herb seed by weight must consist of one or more of the following species: Red Clover, Tufted Vetch, Bird’s foot Trefoil, Yellow Rattle, Meadow Vetchling, Selfheal and Common Knapweed; and must contain at least 2% Red Clover seeds.

(12)

The beneficiary must not—

  1. (a)

    apply fertiliser, slurry or farmyard manure to the site;

  2. (b)

    apply pesticides to the site except with the prior written agreement of the Scottish Ministers for activities such as spot treatment for injurious weeds or control of invasive non-native species;

  3. (c)

    carry out supplementary feeding on the site.

£223.57 per hectare per F54year or £245.56 per hectare per year on archaeological cropmark sites

31.

Management of habitat mosaics

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on in bye land where a mosaic of habitats occur if the beneficiary–

(a)

agrees a grazing plan with Scottish Ministers that describes the livestock management and grazing regime, identifies and reflects the specific biodiversity requirements of the site and identifies the biodiversity outcomes to be delivered. The application for aid must be supported by evidence to support the management proposed in the grazing plan. The grazing plan may be subject to change as the site develops;

F55(b)

does not apply fertilisers, slurry, farmyard manure or lime;

(c)

does not use the land for supplementary feeding. Where improved grass is present, feeding can take place on these areas provided there is benefit to the rest of the habitats in doing so. Details of any supplementary feeding must be included and justified in the grazing plan F56; and

(d)

does not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

£104 per hectare per year.

32.

Management of wetland

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on wetland on in bye land F57or on salt marsh and reed beds if the beneficiary–

(a)

agrees a livestock management and grazing plan with the Scottish Ministers. The plan must reflect the specific biodiversity requirements of the site and may be subject to change as the site develops. It must identify the type of wetland community and the area to be managed, the outcome that will be achieved and how it will be achieved;

F58(b)

does not apply fertiliser including slurry or farmyard manure to the site;

(c)

includes a statement in the grazing plan outlining the method to control rank vegetation growth;

(d)

removes cuttings where it is practical to do so;

(e)

provides no supplementary feeding on the site;

(f)

provides hibernacula where management is for the great crested newt;

(g)

creates a sward through grazing farm livestock with a range of heights across the wetland. The height of the sward at the end of the grazing period must range from 2 cm to up to 30 cm;

(h)

removes livestock from the site when poaching is likely to occur;

(i)

manages the build up of plant litter so that unless the area is a reed bed, rank growth and litter accumulation are not widespread;

(j)

manages the sward so that it is at its tallest during the summer, with short sedge swards extending to between 10 and 15 cm and fen sedge communities growing up to 50 cm. Reedbeds will be taller and often of a more uniform height;

(k)

aims for 30% of the vegetation to be in tussocks or patches over 50 cm in height. The vegetation should also include a mosaic of shorter and/or taller plant species;

(l)

enhances the management of drier rank areas by the addition of late summer cutting (in August and September) followed by a period of aftermath grazing until the ground becomes too wet for grazing;

(m)

outlines the necessary control measures where there may be a problem with the development of woodland or scrub on the wetland site;F59...

(n)

provides evidence to support the management proposed in the grazing plan with the application for aid F60; and

(o)

does not apply pesticides to the site except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

£90 per hectare per year.

33.

Creation, restoration and management of wetland

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on arable land or improved grassland if the beneficiary manages the site to ensure that it is saturated with water for a significant proportion of the year by either–

(a)

agreeing a livestock management and grazing plan with the Scottish Ministers. This is mandatory for the management of saltmarsh. Such plan must reflect the specific biodiversity requirements of the site and may be subject to change over time. The plan will identify the area that will be managed, the outcome that will be achieved and how it will be achieved. The outcome may be achieved by adjusting the grazing or cutting regime; or

(b)

not grazing or mowing the site for a period of at least 3 consecutive months from 1st April until 31st July inclusive, after which rank growth should be controlled. On fertile sites, cutting and removal may be allowed between these dates, where practicable, but only with the prior written agreement of Scottish Ministers.

(3)

For both (a) and (b) above, if rank vegetation builds up during the period of the undertaking, the grazing regime must be modified to address this. In addition, the beneficiary must–

(i)

not apply F61... fertiliser including slurry or farmyard manure to the site;

(ii)

not provide supplementary feeding on the site;

(iii)

provide hibernacula where management is for the great crested newt;

(iv)

ensure that the action to be taken to create the damp conditions will only affect the proposed site;

(v)

prevent the reversion to woodland or domination by a few aggressive species. If there is to be no grazing or mowing, the site may eventually become woodland. In such cases young trees must be removed F62; and

(vi)

not apply pesticides except in consultation with SEPA and with the prior written agreement of the Scottish Ministers for activities such as spot-treatment of injurious weeds or control of invasive non-native species.

£226.17 per hectare per year.

34.

Management/ restoration of lowland raised bogs

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on lowland raised bog if the beneficiary submits and implements a management plan which–

(a)

provides an audit of the current extent, condition and management of the bog and includes guidance on suitable grazing regimes and any additional work required to secure its maintenance and recovery, with bog conservation being the key management priority;

(b)

keeps the peat and vegetation of the bog surface intact and undisturbed and as wet as possible;

(c)

ensures that the following activities are not carried out–

(i)

muirburn, unless specified in the management plan;

(ii)

peat extraction;

(iii)

cultivation;

F63(iv)

the use of fertiliser including manure, or pesticides except for herbicides;

(v)

track creation, unless specified in the management plan;

(vi)

tree planting;

(vii)

dumping of any materials;

(viii)

overgrazing; F64...

(ix)

digging or clearing out ditches, unless specified in the management plan; F65and

(x)

the application of herbicides without consultation with SEPA and without the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native plants;

(d)

monitors the site each year to ensure peatland habitats are in good condition and submits an annual monitoring report with their claim for payment;

(e)

where ditch blocking is carried out, inspects dams twice a year and carries out maintenance work to prevent leaking.

(3)

The management plan may identify additional operations such as woodland clearance, seedling tree removal, scrub clearance and grazing management, however these operations need only be undertaken by the beneficiary where required on the individual site. If such operations are required then the beneficiary must do the following in each particular case–

(a)

woodland clearance beneficiaries will clear plantation and other woodland where it is affecting the hydrology of a raised bog and curbing its ability to support bog vegetation. Sites that support bog woodland; are ineligible;

(b)

seedling tree removal: beneficiaries will clear tree seedlings where they have the potential to significantly adversely affect the hydrology of a raised bog and its ability to support bog vegetation;

(c)

scrub clearance –remove scrub and prevent re-colonisation by herbicide treatment and/or the introduction of stock;

(d)

grazing management –continue to or introduce grazing to control the growth of heather and re-growth of scrub. Grazing must be removed if poaching is evident.

(4)

In addition, a beneficiary is eligible to receive a supplement if the beneficiary produces and implements a grazing management plan that–

(a)

details the maintenance of cover and abundance of characteristic bog plants;

(b)

keeps any regeneration of birch in check by grazing;

(c)

stops grazing where poaching is evident;

(d)

submits an annual record of grazing management including numbers and types of livestock and dates of livestock movements.

(5)

If ditch blocking is carried out, dams should be inspected at least twice a year. The beneficiary must carry out any minor maintenance work to prevent the dams from leaking. Evidence of such monitoring and maintenance should be submitted with the claim for payment form.

(6)

Where woodland clearance, seedling tree or scrub removal is carried out, the beneficiary should make an inspection of any tree seedling establishment, and/or tree and scrub re growth each summer. A report of this inspection shall be provided with the claim for payment form.

£40 per hectare per year except where the beneficiary produces and implements a grazing management plan in which case – £83 per hectare per year.

35.

Creation and management of water margins and enhanced riparian buffer areas

(1)

This is a 5 year commitment.

F66(2)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(3)

A beneficiary is eligible for payment under this option on in-bye land where the water margin comprises land which borders still water or a watercourse F67... and–

(a)

for a site bordering still water, has a width of between 12 and 24 metres;

(b)

for a site bordering a watercourse with a bed width of less than 1.2 metres, has a minimum overall width of 5 times the bed width of the watercourse and F68has a width of between 3 and 12 metres on any side; or

(c)

for a site bordering a watercourse with a bed width of at least 1.2 metres, has a width of between 6 and 12 metres on any one side;

(d)

for sites with steep ground or existing semi-natural habitat, the water margin width may be extended to 20m.

(4)

A beneficiary must–

(a)

provide a management plan to describe the existing vegetation and outline their management objectives and how they will be achieved; and does one or both of (b) and (c)–

F69(b)

enhance biodiversity interest by—

(i)

on sites with species-rich grassland, carrying out very occasional, light grazing to maintain a sward at a range of heights, avoiding poaching the ground, and controlling rank, tussocky growth and maintaining close, even sward by grazing in late summer/early autumn to reduce the sward height to between 10 and 15cm;

(ii)

on all other sites, carrying out a grazing regime in accordance with programme guidance;

(c)

F70on a site which is identified as a high priority in a diffuse pollution mitigation plan, reduce diffuse pollution by controlling rank, or tussocky growth to maintain a close, even sward, either by light grazing or by mowing to reduce the sward height to between 10 and 15 cm in late summer/early autumn. and removing cuttings from the site, or by agreeing an alternative management plan with Scottish Ministers where the particular conservation interest of the site would not be met by this approach.

For both (b) and (c) a beneficiary must–

  1. (i)

    control grazing to limit poaching and avoid damage to river and loch banks;

  2. (ii)

    ensure farm livestock have access to adjacent field whilst grazing the buffer area;

  3. (iii)

    F71not apply lime or fertilisers, including slurry or farmyard manure, or pesticides in or near the water margin except for herbicides which may be applied in consultation with SEPA and with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

  4. (iv)

    F72...

  5. (v)

    not cultivate the area;

    1. (vi)

      not clear existing drains or cut new drains;

    2. (vii)

      not modify or reinforce the river or loch banks;

    3. (viii)

      install water troughs or fence off an access point where farm livestock are prevented from accessing traditional watering places by the water margin option. The access area must be separate from, and not part of, the buffer area;

    4. (ix)

      not provide supplementary feeding on the buffer area; and

  6. (x)

    use native species, of local origin where planting small trees to extend or enhance the habitat and avoid excess shading of the water.

£286.63 per hectare per year.

36.

Management of flood plains

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on land that forms all or part of a flood plain that may flood without adversely affecting other agricultural land and if the beneficiary–

(a)

ensures that the natural flooding of the land is not hindered;

(b)

ensures that cultivations are not carried out within 12 metres of the water's edge (mean summer water level); and

(c)

agrees any additional management specific to the site with Scottish Ministers.

£39 per hectare per year.

37.

Management of buffer areas for fens and lowland raised bogs

(1)

This is a 5 year commitment.

(2)

Where this option is being carried out in a field which is in a nitrate vulnerable zone the margin/buffer must start after the 2m margin/buffer on which no fertiliser may be applied in accordance with the Nitrates Action Programme.

(3)

A beneficiary is eligible for payment under this option, on improved in-bye (including areas of rush pasture) or arable land surrounding a fen or lowland raised bog if the beneficiary–

(a)

manages the fen or lowland raised bog area in accordance with the Management of Wetlands option or the Management/restoration of lowland raised bogs option – in this Schedule;

(b)

manages the surrounding area as a grass/semi-natural vegetation buffer. The external boundary of the buffer area must be at least 10 metres in width;

(c)

leaves existing semi-natural swards intact. If no sward exists at the time of agreeing the management, establishes buffer vegetation the first spring following the commencement of the undertaking by sowing a suitable mixture of native grass/sedge and wildflower seeds;

(d)

ensures field drains and culverts are broken and brought to the surface to reduce the direct flow of water, nutrients and chemicals into the wetland and encourage drainage water to flow across the established sward in the buffer;

(e)

does not apply F73..., fertiliser, slurry or manure to the buffer area;

(f)

does not cultivate within the buffer area unless the existing use is arable; F74...

(g)

carries out scrub control only with the prior written agreement of the Scottish Ministers F75; and

(h)

does not apply pesticides except in consultation with SEPA and with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

£267.90 per hectare per year.

F7638.

Management of coastal heath, serpentine vegetation or special interest heath

(1)

This is a 5 year commitment.

  1. (2)

    F77A beneficiary is eligible for payment under this option on coastal heath, serpentine vegetation or special interest heath if the beneficiary—

    1. (i)

      on land dominated by heath vegetation, manages grazing levels to enable plants to flower and set seed in the summer. The area must be sufficiently grazed over the autumn to remove rank growth and lightly crop dwarf shrubs; and

    2. (ii)

      on land dominated by grass vegetation, manages grazing levels in accordance with programme guidance to ensure the sward is at its longest in the summer to enable plants to flower and set seed and is shorter in the spring and autumn to allow grassland species to germinate and to remove rank growth.

  2. (3)

    For all heath types but subject to paragraph (4), the beneficiary must—

    1. (a)

      exclude farm livestock from the area from 1st April until 31st August inclusive;

    2. (b)

      graze livestock on the site from 1st September until 30th November inclusive at a level not exceeding 1.2 livestock units per hectare during this period; and

    3. (c)

      where appropriate in accordance with programme guidance, ensure that, if the site is grazed from 1st December until 31st March inclusive, the grazing level does not exceed 0.15 livestock units per hectare during this period except with the prior written agreement of the Scottish Ministers.

  3. (4)

    Where the requirements in paragraph (3) would not reflect the specific biodiversity requirements of the site in the opinion of the Scottish Ministers at the time of the application, the beneficiary must set out in a grazing plan, to be agreed with the Scottish Ministers, a farm livestock management and grazing regime. The grazing plan may not be varied in any year of the 5 year commitment except with the prior written agreement of the Scottish Ministers.

  4. (5)

    A grazing plan is obligatory when management is for Scottish primrose.

  5. (6)

    For all sites, a beneficiary must—

    1. (a)

      adjust grazing management to ensure coarser grasses do not shade out desired plant species;

    2. (b)

      not provide supplementary feeding on the site without the prior written agreement of the Scottish Ministers;

    3. (c)

      not burn the site without the prior written agreement of the Scottish Ministers;

    4. (d)

      not apply fertiliser, lime, slurry or farmyard manure to the site; and

    5. (e)

      not apply pesticides to the site except for herbicides with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

  6. (7)

    Where a site occupies only a small part or parts of the field or management unit, the whole field or management unit may be managed under the provisions of this option where the Scottish Ministers consider this would be beneficial.

  7. (8)

    Extensive mosaics of heath and grassland are not eligible.

£77 per hectare per year up to 30 hectares.

£44 per hectare per year for next 40 hectares.

£1.30 per hectare per year thereafter.

39.

Management of lowland heath

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on an area of lowland heath if the beneficiary–

(a)

agrees with the Scottish Ministers a farm livestock management and grazing regime set out in a grazing plan drawn up in consultation with a recognised conservation organisation;

(b)

excludes farm livestock from the area from 1st November to the end of February inclusive;

(c)

does not exceed grazing levels of 0.3 livestock units per hectare at other times;

(d)

does not allow bracken or scrub to exceed 20% cover of the total site area and where this occurs carries out ongoing management;

(e)

does not apply fertiliser, slurry or farmyard manure to the site.

£123 per hectare per year.

40.

Wildlife management on upland and peatland sites

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on sites that are dominated by peat or thin upland soils that are sensitive to erosion if the beneficiary–

(a)

prepares and implements a Moorland Management Plan (MMP) that takes account of both wildlife and farm livestock management and which provides–

(i)

an audit of the current extent, condition and management of the upland and peatland habitats on the holding;

(ii)

guidance on suitable grazing regimes;

(iii)

details of any additional work required to secure their maintenance and recovery, with wildlife conservation as the key management priority;

(iv)

addresses, in an integrated way, all the impacts that can lead to erosion of peat and upland soils including: trampling by deer, tracking by All Terrain Vehicles (ATVs), muirburn and peat cutting;

(v)

consideration of the impacts of any woodland present on the site, and identify zones where tree and seedling tree removal or clearance would benefit the site's conservation value;

(vi)

identification of zones where ditch blocking would be beneficial and details methods to be used;

(b)

where the land is also grazed by farm livestock, undertakes the Management of moorland grazings option in this Schedule, in relation to that land;

(c)

uses only low ground pressure vehicles on existing tracks of dry, hard ground, wherever possible, and outwith reseeded areas and only for essential agricultural management;

(d)

where peat is cut for domestic fuel, cuts existing peatbanks, provided that the turfs are replaced on the cut surface with the vegetation side uppermost; and

(e)

agrees a muirburn plan with SNH if the land involved forms part of an SSSI site or a European site or potential SPA. The plan must detail areas proposed for muirburn, and appropriate burning rotation, fire-free areas and additional resources available to control fires and–

(i)

no muirburn is to be undertaken between 16th April and 30th September inclusive; and

(ii)

burning must be carried out in strips no more than 20m wide.

£0.70 per hectare per year.

41.

Management of moorland grazing

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on moorland if the beneficiary–

(a)

prepares and implements a moorland grazing plan which must be in place by the commencement of the undertaking, and which takes account of the combined impacts of livestock and other grazing animals present on the land;

(b)

includes in the plan a report on the current condition and management of the moorland and the F78appropriate proposals for shepherding, managing livestock and feeding practices that will benefit the environment and wildlife, which the beneficiary will carry out; and

(c)

uses the moorland for agricultural livestock production.

£1.30 per hectare per year.

42.

Management of moorland grazings on sites designated for their uplands and peatlands

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option where the beneficiary undertakes farm livestock management on sites designated for their uplands and peatlands and if the beneficiary–

(a)

prepares and implements a Moorland Management Plan (MMP) that addresses, in an integrated way, all the impacts that can lead to erosion of peat and upland soils including: trampling by livestock, tracking by all terrain vehicles, muirburn and peat cutting;

(b)

agrees a muirburn plan with SNH if the land involved forms part of an SSSI site, a European site or potential SPA. The MMP must detail areas proposed for muirburn, and appropriate burning rotation, fire-free areas and additional resources available to control fires and–

(i)

no muirburn may be undertaken between 16th April and 30th September inclusive;

(ii)

burning must be carried out in strips no more than 20m wide; and

(iii)

the Muirburn Code published by the Scottish Ministers must be followed M24;

(c)

uses only low ground pressure vehicles on existing tracks of dry, hard ground, wherever possible, and outwith reseeded areas and only for essential agricultural management; and

(d)

replaces turfs cut in existing peatbanks, where peat is cut for domestic fuel, on the cut surface with the vegetation side uppermost.

£2 per hectare per year.

43.

Moorland stock disposal

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on moorland of conservation interest which would benefit from a reduced stocking density if the beneficiary–

(a)

removes the agreed number of ewes from the site and the IACS business and does not increase the number of ewes on the moorland or business during the undertaking;

(b)

prepares and implements a Moorland Management Plan. The plan must describe the current condition of the moorland and how it is managed; how many ewes the flock will be reduced by and explain why this will benefit the condition of the moorland; and

(c)

removes from the IACS business the livestock before 1st March in the first year of the undertaking.

£19.63 per hectare per year F79but only £15.71 per hectare per year if the beneficiary receives payment in accordance with commitments under option 41 or option 42 in this Schedule for the same land.

44.

Away wintering of sheep

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

prepares and implements a Moorland Management Plan which must–

(i)

justify the need for reduced winter grazing in terms of anticipated improvement in habitat condition; and

(ii)

detail an appropriate grazing regime that will sustain the moorland habitats and, where appropriate, lead to enhancement, describing indicators of success appropriate to the site;

(b)

removes an agreed number of ewes and/or hoggs from the notified moorland site and the IACS business for at least 22 weeks during the winter;

(c)

submits an annual record of management that includes details of the numbers and timings of stock away wintered; and

(d)

reviews the plan with SNH or Scottish Ministers and agrees any changes necessary to meet the indicators of success.

£21 per hectare per year.

45.

Off-wintering of sheep

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

prepares and implements a Moorland Management Plan which must–

(i)

justify the need for reduced winter grazing in terms of anticipated improvement in habitat condition; and

(ii)

detail an appropriate grazing regime that will sustain the moorland habitats; and, where appropriate, lead to enhancement, describing indicators of success appropriate to the site.

(b)

removes an agreed number of ewes and/or hoggs from the notified moorland site to in-bye land on the holding for at least 22 weeks during the winter;

(c)

submits an annual record of management that includes details of the numbers and timings of livestock off wintered; and

(d)

reviews the plan with SNH or Scottish Ministers and agrees any changes necessary to meet the indicators of success.

£9 per hectare per year.

46.

Muirburn and heather swiping

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

prepares and implements a muirburn plan. The plan must identify–

(i)

the total area of moorland in the IACS business and the areas suitable for burning and frequency of rotation;

(ii)

the average number of hectares planned to burn each year, the proposed methods of burning/swiping and the resources available to manage muirburn safely;

(iii)

fire-free areas to protect sensitive vegetation;

(iv)

firebreaks and access routes for fire-fighting;

(v)

the methods to be used to control the fires and fire sizes; and

(vi)

justification for planned fires outwith 0.4 hectare and 1.0 hectare in size. Fires must also be no more than 50 metres wide;

(b)

follows the Muirburn Code published by the Scottish Ministers M25 for all muirburning;

(c)

does not burn within fire free zone identified on plan and takes reasonable precautions to prevent fire spreading accidentally; and

(d)

carries out swiping from 1st September to 15th April only.

£67 per hectare per year.

Payment will be based on the average area to be burned each year.

47.

Management of Hedgerows

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment for established or beaten up hedges under this option if the beneficiary–

(a)

fills gaps in the hedge by coppicing, laying or planting;

(b)

when managing a hedge for landscape benefits, cuts the hedge on both sides a maximum of once every 2 years and cuts one half of the length of the hedgerow in any one year F80with a different section of the hedge cut each year so that the hedge is cut in rotation;

(c)

when managing for biodiversity benefits, cuts the hedge on both sides a maximum of once every 3 years and cuts only one third of the hedge in any one year;

(d)

manages hedges so they are at least 1.5 metres tall and at least 2 metres wide at the base;

(e)

trims hedges between 1st December and 1st March;

(f)

does not apply pesticides within 2 metres of an established hedge F81except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive, non-native species, and where the hedge is next to a watercourse, the beneficiary must also consult SEPA before applying pesticides;

F82(g)

uses, following consultation with SEPA where the hedge is next to a watercourse, an approved herbicide for any spot treatment of weeds within 1 metre of any new hedge plant;

(h)

does not mow or graze the hedge bottom;

(i)

sites any fences at least 1 metre from the centre line of the hedge;

(j)

manages both sides of the hedgerow, 1 metre on either side of the centre line, which equals a 2 metre strip in total to be managed;

(k)

plants new hedges as early as possible in the first year and no later than by the autumn immediately following the start of the undertaking. The hedge must be fully established within its first 18 months of development;

(l)

when undertaking new hedging or gapping up of existing hedges, establishes plants in a double row with a minimum of 6 plants per metre. A single species must not account for more than 75% of plants established. Species used must be native species of trees and shrubs, although beech and sycamore may be planted where these are appropriate and traditional in hedges locally. Plants should be used from the local area wherever possible;

(m)

protects plants from grazing livestock (farmed and wild) and rabbits; protection may be in the form of stockproof fencing with rabbit proof netting, where necessary;

(n)

controls weeds around each hedge plant for 3 4 years, by frequent cutting or mulching (including black polythene sheeting) or spot treatment using a herbicide approved for this purpose;

(o)

obtains road authority's consent for planting or replanting hedges within 5 metres of the edge of any major road; F83...

(p)

where necessary, coppices leggy hedges by cutting the main stem at a slight angle (to allow water to run off) 75 100 centimetres above ground level and erects fences where necessary to prevent stock from browsing the re growth F84; and

(q)

maintains existing hedgerows, trees and where new hedgerow trees develop, maintains at least one tree per 200 metres of hedgerow by marking the trees and not cutting them.

(3)

Both sides of the hedge must be within the boundary of the relevant farm. This option cannot be adopted for a hedge that itself forms a march whether it be a boundary hedge or a roadside hedge.

(4)

The cost of coppicing, laying and any later planting cannot be claimed under the Planting or re planting of hedge, Coppicing of hedge or Laying of hedge capital items as set out in Schedule 3.

(5)

Only new hedge planting or gapping up carried out during the first 18 months of development of a newly planted hedge can be claimed under the Planting or re planting of hedge capital item as set out in Schedule 3.

Trimmed once in 3 years £0.93 per metre per year.

Trimmed once in 2 years £0.93 per metre per year.

F8548.

Management of extended hedges and hedgerow trees

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on a strip of arable land or improved grassland situated alongside an existing or newly created hedge, if the beneficiary–

(a)

excludes all farm livestock from, and does not carry out arable cultivations within a strip extending to at least 3 metres from the centre line of the hedge;

(b)

trims the hedge between 1st December and 1st March inclusive and once trimmed, does not trim the hedge again for at least 3 years;

(c)

leaves the grass in the strip uncut, unless with the prior written agreement of Scottish Ministers;

(d)

does not apply fertiliser, slurry or farmyard manure to the site;

F86(e)

does not apply pesticides to the managed strip except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species, and where the hedge is next to a watercourse, has consulted SEPA before application of the pesticides;

(f)

creates an extended hedge during the first year of the undertaking and maintains and manages it for a minimum 5 years;

(g)

uses where possible appropriate native-species trees and shrubs in hedge gaps;

(h)

where only one side of hedgerow is being managed, cuts the other side no more than once a year between 1st December and 1st March F87; and

(i)

maintains existing hedgerow trees and allows new hedgerow trees to develop at irregular intervals and maintains at least one tree per 200 metres of hedgerow by marking the trees and not cutting them.

(4)

The cost of coppicing, laying and any later planting cannot be claimed under the Planting or re planting of hedge, Coppicing of hedge or Laying of hedge capital items as set out in Schedule 3.

(5)

Only new hedge planting or gapping up carried out during the first 18 months of development of a newly planted hedge can be claimed under the Planting or re-planting of hedge capital item as set out in Schedule 3.

Trimmed once in 3 years

£0.53 per metre per year.

49.

Management of grass margins and beetlebanks in arable fields

(1)

This is a 5 year commitment.

(2)

For this option, suitable areas must be identified through an environment/diffuse pollution audit.

(3)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

manages a strip between 1.5 metres and 6 metres in width in an arable field, with a minimum width of F883 metres or more where the management is to benefit Hen Harriers, Corn Buntings, Barn Owl or Kestrel F89, and plants at least one species of a nectar-feeding plant such as red clover if it does not exist currently on the strip;

(b)

ensures that where the entire field is not sown to an arable crop, the minimum width of the arable area adjacent to the grass strip is 30 metres;

(c)

F90where no strip currently exists, establishes a strip by sowing a suitable mix of grass seed, including at least one species of nectar-feeding plant such as red clover, into a sterile seedbed;

(d)

does not apply fertiliser, slurry or farmyard manure to the strips. F91...;

(e)

does not carry out scrub control except with the prior written agreement of Scottish Ministers. Beneficiaries are not eligible for additional payment to control scrub or weeds.

F92(f)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(g)

does not apply pesticides to the site F93except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

(h)

if grazing or topping the grass margin or beetlebank after harvest, ensures the average height of vegetation is not taken below 100 millimetres;

(i)

retains any area adjacent to the grass margins or beetlebanks in an arable crop for the duration of the undertaking;

(4)

In a mixed arable situation where an area will be put into grass or other non-eligible crop after 3 years, the beetlebank/margin may be transferred to another eligible field for the remaining 2 years of the relevant period of the undertaking. In this situation, a beetlebank/grass margin may only be F94relocated once during the relevant period of the undertaking. On organic farms where the normal rotation is a 2 year cycle, the beetlebank/margin may be moved twice during the relevant period of the undertaking to ensure that the area is in an eligible crop. Details of the beetlebank/grass margins to be “rotated” in this way including field identifiers and area measurements must be submitted with the application for aid.

£473.76 per hectare per year F95for establishment and management of a strip and £407.92 per hectare per year for management of an existing strip.

50.

Bio-diversity cropping on in bye

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on in-bye land if the beneficiary–

(a)

sows plots of spring cereals, fodder root crops or fodder rape each up to 2 hectares; their total area should not exceed 4 hectares over the whole unit;

(b)

only undertakes cultivations and spreads fertiliser between 1st March and 15th May inclusive. Exceptionally, for fodder rape or root crops, cultivations may be carried out after 15th May; any nests located must be marked and avoided;

F96(c)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(d)

does not apply pesticides to the site F97except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

(e)

after cropping does not plough or cultivate the area before 1st March of the following year;

(f)

maintains the same area of cropped land in each year of the undertaking unless as otherwise agreed by the Scottish Ministers.

(3)

Any cropping rotation and crop within that rotation which is traditional in the area is eligible. Arable silage is not an eligible crop.

(4)

Land which is in conversion to organic production under an undertaking under the “Conversion to and maintenance of organic farming” option in Schedule 2 to these Regulations or under the 1994 Regulations or the 2004 Regulations F98is not eligible.

£70.94 per hectare per year.

Where cereal crop is harvested by binder and stooks gathered into stacks £470.94 per hectare per year.

51.

Management of cropped machair

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on previously cultivated machair land (i.e. improved grassland, land in crop or lying fallow after an arable crop) if it is brought into the required crop/fallow rotation in the first, second or third year of the undertaking by the sowing of a spring crop and has been subject to cultivation within the last 10 years and if the beneficiary–

(a)

ensures the site is included in an arable rotation, comprising at least 15% of the ploughable area of the machair on the site and is sown to an arable crop or left fallow F99and the site may be sown to an arable crop for up to two consecutive years;

(b)

after harvesting the arable crop F100in the second year (where it applies), leaves the site fallow to revert to natural grassland for a minimum of 2 and a maximum of 3 years;

(c)

only undertakes any cultivation or rolling between 1st March and 15th May inclusive;

F101(d)

does not cultivate to a depth of more than 150 millimetres and where cultivation does not exceed 100 millimetres, a supplementary premium will be paid;

F102(e)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(f)

pesticides must not be applied to the site F103except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

(g)

seaweed and farmyard manure may be applied in accordance with traditional practice; and will be eligible for a premium payment in accordance with the rate of payment set out in Column 3.

(3)

A supplementary premium will be paid if a cereal crop is harvested by binder and the stooks gathered into stacks at the rate of payment set out in Column 3.

F104(4)

Where the area has been managed as cropped machair under a previous agri-environment scheme, annual payments will be made in arrears across the whole area of cropped machair (whether in crop or laying fallow) from the first year.

(5)

Otherwise, annual payments may commence at the end of the year in which the site is first sown down to spring crop, then annually thereafter for the balance of the five year undertaking.

Arable cropping £233 (without farmyard manure/seaweed) per hectare per year.

£279 (with farmyard manure/seaweed) per hectare per year.

£222 supplement when harvested with binder and stooks gathered into stacks, per hectare per year F105, £31 per hectare per year supplement when all ploughing is undertaken by a shallow cultivation depth of 100 millimetres, and £41 supplement per beneficiary per year when sharing equipment for shallow cultivation.

52.

Management of ancient wood pasture

(1)

This is a 5 year commitment.

(2)

Sites currently listed in, and candidate sites for the Inventory of Ancient Wood Pasture in Scotland M26 are eligible under this option.

(3)

This option may be adopted for ancient wood pasture sites where there are existing veteran trees and for areas which are contiguous with existing ancient wood pasture and now devoid of veteran trees but where there is historical evidence, from 1st edition 1860 maps, that such a habitat has existed.

(4)

A beneficiary is eligible for payment under this option if the beneficiary.

(a)

where the open pasture element of the wood pasture is grassland, improved or unimproved, on the in bye either–

(i)

excludes livestock for 6 consecutive weeks from 1st April until 15th June inclusive and at other times, sets grazing levels to maintain an average sward height of between 5 and 20 centimetres; or

(ii)

where the aim of this option would not be achieved by adopting (i) above set out and agree with Scottish Ministers a livestock management and grazing regime. Stocking rates must be set to maintain an average sward height of between 5 and 20 cm. Evidence to support the adoption of the management and grazing regime must accompany the application for aid;

And, for both (i)and (ii) above, the beneficiary must–

  1. (aa)

    F106not apply lime, artificial fertiliser, farmyard manure or slurry to the site;

  2. (bb)

    not carry out any topping before 31st July;

  3. (cc)

    not use the site for supplementary feeding of stock;

  4. (dd)

    where planting of small trees will serve to extend or enhance this habitat, use species appropriate to the site and, where available, of local provenance;

  5. (ee)

    protect newly planted trees or any successful regeneration either as individual trees or in groups. The stem density within such groups must not exceed 50 trees per hectare while the spacing between them must not be less than 20 metres;

  6. (ff)

    erect wooden post-and-rail fencing or metal tree guards where required to maintain and prolong the life of individual veteran trees;

  7. (gg)

    make provision through a deer control plan, agreed with F107Scottish Natural Heritage, for the control of deer grazing;

  8. (hh)

    F108not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

  9. (b)

    where the open pasture element of the wood pasture is acid grassland or heath, on the rough grazings, does the following–

    1. (i)

      F109does not apply lime, artificial fertiliser, farmyard manure or slurry to the site;

    2. (ii)

      excludes farm livestock between 1st November and 28th February inclusive. At other times, grazing levels should be set to maintain an average grass sward height of between 5 and 20 centimetres;

    3. (iii)

      does not use the site for supplementary feeding of stock.;

    4. (iv)

      where planting of small trees will serve to extend or enhance this habitat, use Species appropriate to the site and, where available, of local provenance;

  10. (v)

    protects newly planted trees or any successful regeneration, either as individual trees or in groups. The stem density within such groups will not exceed 50 trees per hectare while the spacing between them will not be less than 20 metres;

    1. (vi)

      erects wooden post-and-rail fencing or metal tree guards where required to maintain and prolong the life of individual veteran trees; F110...

    2. (vii)

      makes provision through a deer control plan, agreed with F107Scottish Natural Heritage, for the control of deer grazing F111; and

    3. (viii)

      does not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species.

£105 per hectare per year for in-bye land.

£50 per hectare per year for rough grazing.

53.

Management of scrub and tall herb communities

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option on scrub of high environmental value that can be maintained or enhanced where it would not be detrimental to existing landscape character or to sites of wildlife interest, if the beneficiary–

(a)

manages the grazing of scrub and open habitat mosaic to maintain an appropriate balance between these components, ensuring that scrub is in good condition and regeneration is present at a level sufficient to maintain current extent. The open habitats must be managed according to the programme guidance;

(b)

eradicates any Rhododendron present on the site;

(c)

avoids poaching by managing stock carefully when ground conditions are wet;

(d)

unless otherwise agreed with Scottish Ministers, retains all mature or over-mature standing trees and all standing and fallen deadwood, unless they are a genuine safety hazard. Tree surgery must be limited to that required for the safety of people and farm livestock;

(e)

in upland areas, marks all new fences with bird strike markers, where relevant to Capercaillie and Black Grouse;

(f)

does not apply fertilisers, slurry, farmyard manure, or lime to areas of scrub habitat except with the prior written agreement of Scottish Ministers;

(g)

does not apply pesticides to the site F112except for herbicides which may be applied with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

(h)

does not provide supplementary feeding on the site;

(i)

does not plough or carry out cultivation such as reseeding, rolling or chain harrowing work unless these are required to establish trees and shrubs and as agreed with Scottish Ministers;

(j)

does not cut new drains or modify or improve existing drainage systems although existing drains may be maintained;

and where appropriate–

  1. (k)

    cuts areas of scrub to encourage regeneration from the stump and carries out thinning to enhance structural diversity of the stand;

  2. (l)

    removes dense vegetation and scarifies the ground in order to help create favourable condition for natural regeneration of scrub species to occur;

  3. (m)

    mows or flails open areas each year – to be carried out in late summer or autumn to avoid destroying seeding herbs;

  4. (n)

    considers planting as a last resort or layering to regenerate stands, where there is no natural source of regeneration and if seeding cannot occur naturally.

£94 per hectare per year.

54.

Arable reversion to grassland

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

F113identifies risk areas through either a specialist diffuse pollution audit or a soil and water management plan; and

(i)

grassland must be established by sowing a suitable mix of grass seed, any areas of soil compaction must be addressed before grass seed is sown;

(b)

when the grass sward is established F114either under a previous agri-environment scheme or because the beneficiary converts fields (or areas within fields) that are prone to flooding, runoff or erosion risk from arable farming to grassland by sowing a suitable mix of grass seed and addressing any areas of soil compaction before seed is sown

(i)

controls grazing to limit poaching and avoid damage to river and loch banks;

(ii)

does not apply fertiliser, slurry or farmyard manure;

(iii)

does not apply pesticides except with the prior F115written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species. Spot treatment of scheduled and non-native invasive weeds is permitted without prior written agreement; and

(iv)

does not cultivate;

(v)

does not clear existing drains or cut new drains except with the prior written approval of Scottish Ministers.

F116For conversion and management of grassland £240.74 per hectare per year and for management only £207 per hectare per year.

55.

Conservation management plan with special measures for small units

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the area of in bye land occupied by the business is no more than 20 hectares (excluding any apportionments, house and steading) and the beneficiary–

(a)

prepares and carries out a conservation management plan for the whole unit (the entire in bye and any apportionments but excluding any share in the common grazings) and such plan–

(i)

sets out clear environmental objectives, and describes how the unit will be managed to meet these objectives; and

(ii)

addresses all relevant activities on the unit (i.e. grazing management, winter feed production, cropping, farm livestock management, management of special habitats/features including BAP habitats and species, and pollution control).

(3)

Within crofting communities, an application for aid which is one of at least 4 applications from the same crofting community will be deemed to be part of a collective application.

£25 per hectare per year plus a fixed sum of £180.

4 or more current applications from the same crofting community will be deemed to be part of a collective application: £25 per hectare per year plus a fixed sum of £275.

56.

Grazing management of cattle

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if it is undertaken in combination with the “Conservation management plan with special measures for small units” option in this Schedule and the beneficiary either–

(a)

keeps cattle in which case the beneficiary must continue to keep 2 or more breeding cows of Scottish traditional or native breed(s) on the holding for the lifetime of the undertaking; or

(b)

introduces cattle where no breeding cows are present, or the existing herd has only one or no dams of either pure breed or first cross native or traditional stock 2 or more breeding cows or heifers of traditional or native breeds must be run on the unit by the end of the first year of the undertaking with the heifers to calve down by the end of the second year of the undertaking and–

(i)

if determined by Scottish Ministers, the number of any sheep must be reduced in proportion to the number of cattle introduced to achieve sustainable stocking levels;

(ii)

for the remainder of the undertaking the beneficiary must continue to keep 2 or more breeding cows of Scottish traditional or native breed(s) on the holding.

(3)

Only the following breeds are acceptable under this option;

  • Aberdeen Angus

  • Ayrshire

  • Belted Galloway

  • Galloway

  • Highland

  • Luing

  • Shetland

  • Shorthorn

  • First crosses of these native breeds.

Also, the use of a continental bull across the herd is permitted.

Introduction of cattle £273 per hectare per year.

Retention of cattle £185 per hectare per year.

57.

Specialist agri environment plan

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the Scottish Ministers approve the preparation of a specialist agri environment plan prepared by a specialist or following specialist advice in such form and containing such information as the Scottish Ministers reasonably require and if the beneficiary–

(a)

develops and implements a specialist agri environment plan in order to deliver the desired outcomes in support of an application for aid which includes activities in any of the rural priorities options numbered 15 to 56 F117and 74 to 77; and

(b)

provides evidence that the concrete agri environment commitments set out in the specialist agri environment plan referred to in (a) above have been completed.

F118(3)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

This is a capital item £1.02 per hectare per annum for the first 150 hectares and £0.20 per hectare per annum for the next 100 hectares up to a maximum of £873.28 per plan over 5 years per application for aid.

58.

Habitat grazing management

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option for land within moorland and upland SSSI sites and European sites where a moorland plan has identified a need for extra shepherding to address localised overgrazing or undergrazing issues and other approaches would be ineffective or impractical and the beneficiary–

(a)

undertakes additional shepherding efforts to achieve outcomes specified in the moorland management plan; and

(b)

submits an annual record of management work detailing the number of hours when undertaken problems encountered any visible signs of change in target habitat and any changes in sheep behaviour.

(3)

This option cannot be used to address an overgrazing problem caused by feed locations or inappropriate stock numbers.

£7.82 per hour.

59.

Livestock tracks, gates and river crossings

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

identifies any livestock tracks, gateways or river crossings that are not suitably positioned, or could be improved, to prevent soil, nutrient or faecal contamination of watercourse and identifies more appropriate sites for these features;

(b)

identifies on a plan the location and nature of the risk factors for all sites (track, gate, and river crossing) and the activities to be undertaken, and describes how they will reduce the risk to the water environment; and

(c)

takes appropriate remedial action based on (a) and (b).

Up to 50% of actual costs except for gates which are a standard cost capital item.

60.

Woodland creation

(1)

This is a 10 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

establishes and maintains new woods using one or a mix of the following woodland types–

(i)

productive conifer woodland (low cost);

(ii)

productive conifer woodland (high cost);

(iii)

productive broadleaved woodland;

(iv)

native woodland F119(other than such woodland in the Northern and Western Isles);

(vii)

F120native woodland in the Northern and Western Isles;

(viii)

mixed conifer/broadleaved woodland in Central Scotland;

(v)

naturally regenerated native woodland;

(vi)

mixed conifer/broadleaf woodland;

(b)

ensures the design of the woodland F121(other than such woodland in Central Scotland) conforms to the design criteria in table B set out in Part 2 of this schedule; and.

(c)

ensures the planting complies with the UK Forestry Standard.

F122Payment rates for establishment up to F12380% (up to F12490% in Less Favoured Areas) of the standard cost of planting and maintenance (up to 100% of standard costs) are shown at Table C in Part 2 of this Schedule.

F125Payment rates for additional fencing capital items are up to F12380% (up to F12490% in Less Favoured Areas) of the standard cost shown for fencing related items in Table D in Part 2 of this Schedule.

Annual payments for agricultural income foregone for up to 15 years are Per hectare–Arable and improved on non Less Favoured Areas £300

Arable and Improved on disadvantaged areas of the Less Favoured Areas £230

Arable and improved on severely disadvantaged areas of Less Favoured Areas £160

Unimproved land £60

Payment rates for each woodland type are shown at Table C in Part 2 of this schedule.

F126A supplementary payment of £1,500 per hectare may be made for a community woodland.

61.

Sustainable management of forests and woodlands

(1)

This is a 10 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary has a forest holding of 1 hectare or greater and–

(a)

manages the land in accordance with an approved forest F127management plan that complies with the UK Forestry Standard; and

(b)

delineates and provides information on the environmental condition and environmental outcomes to be delivered in each of the following areas–

(i)

areas of native woodland consisting of woodland types that are recognised HAP priorities and are under active management towards or to maintain favourable condition;

(ii)

areas designated and agreed for positive management under low impact silvicultural systems (LISS);

(iii)

areas of woodland subject to a high level of access and recreational use, and where evidence of additional costs associated with environmental management are provided;

(iv)

in areas of native woodland and areas designated LISS a deer management plan must be produced (as a component of the Forest Plan) and to reduce deer numbers in these areas;

(c)

produces a costed action plan that demonstrates that the proposed expenditure exceeds £28 per hectare per year for the relevant period of the undertaking; and

(d)

delineates areas of even-aged planting undergoing restructuring felling during the period of the forest plan.

Up to £28 per hectare per year.

Up to £56 per hectare per year in areas of high level of public access overlap with either native woodlands or areas of LISS.

£41 per hectare per year where the removal of livestock results in agricultural income forgone.

Payment will be approved for 10 years but with a review after 5 years.

£130 per hectare for a period of 4 years for those areas undergoing restructuring felling. Payment will commence on completion of the felling in the identified areas.

62.

Woodland improvement grants

(1)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

justifies either in a forest plan or management plan that they will deliver one or more of the following–

(i)

improvement of the ecological value of the woodland by reducing deer numbers;

(ii)

improvement of the ecological value of native woodlands, through work related to priority woodland HAPs and SAPs;

(iii)

improvement of the environmental value of non-native woodland, through work related to priority woodland HAPs and SAPs;

(iv)

improvement of the environmental value of even aged planted woodland by restructuring their age and species composition;

(v)

improvement of the environmental value of priority non-woodland habitats within native and non native woodlands; and

(vi)

improvement of the environmental value of priority non woodland habitats within native and non-native woodlands. In the case of non woodland habitat restoration this must not exceed 20% of the area classified as woodland; and

(b)

carries out one or more of the items listed in Table D in Part 2.

Up to F128100% of the standard costs for each item listed in Table D in Part 2 F129and up to 100% of the actual cost capital items listed in Table E in Part 2F130Approved operations must be carried out and paid once during the 5 year contract period.

63.

Support for diversification out with agriculture

(1)

A beneficiary is eligible for payment under this option if the beneficiary is a member of the farm household as defined in Article 35 of Commission Regulation 1974/2006 and–

(a)

demonstrates that there is a market for the proposed product or service which is a diversified activity outwith agriculture and that the beneficiary has or can acquire the skills and resources to provide these on a commercial basis; and

(b)

demonstrates that these diversified activities will improve the household income stream and complement existing agricultural activities.

(2)

The capital investments eligible for funding include tangible or intangible costs related to–

(i)

new or upgraded buildings or structures;

(ii)

changes in land use from agricultural to non agricultural uses;

(iii)

the development or upgrading of services or other infrastructural elements;

(iv)

new machinery or equipment including information technology; and

(v)

general costs related to these expenditures including architects, consultants and engineers fees.

Up to 50% of eligible costs.

64.

Support for the development and creation of micro enterprises

(1)

A beneficiary is eligible for payment under this option if the beneficiary is–

(a)

a land manager (other than a farmer) who diversifies or adds value to their existing land based enterprises to complement or supplement their income from traditional land management activities; or

(b)

an entrepreneur who sets up or develops unique businesses which will contribute to the vibrancy of the rural community, create employment opportunities and/or meet market demand for the provision of certain facilities and services in rural areas;

(2)

For both (a) and (b) in (1) above the capital investments eligible for funding will include tangible or intangible costs related to–

(i)

new or upgraded buildings or structures;

(ii)

the development or upgrading of services or other infrastructural elements;

(iii)

new machinery or equipment including information technology;

(iv)

general costs related to these expenditures including architects, consultants and engineers fees; and

(v)

marketing and promotional costs.

Up to 50% of eligible costs.

65.

Support for renewable energy (non land based)

(1)

A beneficiary is eligible for payment under this option if the beneficiary is a producer network, rural community group or a rural business and the beneficiary–

(a)

develops small scale renewable energy capacity that uses a range of renewable technologies and investment will–

(i)

result in improvement in the viability of any non land based business enterprise;

(ii)

benefit a rural community; and

(iii)

produce environmental benefits;

(b)

where applicable, shows that a viable fuel supply and an adequate installation and after sales support will be available to the end user.

(3)

Renewable devices must be installed by an accredited installer M27.

(4)

Eligible costs include–

(a)

purchase and installation, construction, upgrading or development of infrastructure and/or equipment of renewable device;

(b)

purchase of specialist equipment for harvesting, pre use processing, quality assurance and handling;

(c)

direct costs related to the creation of producer groups, including legal and administrative work in setting up, rental of office accommodation and purchase/rental of office and information technology equipment.

Up to 50% of eligible costs.

66.

Information and awareness raising

(1)

A beneficiary is eligible for payment under this option if the beneficiary is a rural land manager, community group or non profit organisation and the beneficiary–

(a)

provides small scale recreational and interpretational infrastructure, and develops and markets services in relation to access to the countryside through the provision of one or more of the following–

(i)

publications and other media which include information appropriate to the target audience;

(ii)

interpretation panels/trails/signage which must provide information to the public on the area or activities they can see out on a trail;

(iii)

accessibility improvements for the public F131users of all abilities; and

(iv)

coach parking and turning areas for disabled parking and school groups.

(b)

in their application for aid, identifies how they propose to promote and market the project. This must include the activities to be undertaken and written confirmation from their local authority as defined in section 32 of the Land Reform (Scotland) Act 2003 M28 that the beneficiary has liaised with them prior to submitting the application;

(c)

with their application include a 1:10 000 scale map showing the detail of the project including the location of any capital items included in the application. A copy of the map must be submitted by the beneficiary to their local authority as defined in section 32 of the Land Reform (Scotland) Act 2003 prior to submitting their application. Written evidence of receipt of the map by the local authority must be submitted with the application;

(d)

keeps a record of the relevant biosecurity and health and safety requirements undertaken to support this option;

(e)

provides written confirmation that they are not in receipt of other funding sources for any items being applied for under this option;

F132(f)

submits two quotes based on actual costs for each capital item. Where the item can only be supplied by one supplier, one quote is sufficient.

  1. (2)

    F133The beneficiary is eligible for different capital items in each year of the undertaking.

  2. (3)

    This is a five year commitment.

F134Up to 100% of actual costs for capital items up to a maximum of £10,000 for publications and other media and £50,000 for panels/trails/signage. There is no maximum limit for improvements of accessibility for users of all abilities.

67.

Area access management and monitoring, and creation and upgrading of paths and routes

(1)

This is a 5 year commitment.

(2)

A beneficiary is eligible for payment under this option if the beneficiary is a rural land manager, community group or non profit organisation and if they undertake one or more of the following–

(a)

to increase and improve the amount and quality of paths/routes in and around communities, or at locations which experience or have potential for significant visitor use;

(b)

to increase and improve the amount and quality of paths/routes between communities;

(c)

to improve shared path use (multi-use), and use by specific user groups;

(d)

increase and improve the amount and quality of paths/routes to, through and along places of interest;

(e)

improve the integration between access and land management; and

(f)

assist the suitable implementation and monitoring of core paths as defined in accordance with Section 17 of the Land Reform (Scotland) Act 2003 M29;

(3)

In all cases beneficiaries must–

(a)

provide evidence that they have consulted the local authority within the meaning of section 32 of the Land Reform (Scotland) Act 2003, to help co ordinate with local access priorities; and

(b)

undertake one or more of the following activities–

(i)

path/route construction, upgrading and associated works, including those for particular user groups;

(ii)

vegetation reduction to enable access;

(iii)

provision of car parking areas, seats, picnic tables, hard-standings;

(iv)

provision of dog exercise areas close to arrival points;

(v)

provision of safety features if required to facilitate access to viewpoints, water margins and well used areas;

(vi)

management of fields and areas near to communities to integrate access and informal recreational use with productive use including the installation of gates and link paths;

(vii)

manage responsible access in relation to sensitive areas;

(viii)

monitor levels and characteristics of public use including by operation of people-counters and/or surveys;

(ix)

provide signage – signposts, fingerposts, way marks and/or information boards; and

(x)

provides visitor information leaflets.

(4)

Tarmac/bitumen surfaced motor-vehicle tracks are ineligible for upgrading under this option.

(5)

Bridge capital items available under option are only eligible where the bridge is of a type which is not designed for motorised vehicle use, other than one which has been constructed or adapted for use by a person who has a disability. The bridge must be for members of the public exercising their rights under Part 1 of the Land Reform (Scotland) Act 2003 and must link 2 paths or routes together and cannot be used for vehicle infra structure purposes.

(6)

In all cases, a beneficiary must–

(a)

submit a 1:10 000 scale map, with their application for aid, showing the detail of the project and identifying the location and type of path/route and each capital item contained within the proposal;

(b)

submit a copy of the map to their relevant local access authority prior to submitting their application. Written evidence of receipt of the map by the local authority must be submitted with the application;

(c)

ensure all paths and routes and capital items meet the technical specifications contained within the programme guidance, unless the beneficiary provides prior written agreement to any variation to such technical specifications from their local authority as defined in section 32 of the Land Reform (Scotland) Act 2003 M30 prior to submitting their application; and

(d)

with their application, confirms in writing that no other funding mechanism, organisation or individual is enhancing or maintaining any of the paths or facilities identified in the proposal.

Up to 75% of actual costs for capital itemsF135....

68.

Reducing bacterial contamination in watercourses

(1)

A beneficiary is eligible for payment under this option if they are persons or businesses with responsibility for the disposal or treatment of sewage in rural areas, including through septic tanks in sensitive waters such as shellfish growing waters or bathing waters and the beneficiary–

(a)

has a septic tank or other sewage treatment system that meets basic environmental protection criteria, as confirmed by SEPA;

(b)

SEPA confirms that this discharge is in need of additional (secondary or tertiary) treatment in order to meet the microbiological objectives of downstream protected areas, including marine waters; and

(c)

improves the means of disposal or treatment of sewage in a rural area by either or both–

(i)

improvement of a septic tank system; and

(ii)

installation of further treatment including biological treatment or a reed bed.

(2)

Schemes already receiving or projected for funding through Scottish Water developments are ineligible for funding.

One off capital payment of 50% of actual cost of investment in the infrastructure on project completion.

69.

Provision of leisure, recreation, sporting, catering and other rural community services and facilities

(1)

A beneficiary is eligible for payment under this option if the beneficiary–

(a)

is a rural community group;

(b)

provides or improves rural community structures, services or facilities;

(c)

provides evidence that such provision or improvement have economic and environmental sustainability; and

(d)

demonstrates community need and demand for the structure, service or facility to be provided.

Up to 100% of approved eligible costs.

70.

Active management to improve the condition of vernacular rural buildings, archaeological or historic sites and historic landscapes

(1)

A beneficiary is eligible for payment if they are a rural land manager, business, non profit organisation, community group or individual with eligible buildings or sites and if the beneficiary undertakes either or both of the following–

(a)

carries out management works to improve the condition of specified archaeological or historic sites or historic landscapes F136...; or

F137(b)

carries out a programme of specified repair to conserve and enhance the historic fabric of pre 1940 vernacular buildings, excluding buildings designated as scheduled monuments under the Ancient Monuments and Archaeological Areas Act 1979.

(2)

Where a beneficiary undertakes (a) above the following applies–

(a)

the beneficiary must–

(i)

detail, on a map or sketch, the precise area to be managed F138and the location of works and capital items proposed, supported by annotated photographic documentation;

F139(ii)

keep a photographic record of each site before management commences and then after the first year, three years and five years of the management of the site; and;

(iii)

consult Historic Scotland before carrying out any work on a site designated as a scheduled monument under the Ancient Monuments and Archaeological Areas Act 1979 and comply with that Act; and

(b)

a beneficiary is eligible for payment if they undertake any of the following works–

(i)

tree felling and removal, which must be supported by a precautionary survey to assess tree health, historic significance and integrity, and presence of protected species;

(ii)

control of scrub, bracken, regenerating trees and other woody plants;

F140(iii)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(iv)

grazing control. If the site managed is designated under as a scheduled monument under the Ancient Monuments and Archaeological Areas Act 1979, fences, stiles or gates must be located outside the scheduled area. If the site managed is not designated under that Act, fences, stiles or gates must be located at least 10m from the outermost visible features on site F141unless the beneficiary has obtained written confirmation from the local authority that a reduced distance is appropriate;

(v)

earthwork repair and reseeding F142for which archaeological supervision by a qualified and competent person working to the Institute For Archaeologists (IFA) standard or similar recognised standard for archaeological work in the UK is required unless the beneficiary has obtained written confirmation from Historic Scotland, in the case of scheduled monuments, or the local authority, in the case of unscheduled sites, that supervision is not required. Beneficiaries must consult SEPA before importing earth or topsoil to the site and comply with the requirements of F143the Waste Management Licensing (Scotland) Regulations 2011;

F144(vi)

on the basis of specialist advice, consolidation of masonry in ruined buildings including vegetation removal. Work must be restricted to the minimum level of intervention required to prevent further deterioration;

(vii)

removal of recent field-cleared stone from archaeological or historic sites F145for which archaeological supervision by a qualified and competent person working to the Institute For Archaeologists (IFA) standard or similar recognised standard for archaeological work in the UK is required unless the beneficiary has obtained written confirmation from Historic Scotland, in the case of scheduled monuments, or the local authority, in the case of unscheduled sites, that supervision is not required;

(viii)

establishment of a 10 metre unploughed buffer zone around visible archaeological or historic sites; or

(ix)

taking an archaeological site visible as cropmarks in aerial photographs out of cultivation and sowing to grass. When establishing the sward, plough depth must not exceed 100 millimetres; and

F146(c)

a beneficiary must submit receipted invoices in support of payment claims. Works associated with the requirements of F143the Waste Management Licensing (Scotland) Regulations 2011 are ineligible for funding.

(3)

Where a beneficiary undertakes (b) above the following applies–

(a)

a beneficiary must–

(i)

seek advice from the local planning authority regarding the need for planning permission within the meaning of the Town and Country Planning (Scotland) Act 1997 M31, listed building consent within the meaning of the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997 M32 or building warrant and obtain the necessary consents when required; F147...

(ii)

undertake a precautionary survey to assess for the presence of protected species prior to works commencing; F148and

(iii)

submit a map or sketch detailing the precise location of the building to be repaired together with any relevant drawings or plans, supported by annotated photographic documentation showing location of works and capital items proposed;

F149(b)

a beneficiary is eligible for payment if the beneficiary—

(i)

carries out repairs on the historic fabric of the building on a like-for-like basis or the re-instatement of original or historic feature or materials; at least 75% of the walls of the building must survive to the wallhead; and

(ii)

submits receipted invoices in support of payment claims; specialist fees, including architects’ and engineers’ fees, are eligible for payment;

F150(c)

for five years after the beneficiary has received payment—

(i)

the buildings, sites or landscapes, for which works have been funded under this option, must be maintained and not modified or sold; and

(ii)

the buildings must not be used for human residential habitation; and

(d)

this option can be undertaken with other rural priorities options if this does not result in the loss or modification of the historic fabric of the building or the unnecessary loss of original internal fixtures.

For option (a),F151...payment in arrears, F152up to 100% of actual costs incurred during the claim year.

For option (b), one off payment in arrears, F153up to 75% of total project costs incurred. F154For options (a) and (b), specialist fees and statutory consents fees up to a maximum of 12% of the overall project costs.

71.

Enhancing enjoyment and maintaining the character of rural landscapes

(1)

This is a 5 year commitment. Items funded under this option must be maintained for 5 years following the end of the year in which the funding was given.

(2)

A beneficiary is eligible for payment under this option if the beneficiary is a rural land manager, community group or a non profit organisation and if they do one or more of the following–

(a)

screen intrusive structures, storage areas and infrastructure in which case–

(i)

intrusive structures, storage areas and infrastructure must be one or more of the following–

(aa)

visible from accessible viewpoints, public roads and access routes and within 500 metres of features and structures of historic interest;

(bb)

within a NSA, National Park, Regional Park or area near to and easily accessible from communities; or

(cc)

next to path networks, well used access areas and in areas where there is demand for increased access provision;

(ii)

the beneficiary must carry out one or more of the following site clearance and establishment activities–

(aa)

erecting temporary fencing to demarcate works areas where necessary;

(bb)

providing alternative temporary access where appropriate;

(cc)

preparing ground works and draining as necessary;

(dd)

spraying off vegetation when required; or

(ee)

removing non native invasive specifies when required in conjunction with the “Control of invasive non native species” option in this schedule; and

(iii)

the beneficiary must carry out one or more of the following new works–

(aa)

erecting fencing, walls and dyking;

(bb)

planting hedging;

(cc)

creating well shaped earth graded to create gentle slops; or

(dd)

planting trees and shrubs;

(iv)

the applicant must submit with their application for aid, a 1:10 000 map showing the location of the proposals and photographs of the area to be screened;

(b)

create and manage viewpoints which must be within a NSA or from a public road, accessible historic feature and other landmark, access route or designation point within a National Park, Regional Park or within the Inventory of Gardens and Designed Landscape M33 or an area near to and accessible from communities in which case the beneficiary must carry out the following activities–

(i)

initially clear the site by removing trees, scrub and/or structures to reveal views by carrying out one or more of the following–

(aa)

removal of vegetation and relocating fences obstructing the proposed viewpoint to provide a clear, unimpeded view of features or landscape. Activities may include crown lifting, limb removal and thinning of trees;

(bb)

removal of vegetation, trees or structures. Any tree surgery works must be carried out between December and March by a qualified tree surgeon; and

(cc)

any removal of non invasive specifies must be carried out in conjunction with the “Control of invasive non native species” option in this Schedule;

(ii)

manage the viewpoint by carrying out one or more of the following activities annually–

(aa)

reducing the height of scrub and vegetation to ground level through grazing, cutting or flailing vegetation close to the ground. Cutting or flailing must be carried out between August and March; and

(bb)

removing litter from the viewpoint site in spring, summer and autumn;

(iii)

the applicant must submit with their application for aid, a 1:10 000 map showing the location of the proposed viewpoint and any capital items associated with the viewpoint, identifying the location of views from public roads, accessible historic features, access routes and elevated view points; and

(iv)

the applicant must submit photographs of the proposed site of the viewpoint and the view from that site with their application for aid;

(c)

restore or reinstate existing stone walls, dykes and/or flagstone walls as linear features which are deteriorated and/or damaged and locally distinctive building boundary features that contribute to the landscape character and need to be restored and or replaced in which case–

(i)

walls, dykes, flagstone walls and locally distinctive built boundary features must be constructed in the style of, and using methods and material traditional to, the locality. The style, methods and material of the restoration, or reinstatement and replacement must match the adjacent areas of the wall/dyke and for locally distinct built boundary features other similar features on the site. Stone which has obviously fallen from the wall or dyke must be used for the repair;

(ii)

to be eligible dykes must be between 50 and 80% complete and continuous along one field length; and

(iii)

temporary fencing must be used as required while repairs are being undertaken;

(iv)

the following items must be submitted with the application for aid–

(aa)

photographs of the item proposed for restoration, reinstatement and in the case of locally distinctive built boundary features, replacement;

(bb)

a 1:10 000 map identifying the location and extent of such item; and

(cc)

prior written permission from Historic Scotland for any work to sites within the Inventory of Gardens and Designed Landscapes M34 and in the curtilage of a building listed under the Planning (Listed Building and Conservation Areas) (Scotland) Act 1997 M35 monument scheduled pursuant to the Ancient Monuments and Archaeological Areas Act 1979 M36; or

(d)

establishes and manages single and small groups of up to 24 trees as landscape features in which case–

(i)

the tree and/or trees must be visually prominent; and/or accessible to the public; and/or cultural, biodiversity, historic or, landscape interest. In all cases the tree/trees must be either–

(aa)

subject to a Tree Preservation Order under section 160 or 164 of the Town and Country Planning (Scotland) Act 1997 M37, or located within a Conservation Area designated as such pursuant to section 61 of the Planning (Listed Building and Conservation Areas) (Scotland) Act 1997 M38, or listed in the Inventory of Gardens and Designed Landscapes M39;

(bb)

agreed by Historic Scotland to be of inventory standard;

(cc)

within a NSA or a National Park;

(dd)

within an area that is either–

-

near to and accessible from communities;

-

along roadsides; or

-

located where public access is encouraged;

(ii)

the beneficiary must carry out one or more of the following activities–

(aa)

undertake tree surgery and maintenance works by carrying out one or more of the following–

-

a survey of existing tree health and condition by a qualified tree surgeon, arboriculturalist or chartered forester. The survey must include information on the existing health of the tree, current and proposed management activities to expand the tree lifespan and any requirements for planned tree replacement, retention and rejuvenation;

-

felling of trees, pruning of limbs and thinning crowns to make safe, restore, improve the health and secure the longevity of trees. Felling of trees must be carried out by a qualified tree surgeon;

-

coppicing, branch thinning and/or planting to encourage the regeneration and rejuvenation of an appropriate scrub layer within or associated with small woodland features; or

-

the erection of protective fencing appropriate to the historic or landscape character to prevent damage to individual trees from livestock or vehicles;

(bb)

establish or replace a tree or trees by carrying one or more of the following activities–

-

planting standard or semi standard trees. These must be staked at ground level and watered, mulched and fertilised with granular fertiliser following the instructions on the label at the recommended application rate;

-

maintaining new trees and mulch, water, beat up and fertilise at the recommended application rate, annually as appropriate for the first 4 years;

-

protecting trees from livestock, deer, voles, rabbits and hares by the use of tree guards and fencing. Wooden post and rail fencing or metal tree guards must be used. Other materials may be used for fencing where these are characteristic of the historic or landscape character; or

(cc)

establish replacement or new shrub species for single and small groups of up to 24 trees by carrying out one or more of the following–

-

planting shrubs which must be 60 80 cm bare root plants planted at 1 metre spacing in prepared ground with up to a maximum 25% of the area. Shrubs must be watered, mulched and fertilised with granular fertiliser following the instructions on the label at the recommended application rate;

-

maintaining new shrubs and water, weed, beat up, mulch and fertilise at the recommended application rate annually as appropriate for the first 4 years; or

-

protecting shrubs from livestock, deer, voles, rabbits and hares by the use of tree guards and fencing. Wooden post and rail fencing or metal tree guards must be used. Other materials may be used for fencing where these are characteristic of the historic or landscape character; and

(iii)

the beneficiary must–

(aa)

submit with the application for aid, a 1:10 000 map identifying the location and trees proposed for management and/or replacement;

(bb)

submit with the application for aid, consent for the works from local authority if any of the tree/s identified in the proposal lie with a Conservation Area designated as such pursuant to section 61 of the Planning (Listed Building and Conservation Areas) (Scotland) Act 1997 M40 or are subject to a Tree Order under section 160 or 164 of the Town and Country Planning (Scotland) Act 1997 M41; and

(cc)

confirm in the application if any of the trees proposed for management already receive existing protection or management and if so demonstrate how this application goes further than the current protection/ management;

(dd)

submit with the application 2 quotes for the works.

(3)

Items funded in this option must not be adopted in areas where they will compromise biodiversity objectives or will be used to comply with conditions imposed on a grant of planning permission within the meaning of the Town and Country Planning (Scotland) Act 1997 or a condition to which planning permission has granted by virtue of the Town and Country Planning (Scotland) (General Permitted Development) Order 1992 M42.

75% of actual costs for capital items paid in arrears up to £5500 per beneficiary.

72.

Skills development in rural areas

(1)

A beneficiary is eligible for payment under this option if the beneficiary undertakes vocational training courses for individual persons eligible to apply for any of options numbered 63 to 73 in this schedule and the beneficiary is a rural economic actor (including farmers, crofters, foresters and other land managers and community groups), their immediate family members and employees and is 16 years of age or older.

(2)

The following conditions apply–

(a)

the training courses must relate directly to an application for aid under options numbered 63 to 73 in this schedule;

(b)

the training provider must be certified by an appropriate certification body; and

(c)

the course must not–

(i)

form part of normal agricultural, forestry or other programmes at secondary or higher education levels;

(ii)

be required or lead to a certificate, licence, diploma or other qualification that is required by law to carry out the beneficiary's basic work activities; or

(iii)

be funded, in whole or in part, by other public funds.

75% of the cost of training.

F4. . .

F15574.

Removal of vegetation/debris from SSSI Sites notified for their geological features

(1)

This is a capital item with a 5 year commitment attached.

(2)

A beneficiary is eligible for payment under this option for the removal of vegetation and/or debris on F156or adjacent to SSSI Sites notified for their geological features where F157Sites have been assessed by SNH as being in, or at risk of falling into, unfavourable condition either because of living vegetation or accumulated debris is obscuring the site’s special interest or because root growth may adversely affect the geological interest.

F158(3)

A beneficiary must—

(a)

submit, with an application to the Scottish Ministers, a management plan agreed with SNH detailing-

(i)

the current conditions of the special features, including a photographic record;

(ii)

an explanation of the actions, methods and timing to be used including an assessment of the positive effect on each special feature on the site; and

(b)

on completion of the works, submit a report to the Scottish Ministers which shall include-

(i)

a record showing the completion of the agreed outcomes;

(ii)

a photographic record showing the condition of the site following completion of the works;

(iii)

a record of the time spent removing the vegetation/debris from the site; and

(iv)

details of any other agreed costs incurred.

F159(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Up to 100% of actual costs.

F160Up to £11,232.88.

75.

Erosion Control

F161(1)

A beneficiary is eligible for payment under this option on, or adjacent to, SSSI and European sites where the qualifying interests are in, or at risk of falling into unfavourable condition due to the levels of burrowing animal activity.

(2)

The beneficiary must—

(a)

submit, with an application to the Scottish Ministers, a management plan agreed with SNH detailing—

(i)

the current condition of the special features, how the condition of these features is being put at risk by burrowing animals and the outcomes the proposal will deliver;

(ii)

a photographic record of the current condition of the site and burrows;

(iii)

a 10,000 OS scale map showing the area containing active burrows and proposed locations of control devices;

(iv)

an estimate of the density and numbers of burrowing animals at the start and end of the programme;

(v)

the methodology including an assessment of the positive effect on each of the special features;

(vi)

information on the most appropriate timing for the control activity including number of control devices to be deployed;

(vii)

proposed collaboration with neighbouring land managers; and

(viii)

six figure grid references listing the locations of control effort;

(b)

on completion of the works, submit a report to the Scottish Ministers which must include—

(i)

a 10,000 scale OS map showing the area that has been controlled and the hectare covered;

(ii)

the number of animals trapped or shot and the number of burrows gassed and the date of the control;

(iii)

a record showing completion of the agreed outcomes; and

(iv)

a photographic record showing the condition of the site following completion;

(c)

where control of targeted animals is required—

(i)

undertake in a legal and humane manner, live trapping with fen or box traps, gassing with moisture activated compounds and/or shooting and lamping; and

(ii)

comply with all relevant General Licences and the BASC Codes of Practice on Shooting, Lamping and Trapping of Pest Mammals and Birds.

F162(3)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Up to 100% of actual costs F163with a limit of £5,616.44 for undertaking the control programme, net of income from the sale of burrowing animal carcasses. Sale receipts for any such sale of burrowing animals must be submitted with the claim.

76.

Renewable energy powered pumps for water troughs

(1)

This is a capital item with a 5 year commitment attached.

(2)

A beneficiary is eligible for payment for a F164water pumping system under this option where the F164water pumping system installed is powered by renewable energy (solar, wind or water power) and is to provide water to a trough for livestock. F165Payment may be made for the power supply, pump, reservoir tank, battery and associated switches and cabling.

F166(3)

In any 5 year period a beneficiary may make one claim for each F167water pumping system purchased (subject to (2)), to serve each trough or system of troughs and in each case payment will be made in arrears.

Up to 100% of actual costs.

F168Up to £2,500 for a system supplying individual troughs and up to £7,500 for a multiple trough system.

F16977.

Capital works required for SSSI and European Site features which enhance the public amenity value of those features

(1)

This is a capital item with a 5 year commitment attached.

F170(2)

(a)

A beneficiary is eligible for payment under this option on land on SSSI Sites and European site features.

(b)

the list of eligible capital items are set out in table B in Schedule 3.

(c)

the items contained in the table referred to in paragraph (b)—

(i)

may be undertaken only once on each area of land; and

(ii)

are subject to the following specifications:—

(aa)

where the standard cost capital items rate is to be exceeded, beneficiaries must provide full justification to explain why this is necessary;

(bb)

where the standard cost capital items rate is to be exceeded, proposed actions must be accompanied by at least two quotes.

(3)

The beneficiary must agree the eligible costs in advance with the Scottish Ministers.

F171(4)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Up to 100% of actual costs.

F172Up to a maximum of £7,000 per hectare or up to £136,986 whichever is the greater

F17378.Controlled livestock grazing of woodland

  1. (1)

    This is a five year commitment.

  2. (2)

    A beneficiary is eligible for payment under this option if the beneficiary

    1. (a)

      F174has an area of native woodland of at least five hectares; or

    2. (b)

      has an area of F175... native woodlands designated as a Site of Special Scientific Interest; or

    3. (c)

      has an area of Plantation on Ancient Woodland Sites (PAWS) of at least 5 hectares that are actively being restored to native woodland F176; or

    4. (d)

      has an area of non-native woodlands where woodland grazing would benefit specific species such as black grouse; and

  3. (3)
    1. (a)

      implements a sustainable grazing management regime on that land, tailored to individual woodlands to reflect woodland type, grazing history and specific site management objectives;

    2. (b)

      submits an adaptive grazing management plan, agreed with Scottish Ministers. The plan must: include a site appropriate grazing regime determined by using the “Woodland Grazing Toolbox”;

      describing the expected environmental impact of livestock grazing; and taking account of the impact of grazing by wild deer.

    3. (c)

      provides evidence to support the adoption of a grazing management regime with the proposal for aid.

    4. (d)

      undertakes the following commitments:

      1. (i)

        Manages livestock in accordance with the agreed grazing management plan;

      2. (ii)

        Adjusts the livestock grazing regime only in line with the results of the site monitoring requirements detailed within the plan;

      3. (iii)

        Implements a deer management plan agreed by F177Scottish Natural Heritage;

      4. (iv)

        Manages the grazing of the woodland to maintain an appropriate balance between open ground, regenerating trees, scrub and closed canopy woodland;

      5. (v)

        Undertakes periodic monitoring (normally two times per year) and records the impact of the grazing regime in respect of the site specific objectives;

      6. (vi)

        Avoids excessive poaching by stock;

      7. (vii)

        Does not apply pesticides, lime, artificial fertiliser, farmyard manure or slurry to the site except that herbicides may be applied to control injurious weeds under the Weeds Act 1959 and/or non-native invasive plant species using a weed wiper, spot treatment or hand sprayer;

      8. (viii)

        Undertakes supplementary feeding of stock only when it is required to deliver the conservation objectives;

      9. (ix)

        Manages the trees in accordance with the silvicultural system for the woodland specified and agreed in the grazing management plan;

      10. (x)

        Does not install new drainage or modify/improve existing drainage systems. Existing drains can be maintained;

      11. (xi)

        In upland areas where relevant to Capercaillie and Black Grouse marks all new fences with bird strike markers.

£87 per hectare per year

F17879. Creation and management of grassland for hen harriers

(1)This is a 5 year commitment.

(2) There are two elements to this option (A and B) to support hen harriers breeding in Special Protection Areas and Sites of Special Scientific Interest:—

A: Creation and management of rough grassland for hen harriers—

  1. (a)

    Creation and management of rough grassland on arable land;

  1. (a)

    Creation and management of rough grassland on improved grassland;

  1. (a)

    Creation or management of rough grassland on unimproved grass; and

B: Creation and management of rough habitats for hen harriers.

(3) For both elements A and B, a beneficiary is eligible for payment under this option if the beneficiary—

  1. (a)

    provides forage areas for hen harriers, within two kilometres of known hen harrier nest sites;

  1. (a)

    ensures that a dense cover of grass and other plants is created within the forage areas;

  1. (a)

    agrees with the Scottish Ministers a livestock management and grazing plan;

  1. (a)

    unless otherwise agreed with the Scottish Ministers, manages grassland with nil or light grazing with up to 0.15 livestock units per hectare from 1st May to 30th September, to produce a dense cover of grass and thatch for voles to live in;

  1. (a)

    does not apply fertiliser, slurry or farmyard manure to the managed area;

  1. (a)

    does not apply pesticides except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native species;

  1. (a)

    does not carry out supplementary livestock feeding on the site; and

  1. (a)

    where new grassland sward is being created, sows the site with a low productivity grass and herb mix agreed with the Scottish Ministers and uses seeds of local origin wherever possible.

(4) For element A(c), beneficiaries with areas managed under the “creation and management of rough grassland on unimproved grass” option of the Orkney Hen Harrier Scheme are not eligible until contracts under that Scheme have expired.

(5) For element B beneficiaries must maintain the rough vegetation for vole habitat and must not graze the area except in exceptional circumstances where a light grazing regime has been agreed with the Scottish Ministers.

For A(a) £256 per hectare per year

For A(b) £208 per hectare per year

For A(c)

£124 per

hectare per year.

For both A(a) and (b) up to a maximum of

two hectares per year unless a beneficiary has prior written agreement from SNH for a larger area.

For B £33 per hectare per year.

80. Open grazed grassland management for chough

(1) This is a 5 year commitment.

(2) A beneficiary is eligible for payment under this option for farm land on in-bye rotational grassland, permanent grassland, coastal grassland and heath on free draining or sandy soils in the Argyll Islands or in Wigtownshire, which is subject to year round or seasonal grazing, if the beneficiary—

  1. (a)

    manages grazing land to benefit chough by providing them with the conditions essential for them to breed successfully;

  1. (a)

    agrees with the Scottish Ministers a grazing plan setting out a livestock management and grazing regime;

  1. (a)

    includes in the grazing plan the supplementary feeding methods for the livestock including the feeding location and how the feeding will be carried out to ensure that livestock graze the whole unit;

  1. (a)

    maintains an open sward on the site;

  1. (a)

    allows cattle and/or sheep to graze throughout the year or during specific times identified in the grazing plan;

  1. (a)

    manages the sward to create a variable height of more than 1 cm and up to 13cm which can include areas of sparse vegetation except when the field is closed off for silage production when the sward may exceed 13cm;

  1. (a)

    includes in the grazing plan the timing of any grazing breaks;

  1. (a)

    ensures the ground surface is visible and free from a build up of matted vegetation;

  1. (a)

    F179ensures that livestock must only be treated where necessary with non-Avermectin based drugs unless otherwise advised by a veterinary surgeon and with the agreement of the Scottish Ministers;

  1. (a)

    cuts silage on or before F18030th June; F181...

  1. (k)

    does not apply pesticides to the managed area except with the prior written agreement of the Scottish Ministers for activities such as spot treatment of injurious weeds or control of invasive non-native speciesF182; and

  1. (l)

    cuts hay and silage, in accordance with any applicable programme guidance, in a manner which minimises the risk of injury to ground nesting birds

(3) The same field need not be managed each year but the beneficiary must provide details of the fields to be rotated in this way, their location and areas at the application stage. If, during the relevant period, a different rotation to that originally agreed is approved by the Scottish Ministers, the area upon which the annual management payment is calculated will be restricted to either the area originally approved or the revised area, whichever is smaller.

£93.72 per hectare per year

81. Upland habitat management plan

(1) This is a commitment not exceeding 6 years.

(2) A beneficiary is eligible for payment under this option if the beneficiary—

  1. (a)

    where necessary assesses the site, and prepares an upland habitat management plan for upland within or affecting designated SSSI, SAC and SPA sites which are at risk from negative deer or livestock impacts;

  1. (a)

    submits the upland habitat management plan to the Scottish Ministers for approval within a period of 12 months of the commencement of the commitment; and

  1. (a)

    begins implementing the upland habitat management plan within a period of 13 months of commencement of the commitment under this option.

(3) Support will be available where—

  1. (a)

    in the opinion of the Scottish Ministers the areas to be managed are large, have complex management issues or where collaboration by other land managers is required; and

  1. (a)

    either head (i) or head (ii) applies—

  1. (i)

    this head applies where either or both (aa) or (bb) below applies—

  1. (aa)

    deer management can be used to maintain or bring into favourable condition the upland features that are affected by grazing impacts;

  1. (bb)

    deer are present, and in the opinion of the Scottish Ministers, the proposed upland habitat management plan considers whole deer ranges/livestock hefts are sufficient to enable the delivery of option objectives and in the opinion of the Scottish Ministers there is no requirement for compulsory management measures; or

  1. (i)

    livestock only management can be used to maintain or bring into favourable condition the upland features that are affected by impact of grazing.

(4) The upland habitat management plan must—

  1. (a)

    provide an audit of the condition of the upland site and identify how the impact of deer and/or livestock will be minimised;

  1. (a)

    address in an integrated manner the impacts of all grazing animals on the condition of the special features of the site, including deer and livestock;

  1. (a)

    comply with technical guidance for upland habitat management plans and where deer are present, with SNH Best Practice Guidance on Deer Management Plans;

  1. (a)

    detail which habitats are to be assessed and ensure sampling for these assessments is stratified by management units;

  1. (a)

    include achievable targets for enhancing the condition of key habitats within the implementation period of 5 years of the upland habitat management plan;

  1. (a)

    be supported by survey and monitoring information and must be reviewed and updated at the end of each of the first 4 years of the implementation period. In the case of annual deer culls, the review must take place after the cull and by 30th April;

  1. (a)

    take account of its likely impact on neighbouring land and any aspects of neighbouring land that might affect its delivery;

  1. (a)

    within a deer range which includes areas of woodland linked to open range areas, take the impacts of deer on the woodland habitats into account. Plans prepared under option 62 for adjacent woodland must also be taken into account; and

  1. (a)

    include a timetable for preparation and implementation of the upland habitat management plan.

(5) Where deer and/or livestock have free range across management unit boundaries or where livestock and deer management are carried out on the same management unit and neighbouring land managers wish to collaborate they must—

  1. (a)

    establish a forum to consult and agree objectives and actions;

  1. (a)

    consult SNH to ensure the upland range being targeted is biologically viable;

  1. (a)

    ensure the upland habitat management plan includes measures to manage the impact of grazing and trampling over the collaborative area, is prepared by a consultant and provides an overview of how deer and livestock impacts will be managed over the collaborative management area and includes individual plans for each land holding; and

  1. (a)

    divide the costs of preparing the overview among forum participants with each land manager liable for the cost of the plan for their own holding.

(6) Where deer are present, the beneficiary must carry out a habitat impact assessment in the third year of implementing the upland habitat management plan.

(7) Where the habitat impact assessment indicates that the deer management must be adjusted to meet targets, the beneficiary must carry out a deer count by helicopter in the third year or early in the fourth year of implementing the plan to inform changes to the upland habitat management plan in the fourth and fifth year of the implementation period.

(8)Where the habitat impact assessment indicates that a deer count may not be required, the beneficiary must notify the Scottish Ministers before 30th September and the Scottish Ministers may decide that the beneficiary does not need to undertake a deer count by helicopter.

(9)The habitat impact assessment and the deer count by helicopter must comply with the SNH Best Practice guidance.

(10) The beneficiary may enter into different contracts for each element of the upland habitat management plan and is responsible for managing the contracts. Applications for aid must be supported by quotes in accordance with programme guidance.

Site assessment: 100% of actual costs

Upland habitat management plan (including annual reviews):

Deer only: 100% of actual costs up to a

maximum of

£64, 383.56

Deer and livestock:

100% of actual costs up to a maximum of £64,383.56

Livestock only: 100% actual costs, minimum of £600 up to a maximum of £1600

Costs of land managers’ own time are not eligible.

Habitat impact assessment in Year 3

of implementation: 100% of actual costs

Open range deer count, if required, in Year 3 or early Year 4 of implementation: 100% of actual costs.

PART 2

Table A

Land type

Year 1

Year 2

Year 3

Year 4

Year 5

Conversion

Arable

£220

£220

£60

£60

£60

Improved grassland

£105

£105

£50

£50

£50

Fruit & vegetable

£300

£300

£60

£60

£60

Unimproved grassland/ rough grazing

£5

£5

£5

£5

£5

Maintenance

Arable

£60

£60

£60

£60

£60

Improved grassland

£50

£50

£50

£50

£50

Fruit & vegetable

£60

£60

£60

£60

£60

Unimproved grassland/ rough grazing

£5

£5

£5

£5

£5

Table B

Woodland Type

Minimum wood or individual block size planted per year (hectares)

Composition

Minimum stocking density per hectare at year 5 or when considered to be ‘established’

Productive conifer woodland (low cost)

5.0

-

up to 85% conifers but predominantly spruce

-

at least 5% broadleaves

-

up to 10% open ground

Spruce – 2500

Broadleaves – 1100

Productive conifer woodland (high cost)

5.0

-

up to 85% other conifers e.g. Scots Pine, Douglas Fir, Larch

-

at least 5% broadleaves

-

up to 10% open ground

Pine – 3000

Douglas Fir, Larch – 2000

Broadleaves – 1100

Productive broadleaved woodland

2.0

-

at least 85% productive broadleaves e.g. Oak, Beech, Sycamore, Ash

-

up to 5% other broadleaves

-

up to 10% open ground

Oak, Beech – 3100

Sycamore, Ash – 2500

Other Broadleaf – 1100

F183Native and riparian woodland (planting)

0.25

-

at least 75% species native to the locality and appropriate to the site

-

up to 25% open ground

F1831100

F183Native and riparian woodland (natural regeneration)

0.25

-

at least 75% species native to the locality

-

up to 25% open ground

F1831100

Mixed conifer / broadleaf woodland

0.25

-

at least 80% mixed conifer and broadleaves, the latter being at least half of the planted area.

-

up to 20% open ground

Conifer – 2500

Broadleaves – F1831100

F184Native woodland in the Northern and Western Isles

0.25

  • at least 60% native species

  • up to 15% mixed broadleaved

  • up to 25% open ground

3000

Mixed conifer/broadleaved woodland in Central Scotland

0.25

  • up to 20% mixed conifer species

  • up to 80% mixed broadleaved

  • up to 20% open ground

Conifers – 2500

Broadleaved - 2100

F185Table C

Woodland Type

Establishment £/ha *

Maintenance Standard Cost Rate £/ha/year **

Productive conifer woodland (low cost)

1724

161.39

Productive conifer woodland (high cost)

2064

186.40

Productive broadleaved woodland

3317

229.79

Native and riparian (planting model)

2802

218.20

Native and riparian (natural regeneration model)

905

101.60

Mixed conifer/broadleaf woodland

3063

222.40

F186Native woodland in the Northern and Western Isles

5200

360

Mixed conifer/broadleaved woodland in Central Scotland

5000

300

*

Paid as a lump sum on completion of planting.

**

Paid as an annual payment for a period of 5 years. Trees must be satisfactorily ‘established’ within 10 years of planting. Only payable where planting has occurred on agricultural land or abandoned agricultural land (i.e. at least 50% of a woodland type must be on agricultural land and/or abandoned agricultural land to be eligible for the maintenance payments).

The term ‘established’ means that trees must be present to the minimum stocking densities specified, healthy, and in a condition capable of continued growth given no further weeding but subject to normal ongoing maintenance operations such as protection from inappropriate grazing by wild or domestic animals.

An additional establishment premium for using genetically improved planting material is available as follows:

Categories of genetically improved planting material

£ per hectare

Sitka spruce seed orchard material that falls within the tested category in terms of regulation 4 of the Forest Reproductive Material (Great Britain) Regulations 2002

50

Sitka spruce vegetatively propagated tested ‘family mixture’ material derived from controlled cross-pollination.

150

F187Table DStandard Costs for Forestry Operations/Capital Items

Column 1

Column 2

Item

Standard Cost

Fell/extract dangerous trees

£200 per tree

Manual brashing

£0.35 per tree

High pruning

£1.30 per tree

Badger gates installed in fence lines which are cutting across an established badger run

£110 per gate

Respace natural regeneration

£600 per hectare

Early pruning of trees

£375 per hectare

High pruning of trees

£660 per hectare

Woodland thinning

£520 per hectare

Removal of tree crop to waste 3-6 metres high

£1,100 per hectare

Woodland clearance - felling of waste

£975 per hectare

Woodland clearance - felling and extraction

£1375 per hectare

Seedling tree removal

£35 per hectare

Chipping/mulching of tree debris and brash

£500 per hectare

Restructuring with Caledonian Scots pine

£411.64 per hectare

Restructuring with diverse conifers

£411.64 per hectare

Restructuring with mixed broadleaves

£1,030.14 per hectare

Restructuring with native broadleaves

£1,100 per hectare

Restructuring with mixed conifer and broadleaves

£595.89 per hectare

Woodland deer impact reduction

£30 per hectare for deer control during the first 5 years of a Deer Management Plan

Forest plan preparation

£20 per hectare for first 200 hectares, £5 per hectare thereafter with a minimum payment of £400 and a maximum payment of £15,000

Dead wood management

£40 per hectare

Stock fence

£4 per metre

Enhancing/modifying a stock fence in black grouse and capercaillie core areas

£2 per metre

New deer fence

£7.25 per metre

Upgrading stock to deer fence

£2.75 per metre

Scare or temporary fencing

£1.50 per metre

Rabbit proofing – existing or new stock/deer fence

£1.90 per metre

Enhancing/modifying a deer fence in black grouse and capercaillie core areas

£5 per metre

Conversion of deer fence to stock fence in black grouse and capercaillie core areas

£2 per metre

Fence removal

£2 per metre

Gate for stock fence

£100 each

Gate for deer fence

£170 each

Ditch/drain blocking with plastic piling dams: Small ditches (up to 0.5 metres wide and deep)

£60 per dam

Ditch/drain blocking with plastic piling dams: Medium ditches (between 0.5 and 1 metre wide and deep)

£120 per dam

Ditch/drain blocking with plastic piling dams: Large ditches (between 1 and 2 metres wide and 0.5 and 1 metre deep)

£280 per dam

Peat dam

£0.26 per metre of drain or furrow blocked with peat dams. Minimum payment £300

Small scale tree and shrub planting (on a site not exceeding 0.25 hectares)

£2 per tree or shrub

Provision of bat and bird boxes

£15 per box

Primary treatment of bracken

£200/hectare of infested land

Eradication of scrub/woody vegetation: Light vegetation

£600/hectare

Eradication of scrub/woody vegetation: Intermediate vegetation

£850/hectare

Eradication of scrub/woody vegetation: Heavy vegetation

£1250/hectare

Removal from site of the cut shrub/woody vegetation: Light vegetation

£500/hectare

Removal from site of the cut shrub/woody vegetation: Intermediate vegetation

£1050/hectare

Removal from site of the cut shrub/woody vegetation: Heavy vegetation

£1450/hectare

Provision of water troughs to replace traditional watering points

£195 each

Installation of water supply pipe to water trough or pasture pump

£3 per metre of pipe laid

Water trough pump: cattle operated pasture or nose pump

£180 per installed pump

Stock bridge for bog management:

Small bridge

Large bridge (for ditch wider than 1.5 metres)

£170 per bridge

£620 per bridge

Heather management (in black grouse and Capercaillie core areas)

£250/hectare

Manual eradication of rhododendron:

Light infestation/easy access

Medium infestation/access

Difficult access

£4,500 per hectare of infested land

£6,100 per hectare of infested land

£9,500 per hectare of infested land

Mechanised eradication of rhododendron:

Light infestation/easy access

Medium infestation/access

Difficult access

£1,800 per hectare of infested land

£2,400 per hectare of infested land

£2,900 per hectare of infested land

Chemical eradication of rhododendron by foliar or stem injection

£1,500 per hectare of infested land

Self-closing/kissing gate for non-vehicular access

£350 each

Stile

£55 each

Building/restoring drystane or flagstone dykes

£17.50 per square metre

F188Table E –Actual Cost Capital Items

Item Column

Column 2

Applicability

Column 3

Payment

F189Capital works for SSSI Sites (which are high nature value areas) and European sites, which enhance the public amenity value of these features

Only available in exceptional circumstances where additional action or effort is required over and above the standard cost capital items, to maintain or bring the qualifying interests of SSSIs and Natura sites into favourable condition. Beneficiaries must provide justification of why the standard cost capital items and rates are not appropriate and provide details of the work required and the associated costs.

Up to 100% of actual costs

F190Control of rhododendron in geographical areas covered by a regional control strategy for this invasive non-native species in all native and ancient woodlands and in woodlands affected by Phytophthora ramorum (P. ramorum)

Only available in exceptional circumstances where additional action or effort is required over and above the two standard cost items for the eradication of rhododendron.

Up to 100% of actual costs

Beneficiaries must provide justification of why standard cost capital items and rates are not appropriate and provide details of the work required and the associated costs.