Water rights5.

(1)

During the construction of the works, Scottish Water may take from Loch Horn and Loch Lunndaidh, such water as it may require for such construction.

(2)

After completion of the works, in any day, Scottish Water–

(a)

(i)

may take from Loch Horn, a quantity of water not greater than 1730 cubic metres, as measured and recorded by a flowmeter (Works No. 1); and

(ii)

shall ensure that not less than 240 cubic metres of water is discharged from Loch Horn into the Allt Burn, as regulated and measured by an existing v notch weir and gauging post located at Ordnance Survey National Grid Reference NC 8009 0554; and

(b)

(i)

may take from Loch Lunndaidh, a quantity of water not greater than 1570 cubic metres, as measured and recorded by a flowmeter (Works No. 2); and

(ii)

shall ensure that not less than 690 cubic metres of water is discharged from Loch Lunndaidh into the Culmaily Burn, as regulated and measured by an existing v notch weir and gauging post located at Ordnance Survey National Grid reference NC 7928 0030.