- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
5.—(1) During the construction of the works, Scottish Water may take from Loch Horn and Loch Lunndaidh, such water as it may require for such construction.
(2) After completion of the works, in any day, Scottish Water–
(a)
(i)may take from Loch Horn, a quantity of water not greater than 1730 cubic metres, as measured and recorded by a flowmeter (Works No. 1); and
(ii)shall ensure that not less than 240 cubic metres of water is discharged from Loch Horn into the Allt Burn, as regulated and measured by an existing v notch weir and gauging post located at Ordnance Survey National Grid Reference NC 8009 0554; and
(b)
(i)may take from Loch Lunndaidh, a quantity of water not greater than 1570 cubic metres, as measured and recorded by a flowmeter (Works No. 2); and
(ii)shall ensure that not less than 690 cubic metres of water is discharged from Loch Lunndaidh into the Culmaily Burn, as regulated and measured by an existing v notch weir and gauging post located at Ordnance Survey National Grid reference NC 7928 0030.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: