The Scottish Water (Allt Beithe) Water Order 2005
Citation and commencement
1.
This Order may be cited as the Scottish Water (Allt Beithe) Water Order 2005 and shall come into force on 14th October 2005.
Interpretation
2.
In this Order–
“the Act” means the Water (Scotland) Act 1980;
“approved” means approved by the Scottish Ministers;
“day” means a period of 24 hours reckoned from midnight;
“deposited plan” means the plan, prepared in triplicate, docqueted and signed as relative to this Order and marked “The Scottish Water (Allt Beithe) Water Order 2005”, one copy of which is deposited in the office of the Scottish Executive, Victoria Quay, Edinburgh; one in the head office of Scottish Water at Castle House, 6 Castle Drive, Carnegie Campus, Dunfermline, Fife and one in Scottish Water Inverness Area Office, 31 Henderson Drive, Longman North, Inverness, IV1 1TK;
“gauge” includes a gauge, weir or other apparatus for measuring the flow of water;
“intake” includes any work by which water is taken by Scottish Water for the purpose of the undertaking;
“undertaking” means the water undertaking for the time being of Scottish Water;
“works” means the works described in Schedule 1 to this Order and shown on the deposited plan.
Incorporation and application of provisions of Schedule 4 to the Act
3.
Water rights
4.
Subject to the provisions of this Order, Scottish Water may for the purposes of the undertaking and by means of an intake (Work No. 2), take water from the Allt Beithe in the area of the Highland Council.
5.
(1)
During the construction of the works Scottish Water may take from the Allt Beithe such water as it may require for such construction.
(2)
After completion of the works, and when the flow in the Allt Beithe is equal to or greater than 1810 cubic metres per day, Scottish Water may, in any day, take from the Allt Beithe, a quantity of water not greater than 444 cubic metres, all as measured and recorded by an approved gauge (Work No. 5).
(3)
After completion of the works, and when the flow in the Allt Beithe is less than 1810 cubic metres per day, Scottish Water shall not, in any day, take water from the Allt Beithe, such as to cause less than 1366 cubic metres of water to be discharged into the Allt Beithe, all as regulated by a v-notch weir (Work No. 1) and as measured by a staging post (Work No. 3).
6.
If the power to take water conferred by this Order has not been exercised by 31 January 2007 the said power shall cease.
Revocation
7.
Victoria Quay, Edinburgh
SCHEDULE 1
The works referred to in this Order and shown on the deposited plan are:–
Work No. 1:
Installation of a new weir plate to be affixed to the existing concrete weir.
Work No. 2:
Installation of a new orifice plate to replace the existing weir plate.
Work No. 3:
Installation of a new staging post to be fixed to the existing concrete weir.
Work No. 4:
Installation of a new 2 inch compensation flow upstand pipe to a level of 119.769 metres above Ordnance Datum.
Work No. 5:
Installation of an approved gauge, to be located in the existing water treatment works located at NGR 166065 776575, to measure and record the flow abstracted from the Allt Beithe.
SCHEDULE 2
The modifications and adaptations of Schedule 4 to the Act referred to in this Order are–
1.
“In the construction of the works described in Schedule 1 to the Scottish Water (Allt Beithe) Water Order 2005, Scottish Water may deviate laterally to any extent not exceeding the limits of deviation shown on the deposited plan and it may deviate vertically from the levels shown on the deposited plan to any extent:
Provided that–
(a)
no control building shall be constructed at a greater height above the general surface of the ground than that shown on the deposited plan and 2 metres in addition thereto; and
(b)
except for the purposes of crossing a stream, canal, dyke, watercourse or railway, or of crossing any lands where the consent of all persons interested in those lands has been obtained, no pipe or other conduit or aqueduct shall be raised above the surface of the ground otherwise than in accordance with the deposited plan.”.
2.
“If Scottish Water–
(a)
fails to construct or maintain in good order any such gauge as is mentioned in the Scottish Water (Allt Beithe) Water Order 2005, or refuses to allow any person interested to inspect and examine any such gauge or any records made thereby or kept by it in connection therewith or to take copies of any such records; or
(b)
takes any water contrary to the provisions of the Scottish Water (Allt Beithe) Water Order 2005,
it shall, without prejudice to its civil liability, if any, to a person aggrieved, be liable, in the case of an offence under paragraph (a) of this subsection, on summary conviction to a fine not exceeding level 3 on the standard scale, and, in the case of an offence under paragraph (b) of this subsection–
(i)
on summary conviction, to a fine not exceeding the statutory maximum; and
(ii)
on conviction on indictment to a fine.”.